Loading...
HomeMy WebLinkAbout08-07-24 Agenda Packet M eeting L ocation: M unicipal Center 7100 147th Street West Apple Valley, M innesota 55124 August 7, 2024 PLA N N IN G C O MMISSIO N T EN TAT IVE A G EN D A 7:00 P M 1.Call to Order 2.Approve Agenda 3.Approve Consent Agenda Items Consent Agenda Items are considered routine and will be enacted with a single motion, without discussion, unless a commissioner or citizen requests to have any item separately considered. It will then be moved to the land use/action items for consideration. A.Approve Minutes of J uly 17, 2024 Regular Meeting 4.Public Hearings 5.Land Use / Action Items A.C edar Valley Learning C enter Setback Variance - 14420 Glenda Dr - PC24-09-V C onsideration of a variance reducing the C edar Ave setback from 50' to 38' (12' variance) for the construction of a secure vestibule. LO C AT IO N: 14420 Glenda Dr PET IT IO N ER: Independent School District 196 6.Other Business A.Review of Upcoming Schedule and Other Updates Planning Commission - Wednesday, August 21, 2024 - 7:00 p.m. Planning Commission - Wednesday, September 4, 2024 - 7:00 p.m. C ity Council - T hursday, August 8, 2024 - 7:00 p.m. C ity Council - T hursday, August 22, 2024 - 7:00 p.m. 7.Adjourn Regular meetings are broadcast, live, on C harter C ommunications C able C hannel 180 and on the C ity's website at www.applevalleymn.gov I T E M: 3.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:A ugust 7, 2024 S E C T I O N:Consent A genda Description: A pprove Minutes of J uly 17, 2024 Regular Meeting S taff Contact: B reanna Vincent, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: Approve minutes of the regular meeting of J uly 17, 2024. S UM M ARY: T he minutes of the regular Planning Commission meeting is attached for your review and approval. B AC K G RO UND: State statute requires the creation and preservation of meeting minutes which document the official actions and proceedings of public governing bodies. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Minutes CITY OF APPLE VALLEY PLANNING COMMISSION MINUTES July 17, 2024 1. CALL TO ORDER The City of Apple Valley Planning Commission Meeting was called to order by Chair Kurtz at 7:00 p.m. Members Present: Jodi Kurtz, Paul Scanlan, David Schindler, Phil Mahowald, Becky Sandahl, Jeff Prewitt, and Douglas Hlas Member(s) Absent: None City staff members attending: Community Development Director Tim Benetti, Planner Alex, Sharpe, City Attorney Bob Bauer, and Department Assistant Breanna Vincent. 2. APPROVAL OF AGENDA Chair Kurtz asked if there were any changes to the agenda. – None. MOTION: Commissioner Schindler moved, seconded by Commissioner Scanlan, approving the agenda. Roll call vote: Ayes - 7 – Nays – 0. 3. CONSENT ITEMS A. Approval of Minutes of June 5, 2024 MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, approving the minutes of June 5, 2024. Roll call vote: Ayes - 7 – Nays – 0. 4. PUBLIC HEARING A. Homshuk & Bodega 42 Interim Use Permit for Corn Roaster Chair Kurtz opened the public hearing. Planner Sharpe provided a brief presentation. Commissioner Scanlan asked if there were any venting requirements since it will be near residential areas. Planner Sharpe stated that there is no smell and venting is not needed. This may be a consideration for when the ordinance is amended but is not a concern for the interim use permit. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes July 17, 2024 Page 2 of 3 Commissioner Scanlan asked if the loss of parking is a concern. Planner Sharpe stated that they have one extra parking space and the roaster will use two spaces. Since it is a temporary use, an interim use permit can overcome that and allow staff to see the impact. There is on-street parking available, as well as parking spaces north of Gabella. Chair Kurtz asked if the primary customers are pedestrians or those inside the restaurant. Planner Sharpe deferred to the applicant but stated that in his experience, most of the customers are not from inside the restaurant. Most people walk up and pay at the roaster. Commissioner Prewitt asked if the expectation is that the permit would renew each year or would they need Planning Commission approval. Planner Sharpe stated that staff would look to amend the ordinance so that the interim use permit would not be needed yearly. The applicant, Fernando Mellado (6999 152nd St W.), was present for questions and comments. With no further comments or questions, Chair Kurtz closed the public hearing. Although action is not typically taken on the night of an item’s public hearing, commissioners chose to make a motion. MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to recommend approval of an interim use permit for an outdoor corn roaster at 6999 152nd St W., subject to conditions outlined in the draft resolution. Roll call vote: Ayes – 7 – Nays – 0. 5. LAND USE None 6. OTHER BUSINESS A. Review of Upcoming Schedule and Other Updates The next Planning Commission meeting is scheduled for Wednesday, August 7, 2024, 7:00 p.m. The next City Council meeting is Thursday, July 25, 2024, 7:00 p.m. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes July 17, 2024 Page 3 of 3 7. ADJOURNMENT Chair Kurtz asked for a motion to adjourn. MOTION: Commissioner Schindler moved, seconded by Commissioner Scanlan, to adjourn the meeting at 7:23 p.m. Roll call vote: Ayes – 7 – Nays – 0. Respectfully submitted, ______________________________________ Breanna Vincent, Planning Department Assistant Approved by the Apple Valley Planning Commission on 08/07/2024 . Jodi Kurtz, Chair I T E M: 5.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:A ugust 7, 2024 S E C T I O N:L and Use / Action I tems Description: Cedar Valley L earning Center Setback Variance - 14420 Glenda Dr - P C24-09-V S taff Contact: S ydnee Stroeing, A ssociate P lanner Department / Division: Community Development Department Applicant: I ndependent School District 196 P roject Number: P C24-09-V Applicant Date: 7/15/2024 60 Days: 9/13/2024 120 Days: 11/12/2024 AC T I O N RE Q UE S T E D: If the Planning C ommission concurs, the following motion would be recommended: Recommend approval of a variance reducing the setback for a vestibule addition from 50' to 38' from C edar Avenue based on the findings listed below and subject to the conditions listed below. F indings: 1. T he property is zoned LB ("Limited Business"). T his zone requires a 50' building setback from Cedar Avenue. 2. T he building is in the southeast corner of the subject property. T he southeast corner of the building abuts the 50' building setback. 3. T he building was constructed in 1993 as a realty office. T he property is now owned by ISD 196 and is used as an education facility. T he current layout of the building was established and is consistent with what was permitted in 1993. 4. T he applicant is requesting a variance to reduce the building setback from C edar Avenue from 50' to 38' to construct a vestibule addition to increase security and manage visitors at the facility. 5. T he existing entrance is located on the north side of the building. T his entrance limits security and visitor management because it provides direct access to the elevator and primary stairs in the building. 6. T he existing, secondary east entrance does not provide direct access to the elevator or stairs. A secure vestibule addition at the east entrance would limit access to restricted areas and allow staff to direct visitors. 7. A reduced building setback would not be inconsistent with the Cedar Avenue area. Multiple buildings along the C edar Avenue corridor have setbacks of less than 50'. 8. No significant trees are planned to be removed from construction of the vestibule. C o ndi ti ons (See the attached draft resolution, subject to City Attorney review and approval): 1. Construction shall occur in conformance with the site plan received J uly 2, 2024, on file in City offices. 2. Construction shall occur in conformance with the elevation plan received August 1, 2024, on file in C ity offices. 3. No trees shall be removed, except as authorized as part of the N RMP. S UM M ARY: Independent School District 196 is requesting a setback variance from C edar Avenue to construct a vestibule addition at the C edar Valley Learning C enter (C VLC ) located at 14420 Glenda Dr. T he C VLC building is situated in the southeast corner of the property with the vestibule addition proposed to be located on the east side of the building. T he vestibule will encroach up to 12' into the 50' building setback. C VLC provides educational services and classes for all ages -- children to adults. T he vestibule addition will be used to secure the building and manage visitors. B AC K G RO UND: Existing C onditions: T he C VLC building was originally permitted in 1993 as a realty office. T he layout of the building, including the elevator and primary stairs, was established and is consistent with what was permitted in 1993. District 196 has been making physical alterations and additions to existing buildings to increase security at its facilities. C VLC provides educational services for varying age groups and has multiple classrooms throughout the building. T he current north entrance includes a vestibule area with direct access to an elevator and the primary stairs. T he existing entrance is not secure and allows visitors to access areas of the building without checking in with staff. Reason for Variance Request: To secure the building, the District would like to add a secure vestibule to the secondary east entrance. T he vestibule cannot be constructed without encroaching into the 50' building setback. T he existing primary entrance cannot be secured without additional measures to remove access to the elevator and stairs. T he applicant states the most functional option to enhance security and manage visitors would be to re-establish the east entrance with the vestibule addition. Cedar Avenue Reduced Building Setbacks: Buildings along C edar Avenue have varying setback distances due to differing zoning district requirements and approved variances. A reduction in a Cedar Avenue building setback would not be unprecedented. Definition of "Practical Difficulties": T he applicant proposes to use the property in a reasonable manner not permitted by the zoning provisions of the code; T he plight of the applicant is due to circumstances unique to the property not created by the applicant; and T he variance, if granted, will not alter the essential character of the locality. Economic considerations alone do not constitute practical difficulties. Factors for Finding a Practical Difficulty: In order to grant a variance, the C ity considers the following factors to determine whether the applicant established that there are practical difficulties in complying with the provision(s) of this C hapter (Chapter 155, Zoning): 1. Special conditions apply to the structure or land in question that are particular to the property and do not apply generally to other land or structure in the district or vicinity in which the land is located; 2. T he granting of the proposed variance will not be contrary to the intent of this chapter; 3. T he special conditions or circumstances do not result from the actions of the owner/applicant; 4. T he granting of the variance will not merely serve as a convenience to the applicant, but is necessary to alleviate practical difficulties in complying with the zoning provisions of this C ode; and 5. T he variance requested is the minimum variance necessary to alleviate the practical difficulty. Summary of Findings: T he north entrance limits building security and visitor management. T he secondary east entrance would remedy this issue by adding a secure vestibule addition that allows staff to check in visitors and deny access to other areas of the building. T he proposed vestibule would encroach a maximum of 12' into the 50' C edar Avenue setback area. Multiple buildings abutting C edar Avenue have setbacks reduced from 50'. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Applicant L etter L ocation Map Z oning Map Plan S et Elevations Resolution Exhibit MEMORANDUM To: Sydnee Stroeing, City of Apple Valley From: Sean Kelly | SK Date: July 10, 2024 Comm. No: 242050 Subject: Independent School District #196 Cedar Valley Learning Center Secure Entrance Addition Variance Request As part of the Independent School District #196 May 9, 2023 successful bond referendum, several District facilities will receive security improvements which, in some instances, include physical alterations and additions to existing building. The Cedar Valley Learning Center (CVLC) located at 14420 Glenda Drive, Apple Valley, Minnesota 55124 has been identified as one of the District’s facilities that is in need of physical alterations to improve building security and visitor management. The primary scope of work at the CVLC includes a new secure vestibule entrance addition to allow building administration to better manage daily visitors and overall building security. The first choice would be to construct the new secure entrance vestibule at the current main entrance on the north elevation of the building adjacent to the existing parking lot, however, this option presents significant functional challenges. The existing primary stair and elevator are located immediately inside of the main entrance doors, within the existing vestibule. Currently, the stair and elevator allow visitors to move freely to the lower level of the building without needing to directly check in with building staff, this is the primary security issue of the existing facility. Any vestibule addition at the existing main building entrance will not improve upon this primary dysfunction. Based on the existing building conditions and security improvement needs of the District, the proposed location of the new secure entrance vestibule, as outlined in the submittal drawings, will re-establish the original east building entrance located adjacent to Cedar Avenue. As this approach developed, it became immediately clear that any addition to the east side of the existing building would encroach upon the 50 foot setback requirement along Cedar Avenue. In light of this, we have determined that the east building entrance is the only fiscally and functionally feasible location to build a new secure entrance vestibule and herby request a variance to the 50 foot setback requirement. cc: Stephanie Rudie, ISD #196 Mark Stotts, ISD #196 Scott McQueen, Wold BK/EDU-MN-ISD196/LC_Cedar Valley/242050/Admin/Letters/2024.07.10 Memo to Sydnee Stroeing CE D A R A V E GL E N D A D R 145TH ST W 143RD ST W GL A Z I E R A V E GR A N A D A D R G L A D I O L A C T 14 3 R D S T R E E T C T W 143RD ST W CE D A R A V E 143RD STREET CT W ^ ¯Cedar Valley Learning Center Setback Variance Location Map 0 200 400 Feet SITE P P LB RB GB RB LB LB GB LB PD- 1087 M-4C M-6C M-4C M-6C CE D A R A V E GL E N D A D R 145TH ST W 143RD ST W GL A Z I E R A V E GR A N A D A D R G L A D I O L A C T 14 3 R D S T R E E T C T W 143RD ST W CE D A R A V E ^ ¯Cedar Valley Learning Center Setback Variance Zoning Map 0 200 400 Feet SITE H G F E D C B A 1 2 3 4 5 6 7 8 109 MN Set No: Comm No: 5985 Bandel Road NW Rochester, MN 55901 knutsonconstruction.com | 507 280 9788 7/ 2 / 2 0 2 4 1 : 3 9 : 1 0 P M Au t o d e s k D o c s : / / 2 3 9 9 9 9 - L C _ C e d a r V a l l e y S e c u r i t y I mp r o v e m e n t s / 2 3 9 9 9 9 _ C V L C B A S E ( R 2 3 ) N E W . r v t CEDAR VALLEY LEARNING CENTER RENOVATION Independent School District #196 Rosemount, MN NOT FOR CONSTRUCTION CITY SUBMITTAL Ce n t r a l : \ \ M i n n e s o t a \ S t P a u l \ I S D 1 9 6 \ C e d a r L e a r n i n g \ 1 0 2 20 1 \ A B E _ E C F E _ 1 0 2 2 0 1 . r v t ISD #196 CEDAR VALLEY LEARNING CENTER RENOVATION 14445 DIAMOND PATH WEST ROSEMOUNT, MN 55068 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 CIVIL C0.01 REMOVALS PLAN C1.01 SITE PLAN C2.01 EROSION CONTROL PLAN C3.01 GRADING AND DRAINAGE PLAN C4.01 UTILITY PLAN C5.01 SITE DETAILS ARCHITECTURAL V1.00 COVER SHEET V1.01 CEDAR VALLEY LC - VARIANCE V1.02 CEDAR VALLEY LC - VARIANCE SURVEY S1.0 SITE SURVEY X X X X X X X 1 1 N X X X X X X X X X X X X 6 PA R C E L 9 1 REMOVE ASPHALT PROTECT ASPHALT REMOVE TREE / SHRUB REMOVE TREE / SHRUB SALVAGE ROCK FOR REINSTALLATION PROTECT CONCRETE REFER TO UTILITY PLAN FOR TREATMENT DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C0.01 REMOVALS PLAN 1.REFER TO SHEET C3.01, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES. 2.MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING VEGETATION AND SITE FEATURES (CURBS, WALKS, PAVEMENTS, OVERHEAD AND UNDERGROUND UTILITIES, SIGNAGE, FENCING, ROADWAYS, ETC.) WHICH ARE TO REMAIN. 3.REPAIR OR REPLACE EXISTING PROPERTY AND SITE FEATURES, INCLUDING GRASS AND VEGETATION, WHICH IS TO REMAIN THAT IS DAMAGED BY THE WORK, TO THE OWNER'S SATISFACTION AND AT NO ADDITIONAL COST TO THE OWNER. 4.VISIT THE SITE PRIOR TO BIDDING; BE FAMILIAR WITH ACTUAL CONDITIONS IN THE FIELD. EXTRA COMPENSATION WILL NOT BE ALLOWED FOR CONDITIONS WHICH COULD HAVE BEEN DETERMINED OR ANTICIPATED BY EXAMINATION OF THE SITE, THE CONTRACT DRAWINGS AND THE INFORMATION AVAILABLE PERTAINING TO EXISTING SOILS, UTILITIES AND OTHER SITE CHARACTERISTICS. 5.HIRE THE SERVICES OF A UTILITY LOCATOR COMPANY TO LOCATE ALL PRIVATELY OWNED UTILITIES THAT MAY BE DISTURBED BY CONSTRUCTION OPERATIONS. 6.MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER, INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, AND SIMILAR. DO NOT REMOVE EXISTING STORM SEWER UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED. NOTES ASPHALT PAVEMENT REMOVALS SAWCUT TREE / SHRUB REMOVAL MASS TREE AND SHRUB REMOVALS PROPERTY LINE LEGEND R Feet 0 20 40 X X X X X X X X X X X X 6 PA R C E L 9 1 PROPOSED BUILDING ADDITION REFER TO ARCHITECTURAL PLAN FOR DIMENSIONS AND LAYOUT INSTALL SALVAGE STONE 7 C5.01 8 C5.01 8 C5.01 6 C5.01 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C1.01 SITE PLAN 1.REFER TO SHEET C3.01, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES. 2.CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 3.ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD, WHICH ARE NOT DESIGNATED TO BE PAVED, SHALL RECEIVE AT LEAST 6” OF TOPSOIL AND SHALL BE SODDED. 4.WHERE NEW SOD MEETS EXISTING SOD, CUT A CLEAN, SHARP EDGE TO ALLOW FOR A CONSISTENT, UNIFORM, AND STRAIGHT JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS. JAGGED OR UNEVEN JOINTS WILL NOT BE ACCEPTED. REMOVE TOPSOIL AT THE JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS, AS REQUIRED, TO ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING TURFGRASS SURFACE. 5.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, RE-SOD ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER OR LANDSCAPE ARCHITECT. NOTES REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) PROPOSED CONCRETE WALK PROPOSED LIGHT DUTY ASPHALT PAVEMENT APPROXIMATE SOD LIMITS PROPOSED LANDSCAPE ROCK BED PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND 1 C5.01 R Feet 0 20 40 7 C5.01 8 C5.01 X X X X X X X X X X X X 6 PA R C E L 9 1 PROPOSED BUILDING ADDITION IP 59.3 ME 59.2 ME 59.6 ME 59.0 ME 59.1 ME 59.0 ME 59.1 ME 59.8 ME 60.8 ME 61.3 ME 61.1 ME 60.8 ME 60.6 ME 60.6 ME60.6 ME60.6 ME60.8 ME 61.3 ME 61.3 ME 61.4 ME 61.8 61.3 61.3 61.3 61.3 61.8 ME 61.5 61.6 61.0 60.5 60.2 59.9 59.8 60.1 60.4 60.7 60.6 60.9 60.8 61.15 61.03 61.00 61.19 61.00 61.7 61.7 61.0 61.061.1 60.8 61.09 61.5 ME 59.0 ME 61.2 ME 61.1 ME 96 0 961 961 961 9 6 2 CONCRETE WASHOUT - POST WITH SIGN PROVIDE DAILY SWEEPING OF PAVED AREAS SF SF SF S F S F SF SF SF SF SF SF SF SF SF 1 C5.01 1 C5.01 1 C5.01 1 C5.01 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C2.01 EROSION CONTROL PLAN 1.REFER TO SHEET C3.01, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES. 2.MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. 3.MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. 4.ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND OTHER LOCAL REGULATIONS. 5.IF EROSION AND SEDIMENT CONTROL MEASURES TAKEN ARE NOT ADEQUATE AND RESULT IN DOWNSTREAM SEDIMENTATION, CLEAN OUT DOWNSTREAM STORM SEWERS AND OTHER CONVEYANCE DEVICES AS NECESSARY, INCLUDING ASSOCIATED RESTORATION. 6.INLET PROTECTION DEVICE AT STORM SEWER INLETS. AT THE INLETS TO ALL STORM SEWER STRUCTURES, PROVIDE A PRODUCT FROM THE FOLLOWING LIST OF APPROVED PRODUCTS: a.ROAD DRAIN "TOP SLAB", MANUFACTURED BY WIMCO b.ROAD DRAIN "CURB & GUTTER", MANUFACTURED BY WIMCO c.INFRASAFE "SEDIMENT CONTROL BARRIER", MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. d.INFRASAFE "DEBRIS COLLECTION DEVICE", MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. e.DANDY SACK, MANUFACTURED BY DANDY PRODUCTS, INC. f.DANDY CURB SACK, MANUFACTURED BY DANDY PRODUCTS, INC. g.OR APPROVED EQUAL. 8.PRIOR TO CONSTRUCTION, DELINEATE TURF AND VEGETATED AREAS NOT TO BE DISTURBED WITH ORANGE SNOW FENCE. DO NOT ALLOW CONSTRUCTION TRAFFIC, EQUIPMENT, OR MATERIALS TO UTILIZE, ACCESS, OR OTHERWISE ENTER THE DELINEATED AREAS. MINIMIZE SOIL COMPACTION AND DISRUPTION OF TOPSOIL IN AREAS OUTSIDE THE CONSTRUCTION LIMITS TO COMPLY WITH THE MN CONSTRUCTION STORMWATER PERMIT. NOTES 960 60.1 SF SF REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED DRAIN TILE (DT) INLET PROTECTION DEVICE AT STORM SEWER INLET PROPOSED SILT FENCE PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND IP 1 C5.01 R Feet 0 20 40 X X X X X X X X X X X X 6 PA R C E L 9 1 PROPOSED BUILDING ADDITION FFE = 961.8 / ARCH. 100'-0" 59.3 ME 59.2 ME 59.6 ME 59.0 ME 59.1 ME 59.0 ME 59.1 ME 59.8 ME 60.8 ME 61.3 ME 61.1 ME 60.8 ME 60.6 ME 60.6 ME60.6 ME60.6 ME60.8 ME 61.3 ME 61.3 ME 61.4 ME 61.8 61.3 61.3 61.3 61.3 61.8 ME 61.5 61.6 61.0 60.5 60.2 59.9 59.8 60.1 60.4 60.7 60.6 60.9 60.8 61.15 61.03 61.00 61.19 61.00 61.7 61.7 61.0 61.061.1 60.8 61.09 61.5 ME 59.0 ME 61.2 ME 61.1 ME 96 0 961 961 961 9 6 2 FFE = 961.8 / ARCH. 100'-0" 3 C5.01 4 C5.01 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C3.01 GRADING AND DRAINAGE PLAN 1.ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE STATE AND LOCAL ORDINANCES. 2.THE CONTRACTOR WILL BE RESPONSIBLE FOR AND SHALL PAY FOR ALL CONSTRUCTION STAKING / LAYOUT. 3.OBTAIN AND PAY FOR ALL RELATED CONSTRUCTION PERMITS. SUBMIT A COPY OF ALL PERMITS TO THE CITY. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL SIGNAGE (CONSTRUCTION ZONES) NECESSARY TO CONSTRUCT PROPOSED IMPROVEMENTS. ALL SIGNAGE LAYOUTS MUST BE DESIGNED BY THE CONTRACTOR AND APPROVED BY LOCAL AUTHORITIES. 5.INSTALL CONTROL FENCING AND BARRICADING AS NECESSARY TO PROTECT THE PUBLIC. 6.INSPECT SITE AND REVIEW SOIL BORINGS TO DETERMINE EXTENT OF WORK AND NATURE OF MATERIALS TO BE HANDLED. 7.REFER TO SPECIFICATIONS FOR DEWATERING REQUIREMENTS. 8.CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 9.REFER TO ARCHITECTURAL PLANS FOR BUILDING AND STOOP DIMENSIONS AND LAYOUT. 10.MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. 11.MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. 12.ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND LOCAL REGULATIONS. 13.MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING SITE FEATURES (INCLUDING TURF AND VEGETATION) WHICH ARE TO REMAIN. 14.PROPOSED CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISH GRADE UNLESS OTHERWISE NOTED. 15.PROPOSED ELEVATIONS SHOWN TYPICALLY AS 60.1 OR 60 SHALL BE UNDERSTOOD TO MEAN 1060.1 OR 1060. 16.SPOT ELEVATIONS WITH LABELS OUTSIDE THE BUILDING PERIMETER INDICATE PROPOSED GRADES OUTSIDE THE BUILDING. SPOT ELEVATIONS WITH LABELS INSIDE THE BUILDING PERIMETER INDICATE PROPOSED FINISH FLOOR ELEVATIONS. 17.THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF CUT, FILL AND WASTE MATERIALS TO BE HANDLED, AND FOR AMOUNT OF GRADING TO BE DONE IN ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON THE DRAWINGS. IMPORT SUITABLE MATERIAL AND EXPORT UNSUITABLE / EXCESS / WASTE MATERIAL, AS REQUIRED, AT NO ADDITIONAL COST TO THE OWNER. 18.NO FINISHED SLOPES SHALL EXCEED 4' HORIZONTAL TO 1' VERTICAL (4:1), UNLESS OTHERWISE NOTED. 19.ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD, WHICH ARE NOT DESIGNATED TO BE PAVED, SHALL RECEIVE AT LEAST 6” OF TOPSOIL AND SHALL BE SODDED. 20.WHERE NEW SOD MEETS EXISTING SOD, CUT A CLEAN, SHARP EDGE TO ALLOW FOR A CONSISTENT, UNIFORM, AND STRAIGHT JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS. JAGGED OR UNEVEN JOINTS WILL NOT BE ACCEPTED. REMOVE TOPSOIL AT THE JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS, AS REQUIRED, TO ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING TURFGRASS SURFACE. 21.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, RE-SOD ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER OR LANDSCAPE ARCHITECT. 22.FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES: a.IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL STORM SEWER STRUCTURES. b.ACCEPTABLE MANUFACTURERS / PRODUCTS: i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS” ii. PRESS-SEAL, WATERSTOP GROUTING RINGS” iii. OR APPROVED EQUAL. 23.INSTALL DRAIN TILE AND OTHER POTENTIAL SOURCES OF CONTAMINATION AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 24.LOCATE ALL EXISTING UTILITIES. VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES. BEFORE BEGINNING CONSTRUCTION. 25.MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER, INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, AND SIMILAR. DO NOT REMOVE EXISTING STORM SEWER UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED. GENERAL NOTES SB-1 TP X 960 60.1 REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR EXISTING SPOT ELEVATION PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING PROPOSED GRADING LIMITS PROPOSED SAND SUBBASE AT FROST FOOTED STOOPS APPROXIMATE SOIL BORING / TEST PIT LOCATION PROPOSED STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND 1 C5.01 R Feet 0 20 40 1.)MNDOT MONUMENT "PARTNER". Elevation = 968.26 feet (NAVD 1988) 2.)TOP NUT HYDRANT ON THE SOUTH SIDE OF THE PARKING LOT OF CEDAR VALLEY LEARNING CENTER. Elevation = 960.64 feet (NAVD 1988) BENCHMARKS (FIELD VERIFY BEFORE USING) REFER TO SPEC 31 00 00 EARTHWORK AND UNIT PRICES. REFER TO SPECIFICATION 31 00 00 FOR PROCEDURE ON HOW TO CALCULATE ACTUAL SOIL CORRECTION QUANTITIES. INCLUDE THE FOLLOWING QUANTITY FOR THE BUILDING PAD SOIL CORRECTION IN THE LUMP SUM BASE BID: 30 CUBIC YARDS BUILDING PAD SOIL CORRECTION QUANTITY X X X X X X X X X X X X 6 PA R C E L 9 1 PROPOSED BUILDING ADDITION >> > > > > > > > > > > > > > > > > > > > > >> >> CONNECT DT TO EXISTING CATCH BASIN @ INV. = 954.50 AND PROVIDE BACKWATER VALVE 5 C5.01 59.3 ME 59.2 ME 59.6 ME 59.0 ME 59.1 ME 59.0 ME 59.1 ME 59.8 ME 60.8 ME 61.3 ME 61.1 ME 60.8 ME 60.6 ME 60.6 ME60.6 ME60.6 ME60.8 ME 61.3 ME 61.3 ME 61.4 ME 61.8 61.3 61.3 61.3 61.3 61.8 ME 61.5 61.6 61.0 60.5 60.2 59.9 59.8 60.1 60.4 60.7 60.6 60.9 60.8 61.15 61.03 61.00 61.19 61.00 61.7 61.7 61.0 61.061.1 60.8 61.09 61.5 ME 59.0 ME 61.2 ME 61.1 ME 96 0 961 961 961 9 6 2 FFE = 961.8 / ARCH. 100'-0" 4 C5.01 6 C5.01 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C4.01 UTILITY PLAN 1.REFER TO SHEET CXXX, XXXXXXX, FOR GENERAL NOTES. 2.ALL WATERMAIN PIPE SHALL BE DIP, CLASS 52. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). DIP SHALL BE ENCASED WITH POLYETHYLENE FILM CONFORMING TO ASTM D 1248-889. 3.ALL WATERMAIN SHALL BE AWWA C900, CAST IRON OD, DR 18, PVC PIPE INSTALLED IN ACCORDANCE WITH ASTM D2321. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). 4.ALL SANITARY SEWER PIPE SHALL BE PVC PIPE (ASTM D 3034, SDR 26), UNLESS OTHERWISE NOTED. SANITARY SEWER INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321. 5.ALL SANITARY SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 6.ALL STORM SEWER PIPE SHALL BE RCP, CLASS III (MIN.), WITH FLEXIBLE WATERTIGHT JOINTS IN ACCORDANCE WITH ASTM C-361 OR PVC PIPE (ASTM D3034, SDR 35) INSTALLED IN ACCORDANCE WITH ASTM D2321, UNLESS OTHERWISE NOTED. 7.ALL STORM SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 8.FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES: a.IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL STORM SEWER STRUCTURES. b.ACCEPTABLE MANUFACTURERS / PRODUCTS: i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS” ii. PRESS-SEAL, WATERSTOP GROUTING RINGS” iii. OR APPROVED EQUAL. 9.INSTALL WATERMAIN AT LEAST 10 FEET HORIZONTALLY FROM ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER, DRAIN TILE, OR OTHER POTENTIAL SOURCE FOR CONTAMINATION PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 10.INSTALL MANOLES, CATCH BASINS, STORM SEWER, SANITARY SEWER, DRAIN TILE, AND OTHER POTENTIAL SOURCES OF CONTAMINATION AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 11.LOCATE ALL EXISTING UTILITIES. VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 12.PRIOR TO CONSTRUCTION OF PROPOSED BUILDING UTILITY SERVICES (STORM, SANITARY SEWER, WATERMAIN), VERIFY ALL PROPOSED BUILDING UTILITY SERVICE PIPE SIZES, LOCATIONS AND ELEVATIONS WITH MECHANICAL PLANS. COORDINATE CONSTRUCTION AND CONNECTIONS WITH MECHANICAL CONTRACTOR. 13.MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER, INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, AND SIMILAR. DO NOT REMOVE EXISTING STORM SEWER UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED. 14.STAKE LIMITS OF WALKS AND CURBING PRIOR TO INSTALLATION OF GATE VALVES, CATCH BASINS, AND MANHOLES. ADJUST GATE VALVE AND MANHOLE LOCATIONS TO AVOID PLACEMENT OF THESE STRUCTURES IN WALKS AND CURB AND GUTTER. STAKE CURB AND GUTTER ALIGNMENTS TO ALLOW CURB INLET TYPE CATCH BASINS TO PROPERLY ALIGN WITH CURB AND GUTTER NOTES 960 60.1 REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR EXISTING SPOT ELEVATION PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING PROPOSED GRADING LIMITS PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE >>>> LEGEND 1 C5.01 R Feet 0 20 40 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North R 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com As WILLIAM J. DIEDE 05/30/202459532 232087 05/30/2024 MET DAR As Indicated MINNESOTA PROFESSIONAL ENGINEER CEDAR VALLEY 3455 153RD STREET WEST 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 LEARNING CENTER APPLE VALLEY - EAGAN ISD #196: ROSEMOUNT - ROSEMOUNT, MINNESOTA 55068 PUBLIC SCHOOLS RENOVATIOON 3300 FERNBROOK ROAD, SUITE 300 PLYMOUTH, MINNESOTA 55447 Phone: (763) 544-7129 Email: Plymouth@bolton-menk.com www.bolton-menk.com C5.01 SITE DETAILS NORMAL USE POSTS: (IF USED WITHOUT SUPPORT FENCE) WOOD 2" SQ. (MIN) @ 4' (MAX) SPACING METAL 0.95 lbs/lf (MIN.) @ 6' (MAX) SPACING DIRECTION OF RUNOFF FLOW NOTE: DEPENDING UPON CONFIGURATION, ATTACH TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES 6" MIN. 6" MIN. 24" MIN. BURY DEPTH (METAL) 18" MIN BURY DEPTH (WOOD) 30" MIN. 1 C5.01 SILT FENCE NOT TO SCALE 5' MIN. LENGTH POST (METAL) 4' MIN. LENGTH POST (WOOD) SILT FENCE FABRIC OVERLAP FABRIC 6" AND FASTEN @ 2' INTERVALS EXTEND WIRE MESH INTO TRENCH FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOIL NATURAL SOIL METAL STAKE OR WOOD POST OPTIONAL SUPPORT FENCE (WIRE MESH) 10 " 6" UNSUITABLE SOIL TOPSOIL REFER TO STRUCTURAL DRAWINGS 3'-0" 1 1 VA R I E S NOTES: 1.BOTTOM OF EXCAVATION MUST BE APPROVED BY THE GEOTECHNICAL ENGINEER'S REPRESENTATIVE PRIOR TO PLACEMENT OF ANY FILL. 3 C5.01 ENGINEERED FILL NOT TO SCALE 4" SLAB AND 6" STABILIZED AGGREGATE BASE - VERIFY WITH ARCHITECTURAL PLANS FINISH FLOOR SUBGRADE FINISH GRADE (TURF) MINIMUM EXCAVATION LIMITS FOOTING SUITABLE SOIL ENGINEERED FILL 5'-0"20'-0" 5' - 0 " 6' - 0 " 4" NOTE: REFER TO GRADING AND DRAINAGE PLAN FOR LIMITS OF SAND SUBBASE 4 C5.01 SAND SUBBASE / DRAIN TILE AT DOORS & FROST FOOTED STOOPS NOT TO SCALE FINISH GRADE AT EDGE OF STOOP FINISH GRADE OF PAVEMENT ADJACENT TO FOOTED STOOP STOOP FOOTING - REFER TO STRUCTURAL DRAWINGS 6" DRAIN TILE (WHERE INDICATED ON DRAWINGS) - EXTEND TO STORM SEWER STRUCTURE WHERE INDICATED ON DRAWINGS SUBGRADE SOILS SAND SUBBASE SHT# DET# FLOW 5 C5.01 BACKWATER VALVE NOT TO SCALE BACKWATER VALVE SOLVENT WELD BACKWATER VALVE TO DRAIN TILE PROVIDE FLEXIBLE JOINT 6" DRAIN TILE CONNECT DRAIN TILE TO STRUCTURE AT ELEVATION SHOWN ON THE DRAWING. GROUT SECURE TO STRUCTURE WALL. MINIMIZE STUB THROUGH WALL. STUB ONLY AS REQUIRED TO ALLOW BACKWATER VALVE TO BE CONNECTED TO DRAIN TILE. PROVIDE FLEXIBLE JOINT AT CONNECTION REFER TO PLAN FOR STRUCTURE TYPE TURFGRASS FLUSH WITH TOP OF WALK WALK WIDTH AS LABELED ON PLAN 12" MI N . 4 " DE P T H SHT# DET# SHT# DET# SHT# DET# CONCRETE WALK7 C5.01 NOT TO SCALE ASPHALT PAVEMENT CONCRETE CURB AND GUTTER WALK FLUSH WITH TOP OF CURB AND PROVIDE TOOLED EDGE WITH EXPANSION JOINT 4" CONCRETE WALK MIN. 4" SAND BASE OR STABILIZED AGGREGATE BASE THICKENED TO BOTTOM OF CURB WHERE APPLICABLE PREPARED SUBGRADE PROVIDE 2% CROSS SLOPE (MAX.) UPHILL SIDE PROVIDE TOOLED EDGE (WITH EXPANSION JOINT AND CAULK SEALANT AT ALL STOOPS AND BUILDING AREAS) BUILDING WALL TREATMENT AT BUILDING TREATMENT AT DOWNHILL SIDE 1' ' TURFGRASS RECESSED 1" BELOW WALK SURFACE DOWNHILL SIDE NOTE: ATTACH TRACER WIRE WITH BROWN STRIPE TO PIPE AT 3' O.C. WITH PLASTIC ZIP-TIES (OR APPROVED EQUAL). SEWER 15" 11 1 2" 4" 6 C5.01 CLEANOUT ASSEMBLY NOT TO SCALE MCDONALD 74M "A" SERIES CAST IRON METER PIT FRAME AND COVER FITTING HUB WITH 4" THREADED PLUG. APPLY TEFLON THREAD TAPE, OR APPROVED EQUAL, OVER THREADS. FINISH GRADE LEAVE 24" OF EXCESS WIRE AT SURFACE TRACER WIRE 24" DIA. x 8" THICK CONCRETE SLAB POURED AROUND CASTING (FLUSH WITH FINISH GRADE) REFER TO PLAN FOR INVERT ELEVATION 6" DRAIN TILE 2" 8 C5.01 LIGHT DUTY ASPHALT PAVEMENT NOT TO SCALE PAVEMENT LIMIT AS SHOWN ON PLAN 2" ASPHALT WEAR COURSE 6" STABILIZED AGGREGATE BASE 12" MIN. SUBGRADE PREPARATION PROVIDE 2% CROSS SLOPE (MAX., 1.5% MIN.) REFER TO GRADING PLAN FOR DIRECTION NOTES: 1.TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS. 2.UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100% STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILL SHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY. 3.INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321. DE P T H ( V A R I E S ) 6" M I N . 1/ 8 O . D . (6 " M I N . ) O.D. + 2' (MAX) PI P E D I A . 2 C5.01 PIPE BEDDING PVC NOT TO SCALE SUBGRADE PIPE BEDDING DN DN UP UP SETBACK 50'-0" 12'-0" F E D C B A 1 2 3 4 5 6 7 8 A MN NorthCheck: Drawn: Date: Comm: License Number: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Scale: Date 7/ 2 / 2 0 2 4 1 : 3 9 : 1 1 P M Au t o d e s k D o c s : / / 2 3 9 9 9 9 - L C _ C e d a r V a l l e y S e c u r i t y I mp r o v e m e n t s / 2 3 9 9 9 9 _ C V L C B A S E ( R 2 3 ) N E W . r v t 1/4" = 1'-0" Ce n t r a l : \ \ M i n n e s o t a \ S t P a u l \ I S D 1 9 6 \ C e d a r L e a r n i n g \ 1 0 2 20 1 \ A B E _ E C F E _ 1 0 2 2 0 1 . r v t ISD #196 CEDAR VALLEY LEARNING CENTER RENOVATION V1.02 CEDAR VALLEY LC - VARIANCE 14445 DIAMOND PATH WEST ROSEMOUNT, MN 55068 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 NOT FOR CONSTRUCTION CITY SUBMITTAL CHECKER AUTHOR 7/02/2024 242050 MINNESOTA 2/4/2011 R. SCOTT McQUEEN 20155 ARCHITECT Revisions Description Date Num 1/4" = 1'-0"F1 CVLC OVERALL MAIN LEVEL - SETBACK BUILDING DATA: EXISTING BUILDING FOOTPRINT: - 4,705 SF PROPOSED ADDITION FOOTPRINT: - 153 SF NEW OVERALL FOOTPRINT AREA: - 4,858 SF 1-STORY ADDITION: - SECURE ENTRY VESTIBULE 7' - 4 " 2 ' - 6 " 12 ' - 4 " 2'-6" 7'-4" 2'-6" 5'-0" 153 SF VEST. A100 F1 V1.01 F3 V1 . 0 1 F1 V1.01 SIM 2' - 6 " ARCHITRAVE/ FREIZE TO MATCH EXISTING, PAINTED COPPER COPING TO MATCH ADDITION EXISTING ENGINEERED WOOD SIDING, TYP. PAINTED TO MATCH. ALUM. STOREFRONT SYSTEM, TYP. COPPER FASCIA TO MATCH BASEUL 110'-0" BASEML 100'-0" T.O. ADDITION 111'-10" ARCHITRAVE/ FREIZE TO MATCH EXISTING, PAINTED COPPER COPING EXISTING ARCH F E D C B A 1 2 3 4 5 6 7 8 A MN NorthCheck: Drawn: Date: Comm: License Number: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Scale: Date 8/ 1 / 2 0 2 4 1 0 : 1 3 : 0 5 A M Au t o d e s k D o c s : / / 2 3 9 9 9 9 - L C _ C e d a r V a l l e y S e c u r i t y I mp r o v e m e n t s / 2 3 9 9 9 9 _ C V L C B A S E ( R 2 3 ) N E W . r v t As indicated Ce n t r a l : \ \ M i n n e s o t a \ S t P a u l \ I S D 1 9 6 \ C e d a r L e a r n i n g \ 1 0 2 20 1 \ A B E _ E C F E _ 1 0 2 2 0 1 . r v t ISD #196 CEDAR VALLEY LEARNING CENTER RENOVATION V1.01 CEDAR VALLEY LC - VARIANCE 14445 DIAMOND PATH WEST ROSEMOUNT, MN 55068 14420 GLENDA DRIVE APPLE VALLEY, MN 55124 NOT FOR CONSTRUCTION CD SET CHECKER AUTHOR 7/30/2024 242050 MINNESOTA 2/4/2011 R. SCOTT McQUEEN 20155 ARCHITECT 3/8" = 1'-0"F5 MAIN LEVEL FLOOR PLAN 3/8" = 1'-0"F1 CVLC SOUTH ELEVATION 3/8" = 1'-0"F3 CVLC WEST ELEVATION ALL NEW WOOD SIDING AND FASCIA TO MATCH EXISTING. Revisions Description Date Num 3/8" = 1'-0"D1 EXTERIOR ELEVATION @ CEDAR AVENUE CITY OF APPLE VALLEY RESOLUTION NO. 2024 - A RESOLUTION APPROVING A VARIANCE FOR A REDUCED SETBACK FROM CEDAR AVENUE TO CONSTRUCT A VESTIBLE ADDITION AT CEDAR VALLEY LEARNING CENTER LOCATED AT 14420 GLENDA DRIVE AND ATTACHING CONDITIONS THERETO WHEREAS, pursuant to Minnesota Statutes 462.357 the City of Apple Valley has adopted, as Title XV of the City Code of Ordinances, zoning regulations to control land uses throughout the City; and WHEREAS, pursuant to the City’s said regulations, a “variance” is an exception granted by the City Council from the literal provisions of the zoning regulations when a practical difficulty is shown to exist due to unique conditions on the property which do not apply to the area in general; and WHEREAS, Independent School District 196 is the owner of property located at 14420 Glenda Drive, and legally described as Lot 3, Block 1, Bor-Nel, Dakota County, Minnesota (“Property”); and WHEREAS, Independent School District 196 operates an educational facility on the Property, specifically the Cedar Valley Learning Center; and WHEREAS, the Independent School District 196 made application for a variance to reduce the building setback from Cedar Avenue from 50’ to 38’ in order to construct a vestibule addition on the east side of the building, fronting Cedar Avenue; and WHEREAS, the Apple Valley Planning Commission reviewed the variance request at its meeting held on August 7, 2024, and recommended approval of the variance request based on the following findings: 1. The property is zoned LB (“Limited Business”). This zone requires a 50’ building setback from Cedar Avenue. 2. The building is in the southeast corner of the subject property. The southeast corner of the building abuts the 50’ building setback. 3. The building was constructed in 1993 as a realtor office. The building is now owned by ISD196 and is used as an education facility. The current layout of the building was established and is consistent with what was permitted in 1993. 4. The applicant is requesting a variance to reduce the building setback from Cedar Avenue from 50’ to 38’ to construct a vestibule addition to increase security and manage visitors at the facility. 2 5. The existing entrance is located on the north side of the building. The security and visitor management into the building from this north entrance cannot be provided because the entrance provides direct, unrestricted access to the elevator and primary staircase in the building. 6. The existing, secondary east entrance does not provide direct access to the elevator or stairs. A secure vestibule addition at the east entrance would limit access to restricted areas and allow staff to direct visitors. 7. A reduced building setback would not be inconsistent with the Cedar Avenue area. Multiple buildings along the Cedar Avenue corridor have setbacks of less than 50’. 8. No significant trees are planned to be removed from construction of the vestibule. 9. Security and visitor management needs of the learning center cannot be met at the existing north entrance due to the elevator and primary staircase at the entrance which must be allow unrestricted access for staff, students, and authorized visitors. The existing east entrance can provide security and visitor management by constructing a vestibule addition. A secure vestibule addition on the east side of the property cannot be constructed without encroaching into the 50’ building setback from Cedar Avenue because of the proximity of the existing building to the setback. These facts constitute a practical difficulty warranting the setback variance. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Apple Valley, Dakota County, Minnesota, that the variance to reduce the building setback of a vestibule addition from Cedar Avenue from 50’ to 38’ on the property located at 14420 Glenda Drive, and legally described as Lot 3, Block 1, Bor-Nel, Dakota County, Minnesota, is hereby approved, subject to all applicable City Codes and standards, and the following conditions: 1. If the Building Permit is not paid for and issued within one (1) year of the date of approval, the variance approval shall lapse. 2. The approval of the variance is subject to the issuance of and compliance with the building permit and Building Code requirements for the construction of the east vestibule addition. 3. Construction shall occur in conformance with the approved site plan received in City offices July 2, 2024, on file in City offices. 4. Construction shall occur in conformance with the elevation plan received in City offices August 1, 2024, on file in City offices. 3 5. Site grading shall occur in conformance with a Natural Resources Management Plan (NRMP) which shall include a final grading plan to be submitted for review and approval by the City Engineer. 6. No trees shall be removed, except as authorized as part of the NRMP. 7. Construction shall be limited to the hours of 7:00 a.m. to 7:00 p.m. Monday through Friday. Weekend construction shall be limited to 8:00 a.m. to 5:30 p.m. Saturdays. 8. Earthmoving activities shall not occur when wind velocity exceeds thirty (30) miles per hour. Watering to control dust shall occur as needed and whenever directed by the Apple Valley Building Official or Zoning Administrator. 9. Issuance of a Building Permit is contingent upon the project being constructed in conformance with all the preceding conditions, as well as all applicable performance standards of the current zoning regulations. 10. The ongoing use and occupancy of the premises is predicated on the ongoing maintenance of the structure and all required site improvements as listed in the preceding. No alteration, removal, or change to the preceding building plans or required site improvements shall occur without the express authorization of the City. Site improvements which have deteriorated due to age or wear shall be repaired or replaced in a timely fashion BE IT FURTHER RESOLVED that issuance of the building permit is subject to a finding of compliance of the construction plans with the Minnesota State Building Code, as determined by the Apple Valley Building Official, and with the Minnesota State Uniform Fire Code, as determined by the Apple Valley Fire Marshal. ADOPTED this _______ day of _________, 2024. Clint Hooppaw, Mayor ATTEST: Christina M. Scipioni, City Clerk 4 CERTIFICATE I, Christina Scipioni, City Clerk, hereby certify that the above resolution is a true and correct copy of a resolution adopted by the City Council of the City of Apple Valley, Dakota County, Minnesota, on the day of , 2024. Christina M. Scipioni, City Clerk Recommended Findings*1.The property is zoned LB (“Limited Business”). This zone requires a 50’ building setback from Cedar Avenue. 2.The building is in the southeast corner of the subject property. The southeast corner of the building abuts the 50’ building setback. 3.The building was constructed in 1993 as a realtor office. The building is now owned by ISD 196 and is used as an education facility. The current layout of the building was established and is consistent with what was permitted in 1993. 4.The applicant is requesting a variance to reduce the building setback from Cedar Avenue from 50’ to 38’ to construct a vestibule addition to increase security and manage visitors at the facility. 5.The existing entrance is located on the north side of the building. The security and visitor management into the building from this north entrance cannot be provided because the entrance provides direct, unrestricted access to the elevator and primary staircase in the building. 6.The existing, secondary east entrance does not provide direct access to the elevator or stairs. A secure vestibule addition at the east entrance would limit access to restricted areas and allow staff to direct visitors. *Findings have been updated per City Attorney review. Continued Recommended Findings7.A reduced building setback would not be inconsistent with the Cedar Avenue area. Multiple buildings along the Cedar Avenue corridor have setbacks of less than 50’. 8.No significant trees are planned to be removed from construction of the vestibule. 9.Security and visitor management needs of the learning center cannot be met at the existing north entrance due to the elevator and primary staircase at the entrance which allow unrestricted access for staff, students, and authorized visitors. The existing east entrance can provide security and visitor management by constructing a vestibule addition. A secure vestibule addition on the east side of the property cannot be constructed without encroaching into the 50’ building setback from Cedar Avenue because of the proximity of the existing building to the setback. These facts constitute a practical difficulty warranting the setback variance. *Findings have been updated per City Attorney review. I T E M: 6.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:A ugust 7, 2024 S E C T I O N:Other Business Description: Review of Upcoming S chedule and Other Updates S taff Contact: B reanna Vincent, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: N/A S UM M ARY: Next P lanning Commission Meetings: Wednesday, August 21 , 2024 - 7:00 p.m. Public hearing applications due by 9:00 a.m. on Wednesday, J uly 24, 2024. Site plan, variance applications due by 9:00 a.m. on Wednesday, August 7, 2024. Wednesday, September 4, 2024 - 7:00 p.m. Public hearing applications due by 9:00 a.m. on Wednesday, August 7, 2024. Site plan, variance applications due by 9:00 a.m. on Wednesday, August 21, 2024. Next City Council Meetings: T hursday, August 8, 2024 - 7:00 p.m. T hursday, August 22, 2024 - 7:00 p.m. B AC K G RO UND: N/A B UD G E T I M PAC T: N/A