HomeMy WebLinkAbout02/04/2015FEBRUARY 4, 2015
PLANNING COMMISSION TENTATIVE AGENDA
7:00 P.M.
NEXT PLANNING COMMISSION MEETINGS
Wednesday, February 18, 2015
Regular Scheduled Meeting
- Public hearing applications due by 9:00 a.m. on Wednesday, January 21, 2015
- Site plan, variance applications due by 9:00 a.m. on Monday, February 9, 2015
7. OTHER BUSINESS
A. Review of upcoming schedule and other updates.
8. ADJOURNMENT
Meeting Location: Municipal Center
7100 147th Street West
Apple Valley, Minnesota 55124
This agenda is subject to change by deletion or addition to items until approved by the Planning
Commission on the date of the meeting.
1. CALL TO ORDER
2. APPROVAL OF AGENDA
3. APPROVAL OF MINUTES OF JANUARY 21, 2015
4. CONSENT ITEMS
- - NONE --
5. PUBLIC HEARINGS
- - NONE --
6. LAND USE /ACTION ITEMS
A. Apple Valley Bank — Site plan building permit request for construction of a 3,250 -sq. ft. bank
building on .71 -acre lot. (PC15 -04 -B)
LOCATION: 7510 - 147th Street West
PETITIONER: AV Bank Center, LLC
7:00 P.M.
Wednesday, March 4, 2015
Regular Scheduled Meeting
- Public hearing applications due by 9:00 a.m. on Wednesday, February 4, 2015
- Site plan, variance applications due by 9:00 a.m. on Monday, February 23, 2015
NEXT CITY COUNCIL MEETINGS
Thursday, February 12, 2015
Informal
Regular Scheduled Meeting
Thursday, February 26, 2015
Regular Scheduled Meeting
7:00 P.M.
5:30 P.M.
7:00 P.M.
7:00 P.M.
Regular meetings are broadcast live on Charter Communications Cable, Channel 180. Agendas are
also available on the City's Internet Web Site http : / /www.cityofapplevalley.org.
1. CALL TO ORDER
CITY OF APPLE VALLEY
PLANNING COMMISSION MINUTES
JANUARY 21, 2015
The City of Apple Valley Planning Commission meeting was called to order by Chair Melander at
7:00 p.m.
Members Present: Tom Melander, Ken Alwin, Keith Diekmann, Paul Scanlan and David Schindler.
Members Absent: Tim Burke and Brian Wasserman.
Staff Present: City Attorney Sharon Hills, Community Development Director Bruce Nordquist,
City Planner Tom Lovelace, Assistant City Engineer David Bennett, and Department Assistant Joan
Murphy.
2. APPROVAL OF AGENDA
Chair Melander asked if there were any changes to the agenda. Hearing none he called for a
motion.
MOTION: Commissioner Alwin moved, seconded by Commissioner Diekmann, approving the
agenda. Ayes - 5 - Nays - 0.
3. APPROVAL OF MINUTES JANUARY 7, 2015.
Chair Melander asked if there were any changes to the minutes. Hearing none he called for a
motion.
MOTION: Commissioner Diekmann moved, seconded by Commissioner Scanlan, approving
the minutes of the meeting of January 7, 2015. Ayes - 5 - Nays —0.
4. CONSENT ITEMS
NICINTL`
5. PUBLIC HEARINGS
--NONE--
6. LAND USE/ACTION ITEMS
A. Menard's Outdoor Garden Center — Consideration of a site plan authorization to allow
for establishment of temporary outdoor garden center. (PC15-01-B)
LOCATION: 14960 Florence Trail
PETITIONER: Menard, Inc.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
January 21, 2015
Paoe 2 of 3
Planner Tom Lovelace stated the applicant is requesting approval of an outdoor display area to
allow for a 3,240-sq. ft. (36 -ft. x 90 -ft.) temporary garden center in the northwest corner of parking
lot yearly from April 1 to September 1. The display area would be bounded by a temporary 3-ft.
high cedar split-rail/concrete block fence and would include an 800-sq. ft. greenhouse.
The subject property is located in zone 1 of Planned Development No. 646. The purpose of this
planned development zoning district is to provide for an integrated mix of shopping center, retail
business, limited business, general business, and limited industrial uses. Outdoor display, sales or
storage in conjunction with a permitted use is allowed as a permitted accessory use, subject to
review and approval by the City Council.
He commented that the applicant is requesting that the following items be allowed to be displayed
in the area:
• Annuals in packs, pots, hanging baskets, and containers
• Perennials in pots and packs
Trees potted in containers
Shrubs potted in containers
• Bagged soils on palletized displays
Limited selection of plant foods
• Landscape timbers
He stated staff had concerns about allowing landscape timbers to be stored in this area. This
material is bulkier than the other materials, which would likely require vehicles to pull up next to
the garden center to load the timbers. This could create a conflict with other customer traffic to and
from the center. Pick up of this type of material is more appropriate in the existing outdoor yard.
Staff is recommending that this type of material not be allowed in the center area. Establishment of
the garden center would result in the loss of 20 of the existing 458 parking spaces.
The current number of parking spaces exceeds the minimum required parking for a building
material sales store. The facility would still exceed their parking requirements even with the
temporary removal of parking for the garden center.
Rodney Wekkin, Menards, 5101 Menard Drive, Eau Claire, Wisconsin, was available to answer
Ltestions.
Discussion followed.
MOTION: Commissioner Diekmann moved, seconded by Commissioner Alwin recommending
approval of a site plan to allow for the establishment of a seasonal outdoor garden
sales center subject to the following conditions:
The seasonal outdoor garden center shall be conducted in conformance with the
approved site plan, dated December 30, 2014.
The seasonal outdoor garden center in the parking lot shall be allowed to operate
from April 1 to September 1 of each year.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
January 21, 2015
Page 3 of 3
Only live plant materials, bagged soils, and plant food shall be allowed to be
displayed in the outdoor garden sales center area.
• The seasonal sales area in the parking lot shall be delineated by a cedar wood
split-rail fence.
• Construction and maintenance of the greenhouse and garden center area shall be
in accordance to the all applicable City's building and fire codes.
All bulk materials shall be required to be stored on pallets and that the stacking of
pallets shall not be allowed.
All materials shall be kept outside of all parking lot drive lanes located along the
east side of the property.
All areas should be kept in neat, organized rows and the premises shall be kept
free of trash and other debris.
No signage shall be allowed to be affixed to the greenhouse and perimeter fence.
No landscape materials, such as, bagged mulch, landscape timbers or rock shall be
allowed.
Ayes -5 - Nays - O.
7. OTHER BUSINESS
A. Review of upcoming schedule and other updates.
Community Development Director Bruce Nordquist stated that the next Planning Commission
meeting would take place Wednesday, February 4, 2015, at 7:00 p.m.
8. ADJOURNMENT
Hearing no further comments from the Planning Staff or Planning Commission, Chair Melander
asked for a motion to adjourn.
MOTION: Commissioner Alwin moved, seconded by Commissioner Scanlan to adjourn the
meeting at 7:18 p.m. Ayes - 5 - Nays - 0.
Respectfully Submitted,
"i/
Jaa/ ;Murphy, Planning Depaftrnent
sistant
Approved by the Apple Valley Planning Commission on
•••
••••
•••t•
••••
city of Apple
Valeey
6A
ITEM:
PLANNING COMMISSION MEETING
DATE:
SECTION: Land Use /Action Item
February 4, 2015
ITEM DESCRIPTION:
Apple Valley Bank Site P1anBuilding Permit Authorization Request
STAFF CONTACT:
Thomas Lovelace, City Planner
DEPARTMENT /DIVISION:
Community Development Department
Action Requested
If the Planning Commission concurs, staff is recommending site plan/building permit authorization
approval to allow for construction of a 3,250 -sq. ft. commercial building on Lot 1, Block 1, AMOCO
ULTIMATE ADDITION; subject to the following conditions:
• A variance to allow for a reduction in number of drive -thru window stacking spaces from the
required six to five.
• Construction shall be occur in conformance with the site plan, dated January 20, 2015; subject
to addition of a five -foot wide sidewalk along the north side of the building, and pedestrian
connections to the sidewalks located along 147`" Street West and Cedar Avenue.
• Any new curb, sidewalk, and streetscape amenities along 147 Street West shall be occur in
conformance with the existing ring route design.
• A bike rack shall be installed in accordance with City requirements.
• Construction shall occur in conformance with the landscape plan dated January 20, 2015;
subject to submission of a detailed landscape planting price list for verification of the City's
2%% landscaping requirement at the time of building permit application and removal and
replacement of an existing ash tree on the property.
• Construction shall occur in conformance with the elevation plan dated January 15, 2015;
subject to the addition of a prefinished metal canopy treatment along the cast stone veneer
portion of the west and south walls.
• Site grading shall occur in conformance with a final grading plan to be submitted for review
and approval by the City Engineer.
• Construction shall be in accordance with the City's storm water requirements.
• Soil borings and testing shall be provided to ensure that the soil in the infiltration area(s) is
not contaminated.
• Removal of the existing structures, pavement, base and fuel storage tanks and piping shall be
done in accordance with local, state and federal regulations and all the required permits and
inspections shall be performed.
• If feasible, re -use of existing on -site sanitary sewer and water services shall be required.
• Screening of the trash receptacles and mechanical protrusions shall be done in accordance
with City code.
• All applicable City ordinances shall be strictly adhered to.
Summary
The property is the current location of a convenience store with a car wash bay and five motor fuel pump
islands. The applicant is requesting site plan/building permit authorization to allow for the removal the
existing structures, pavement, base and fuel storage tanks and piping for the purpose of constructing a
3,250 -sq. ft. bank with 24 surface parking spaces and three drive -up lanes.
The site plan identifies five vehicle- stacking spaces in the drive -up lanes. City code currently requires a
minimum of six spaces.
The property, located at 7510 147`" Street West, currently has one driveway access of 147 Street West and
two off Glenda Drive. Part of the redevelopment of the site will include the removal of the 147 Street West
access. The applicant will replace the driveway with a new curb and sidewalk, which shall be consistent with
the existing ring route design. This will also require the installation of streetscape amenities consistent with
the current ring route design.
No pedestrian connections are proposed from the site to sidewalks along 147 Street West and Cedar Avenue.
Those connections should be made as part of this redevelopment project.
A bike rack should be installed on -site.
Construction of a trash enclosure and screening of any mechanical systems shall be done in accordance with
City requirements.
The applicant has not indicated if they are going to use the existing sanitary sewer and water services. To
avoid cutting into 147 Street West in order to reach sewer and water lines, every effort should be made to
re -use these services.
The applicant will be required to infiltrate storm water onsite in accordance with City regulations. This may
require soil borings and testing to ensure that the soil in the area of any infiltration feature is not
contaminated.
No on -site fire hydrants are shown on the plans. If hydrants are needed, they shall be placed in locations as
required by the City's Fire Marshal.
The west elevation, adjacent to Glenda Drive is rather stark. A metal canopy, similar to the one along the
east and north elevation should be added to the cast stone veneer portion of the west and south elevation.
APPLICANT:
AV Bank Center, LLC
APPLICATION DATE:
January 16, 2015
60 DAYS:
March 16, 2015
PROJECT NUMBER:
PC15 -04 -B
120 DAYS:
May 15, 2015
Budget Impact
None
Attachment(s)
Location Map
Comp Plan Map
Zoning Map
Development Plans
Elevations
Legal Description:
Lot 1, Block 1, AMOCO ULTIMATE ADDITION
Comprehensive Plan
Designation
"C" (Commercial)
Zoning
Classification
"RB" (Retail Business)
Existing Platting
Platted
Current Land Use
Convenience store with motor fuel sales and car wash
Size:
.71 acres
Topography:
Flat
Existing Vegetation
Landscaping generally associated with a commercial facility
Other Significant
Natural Features
None
Adjacent
Properties/Land
Uses
NORTH
Paul's Cedar Avenue Tire and Auto
Comprehensive Plan
"C" (Commercial)
Zoning/Land Use
"RB" (Retail Business)
Time Square Shopping Center
SOUTH
Comprehensive Plan
"C" (Commercial)
Zoning/Land Use
"RB" (Retail Business)
EAST
Ryan Real Estate Bwlding
Comprehensive Plan
"C" (Commercial)
Zoning/Land Use
"PD -290" (Planned Development)
Apple Valley Car Clinic
WEST
Comprehensive Plan
"C" (Commercial)
Zoning/Land Use
"RB" (Retail Business)
APPLE VALLEY BANK SITE PLAN /BUILDING PERMIT
AUTHORIZATION REQUEST
PROJECT REVIEW
Existing Conditions
Property Location: 7510 147 Street West
Development Project Review
Comprehensive Plan: The commercial designation includes a wide variety of retail, office, and service
uses that vary in intensity and off -site impacts. The City uses the zoning ordinance to regulate the
intensity and characteristics of development based upon land use criteria and performance standards
Retail uses typically encompass the traditional community shopping businesses and occupy much of the
downtown area. This specific commercial land use is intended to accommodate a wide range of
commercial goods and services. Off -site impacts include activity, light, noise and generally higher traffic
generation rates than other commercial uses. Residential developments are not allowed within this land
use category except for those planned in conjunction with a planned development (PD zoning), or within
the upper floors of multi -level buildings as a conditional use to ensure that impacts are mitigated. Retail
land uses will be zoned RB, SC, and PD, which allows uses according to the specific performance
standards:
• High quality site and architectural design and building materials are expected to be used within
this land use category to promote pleasing off-site views of the development;
• Development in the downtown area shall adhere to the Downtown Design Guidelines;
• Landscaping shall be installed to provide aesthetic treatment of buildings and to soften parking lot
areas.
Significant traffic generation during the weekday and weekends is associated with retail development.
Traffic studies may be requested in conjunction with the review of large developments that have the
potential to threaten the integrity of the existing and planned roadway system. Additionally,
developments that lower the level of service on adjacent roadways or intersections may be required to
install traffic improvements to improve the level of service to its pre - development condition if City
approval is granted.
• Driveway access points to the development shall be from non - local streets or those designed for
primarily non - residential traffic. No direct access to County Road #42 and Cedar Avenue shall be
allowed; and
• Lighting is limited to parking lot and building illumination designed for employee safety.
Zoning: The property is zoned "RB" (Retail Business). Retail business districts are areas, which are
centrally located to serve the need for general retail sales. Banks and savings and loan offices are
permitted uses within this zoning district.
Site Plan: The site is the current location of a 2,635 -sq. ft. convenience store /car wash operation, with four
motor fuel pump islands that are covered by a 6,350 -sq. ft canopy structure. The applicant is proposing to
demolish the structures, remove the pump islands and fuel tanks and construct a 3,250 -sq. ft. bank building
with three drive -up lanes. The .71 -acre site is located at the southwest corner of Cedar Avenue and 147
Street West.
The property is bordered by Cedar Avenue to the east, 147 Street West to the north, and Glenda Avenue to
the west and south. There are currently three access drives from public streets to the site. Two are off
Glenda Avenue and one off a 147 Street West. The driveway located along 147 Street West will be
removed with this development project. The applicant will be required to blend the curb, sidewalk, and
install streetscape amenities at this location, consistent with the existing ring route design.
The site plan shows 24 surface parking spaces for the 3,250 -sq. ft bank and three drive -up banking/ATM
lanes. City code requires one parking space for each 250 -sq. ft. of gross floor area and six (6) stacking
spaces for each drive —up window. The 24 spaces shown on the submitted plans is 11 spaces over the
minimum required and the five (5) stacking spaces for the three drive -up lanes, is one less than the
minimum requirement.
Back in 2010, the City considered a request by Think Bank, whose layout accommodated the stacking of
four to five vehicles in their drive -thru lanes. The City's Traffic Engineer reviewed that proposal and
concluded that because of new trends in banking such as internet and phone banking, he does not believe
that the reduced number of stacking spaces would be a traffic problem. The Commission concurred and
recommended the minimum number of stacking spaces be reduced from six to four for the Think Bank
project. The Commission's recommendation was passed on to the City Council who approved the bank
project with the reduced number of drive thru lane spaces. Therefore, a recommendation for a variance to
allow for a reduction in number of drive -thru window stacking spaces from the required six to five would be
in order.
All minimum building setbacks have been met for this project and all minimum parking setbacks have been
met with the exception of the parking setback along the east side of the property. The applicant is proposing
to keep the existing concrete curb along east side of the property, which is located five feet from the
property line A parking setback variance was granted in 1992 as part of a redevelopment project 011 this
property, and the applicant has chosen to continue to utilize the approved variance with their proposal. Staff
has no issue with this request.
Parking lots with fifteen (15) or more parking spaces shall provide for parking of bicycles near the
building entrance and shall not encroach into the pedestrian walkway. The petitioner shall install a bike
rack in accordance with City requirements.
The site plan does not identify the location of a trash enclosure of any mechanical systems for the
building. One could presume that for security reasons, storage of refuse will be handled inside the
building. If not, a trash enclosure will need to be constructed for the outdoor storage of trash receptacles.
That enclosure shall be constructed of the same materials as the bank building.
The code requires that all necessary mechanical protrusions visible to the exterior shall be screened or
handled in a manner such that they are not visually obvious and are compatible with the surrounding
development. For rooftop mechanical equipment, satisfaction of this requirement shall require that the
equipment be fully screened visually by whether a parapet wall along the edge of the building or by a
screen immediately surrounding such equipment. The height of the parapet wall or screen shall be at least
the height of the equipment and must be an extension of the outside walls or screens constructed of
durable, low- maintenance materials and be either a light, neutral color or the same color as the primary
building materials of the outside walls. Rooftop equipment shall be setback from the edge of the roof a
minimum of 20 feet.
For ground mounted equipment, satisfaction of this requirement shall require that the equipment be fully
screened by either a masonry wall or an opaque landscape screen. The height of the wall or landscape
screen shall be at least the height of the equipment. Masonry walls must be constructed of the same
materials and colors of the primary materials of the building's exterior finish. Landscape screening must
be of plant materials that are fully opaque year -round
Grading Plan: Preparation of the site for development for the proposed bank will involve the removal of
the pavement and base, the existing building and structures, and the underground fuel storage tanks and
piping. Removal of the existing structures, pavement, base and fuel storage tanks and piping shall be done
in accordance with local, state and federal regulations and all the required permits and inspections shall be
performed.
The site is relatively flat and a minimal amount of grading will occur in preparing the site for the proposed
bank. Redevelopment of this site will require the project meet the City's storm water requirements. This
will include meeting the infiltration, water control, and rate control standards. There is some concern about
the potential soil contamination associated with the fuel storage and dispensing system. The City Engineer
is requiring that soil/borings and testing be provided to ensure that the soil in the infiltration area(s) is not
contaminated.
Final grading and erosion control plans, and specifications shall be submitted for approval by the City
Engineer prior to issuance of a Natural Resources Management Permit.
Availability of Municipal Utilities: The site is currently served by public utilities that extend from lines
located in the 147` Street right -of -way. Their plans indicate that they will be making new sanitary sewer
and watermain connections from the public line within the street right -of -way to the site. Staff has some
concern with making these new connections, which would require excavation in that street that was repaved
as part of the recent Cedar Avenue reconstruction project. The City Engineer is requesting that they make
every effort to utilize the existing sanitary sewer and watermain services on the site.
No on -site fire hydrants are shown on the plans. If hydrants are needed, they shall be placed in locations as
required by the City's fire code.
Street Classifications /Accesses /Circulation: As stated previously, the site is surrounded by streets on all
four sides. Abutting the property's east side is Cedar Avenue, a principal arterial. There is currently no
direct access to the site from Cedar Avenue and none is proposed.
Directly adjacent to the north of the site is 147 Street West, a minor collector street. There is currently a
driveway access from this street to the subject property. The applicant is proposing to remove this driveway
as part of the redevelopment of the site. Staff supports the removal of this driveway.
The site is bounded on the west and south by Glenda Avenue, a local street. Two driveways currently exist
that provide access to and from the site. The applicant is proposing that those driveways remain at their
current location. It appears that the most northerly access will be the primary access to and from the site and
will serve as the entrance to the drive -thru window lanes. Staff has no issues with the use of the existing
access driveways off Glenda Drive and internal circulation pattern.
Elevation Drawings: The elevation drawings indicate a mix of stucco and cast stone veneer, with
prefinished metal panels that will be used as an accent material for the building and as the primary material
for the drive -thru canopy.
The applicant should add a metal canopy treatment along the cast stone veneer portion of the west and south
walls, similar to the north and east walls.
Pedestrian Access: Public sidewalks exist directly adjacent to the site in the 147"` Street West and Cedar
Avenue rights-of-way. The site plan does not identify any connections from the development to these
sidewalks A pedestrian connection should be made from the end of the sidewalk in front of the building to
the north to the sidewalk along 147 Street West. A second pedestrian connection should be made from the
main entrance east to the sidewalk along Cedar Avenue. Both connections will require the removal of a
minimum of two parking spaces. The project exceeds the minimum require parking by 11 spaces, so the
loss of two spaces will not have an adverse impact on their parking requirements.
Parking is proposed along the north side of the building, but there is no sidewalk between the building and
parking spaces. A five -foot wide sidewalk should be added at this location.
Landscape Plan: The landscape plan shows a variety of live landscape materials that will be used on the
site. The Natural Resources Coordinator has reviewed the plan and has no issues. The applicant is
proposing to save an existing ash tree on the site. With the recent discovery of the ash borer in the area,
staff is recommending that the existing tree be removed and replaced with another species.
Staff is recommending that a sidewalk be installed along the north side of the building, which will likely
require the removal of the proposed foundation plantings. If that occurs, additional plantings will be needed
in other areas of the site.
City code requires that the minimum cost of landscaping materials (live plant material excluding sod) for
industrial projects shall be 2'A% of the estimated building construction cost based on Means construction
data. A detailed planting price list shall be required for verification of the City's 21/2% landscaping
requirement at the time of submission of plans for a building permit.
Signs: The elevation plans show signage on north and east side of the building. No formal sign request has
been submitted. All building signage will need to conform to the requirements set forth in the City's sign
code.
147 -TH ST VV-
-S
i J 41 113
3 !!
APPLE VALLEY
BANK
LOCATION MAP
117 'R5il4�
APPLE VALLEY
BANK
149T1
COMPREHENSIVE
PLAN DESIGNATION
"C" (Commercial)
1 Kb �i� � W 1 45th
3 , . k c
Pr *
Lea' q 0
Y
R -3, >
1 111 -5C w` UPPER Q
4 Q i 146th F
,._ cc ST W W
'� P D 4 w
1
ce
47th ST W. RB L
Q 0
o q �
, co SITE 147th ST W
Q > _ - _. PD -290 2
O 1 3
RB re
w \ GLAZIER All
U A \ % F MIRTH
APPLE VALLEY
BANK
ZONING MAP
"RB" (Retail Business)
APPValley
3inW 3ANO uIsa3NNn U N Mt :
011 `2131N30 NNW! AV
map
it!
CY
OZcC U 31AV0'3AI210 LLISti3NNI1 A1HON 092
711 `2131N33 NNVS AV
9200 NHI .;31IVA31dd0 MU FLLCxotst
NNW! A311VATWA rKK
r
U
ite
sczi
I LIP I
WOCE ll 3NVO'3NNO lll$NANNI1 HJNON 09L2
311 ` 2131N33 )INVS AV
62455 N W '/311 VA 3lddNM I S HJL0I OI SL
)INVB A3IIVA 3lddV
1€02S v 31AVO 3AIUCI AL[83AN?HLHON owz
311 'N31N30 )INV8 AV
oz LSSNW rIVA31d 'MLS H1Let 01.5<
)INVB A311VA 31ddV
I U
9ZOS 13'31AMI.'M 410 AUSH1NNf15
011 `831■30 )INVB AV
lddV .15 HJ PL Ut9<
)INV9 AJ11YA 31ddtl
go
0
VCQ lj JIAVG 9 MQ:A ISd AMf HIYON OWZ
311 4 2131Na0 NNVE1 AV
PtI SS Nw'A3iWVA 3ld6Y'H11S X1Ut otSL
)LNVB A311VA 3lddV
0
L()
U
io£E l3 OTAVO anima ALStl3NW1 HiNON 042
all'2131N33 >iNV9 AV
MOOS NW'A31IVA3lddv MIS 1{12E
)INVS A3l1VA 3lddY
LCD
0)
w
011 'MAINE° )AMYB. AV
TNA 31ddb M
NNW] ) 3l1VA 3lddtl
tej 1.0
= U
C6 ld'3IiWO 3A1130 : uls a?NNn HIY ON 09
011 E31N30 NNV8 AV
NNVB A31lVA 3lddY
r
3.Ak 3Nac knsH3AMNn HIHaN Os
011 ` aniNg0 >INVa AV
MSS Nw'A] 1VA 3lddV'M LS HLLSl 01
)INV8 A311VA 31ddd
K 14 3V1VO. 3NLOAll5113AINf HILON 092
011 `831N3o NNVa AV
'A311VA 15 HLN4
NNW' A3TIVA 3lddV
n U!
b20Cc Z1 3IAVO 3Ntl0 A16tl3NN0 HLHON 092
Olt `1:131N3oNNva AV
9ZL9S N W'A3DVA 318dV'M 1S 141/34 OLSt
NN`da A311VA 31ddtl
CC
0
zaec ld Nw'3AMa ,w8113AINn HJNON 09a
311. `213 -N30 NNV9 AV
DOG
NNVB A311VA 3lddV
SNOIIVA i39 SNtlld
APPLE VALLEY BANK
APPLE VALLEY PLANNING COMMISSION
PRESENTATION
FEBRUARY 4, 2015
APPLE VALLEY BANK
REQUEST
A 3,250–sq. ft. bank with three drive-thru lanes
on a .71-acre site located 7510 147Street West.
th
LOCATION MAP
GLENDA DR
GLAZIER AVE
CEDAR AVE S
147TH ST W
SITE
149TH ST W
COMP PLAN DESIGNATION
C
GLAZIER AVE
INS
C
UPPER 145TH ST W
146TH WAY W
CEDAR AVE S
C
GLENDA DR
LD
GARRETT AVE
C
C
MD
UPPER 146TH ST W
146TH ST W
SITE
C
HD
C
147TH ST W
C
C
GRANADA AVE
C
149TH ST W
CC
GLAZIER AVE
C
“C” (Commercial)
AERIAL VIEW
CTGLEASON PATH
ZONING MAP
RB
145th
LB
GLAZIER AVE
DR
146th WAY
P
GB
UPPER
LB
146th ST W
R-3
GARRETT AVE
146th
UPPER
M-5C
ST W
DR
GLAZIER AVE
4 146th
GB
ST W
PD-290
RB
147th ST W
1
RB
GRANADA
GARRETT AVE
147th ST W
SITE
CEDAR AVE S
PD-290
3
149th
1
2
RB
ST W
GLAZIER
AVE
“RB” (Retail Business)
FINAL PLAT
SITE
EXISTING CONDITIONS MAP
CANOPY
AND
FUEL PUMPS
STORE
AND
CAR WASH
SITE PLAN
CLOSE
DRIVEWAY
ADD SIDEWALKS
ADD BIKE RACK
GRADING PLAN
UTILITY PLAN
LANDSCAPE PLAN
REMOVE
ASH TREE
ELEVATIONS
APPLE VALLEY BANK
RECOMMENDATION
The Planning Commission recommend site plan/building
permit authorization approval to allow for construction of a
3,250-sq. ft. commercial building on Lot 1, Block 1, AMOCO
ULTIMATE ADDITION; subject to the following conditions:
A variance to allow for a reduction in number of drive-thru
•
window stacking spaces from the required six to five.
Construction shall occur in conformance with the site plan,
•
dated January 20, 2015; subject to addition of a five-foot
wide sidewalk along the north side of the building and
pedestrian connections to the sidewalks located along 147
th
Street West and Cedar Avenue.
APPLE VALLEY BANK
CONDITIONS OF APPROVAL
Any new curb, sidewalk, and streetscape amenities along
•
147Street West shall occur in conformance with the
th
existing ring route design.
A bike rack shall be installed in accordance with City
•
requirements.
Construction shall occur in conformance with the landscape
•
plan dated January 20, 2015; subject to submission of a
detailed landscape planting price list for verification of the
City’s 2½% landscaping requirement at the time of building
permit application and removal and replacement of an
existing ash tree on the property
APPLE VALLEY BANK
CONDITIONS OF APPROVAL
Construction shall occur in conformance with the elevation
•
plan dated January 15, 2015; subject to the addition of a
prefinished metal canopy treatment along the cast stone
veneer portion of the west and south walls.
Site grading shall occur in conformance with a final grading
•
plan to be submitted for review and approval by the City
Engineer.
Construction shall be in accordance with the City’s storm
•
water requirements.
Soil borings and testing shall be provided to ensure that the
•
soil in the infiltration area(s) is not contaminated.
APPLE VALLEY BANK
CONDITIONS OF APPROVAL
Removal of the existing structures, pavement, base and fuel
•
storage tanks and piping shall be done in accordance with
local, state and federal regulations and all the required
permits and inspections shall be performed.
If feasible, re-use of existing on-site sanitary sewer and
•
water services shall be required.
Screening of the trash receptacles and mechanical
•
protrusions shall be done in accordance with City code.
Installation of an onsite fire hydrant.
•
All applicable City ordinances shall be strictly adhered to.
•