Loading...
HomeMy WebLinkAbout08/19/2015 Meeting Location: Municipal Center City of 7100 147th Street West Apple Valley, Minnesota 55124 AUGUST 19, 2015 PLANNING COMMISSION TENTATIVE AGENDA 7:00 P.M. This agenda is subject to change by deletion or addition to items until approved by the Planning Commission on the date of the meeting. 1. CALL TO ORDER 2. APPROVAL OF AGENDA 3. APPROVAL OF MINUTES OF AUGUST 5, 2015 4. CONSENT ITEMS A. Set public hearing for September 16, 2015, 7:00 p.m. to consider amendments to the “PD” (Planned Development) zoning district. PETITIONER: City of Apple Valley B. Set public hearing for September 16, 2015, 7:00 p.m. to consider zoning ordinance amendments pertaining to alcoholic beverage production establishments. PETITIONER: City of Apple Valley 5. PUBLIC HEARINGS --NONE-- 6. LAND USE/ACTION ITEMS A. Karamella Addition – Consider zoning amendment to allow for ancillary retail in conjunction with a permitted use in the “I-1”, “I-2”, and “BP” zoning districts, subdivision by preliminary plat of a 21.58-acre site to create one (1) lot and one (1) outlot, and site plan/building permit authorization for an approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. (PC15-26-ZSB) ancillary retail facility. LOCATION: Northwest of Johnny Cake Ridge Road and 147th Street W. PETITIONER: HBP Property Holdings, LLC, and Karamella, LLC 7. OTHER BUSINESS A. Continue Discussion of the Mixed Business Campus Comprehensive Plan Designation. B. Review of upcoming schedule and other updates. 8. ADJOURNMENT NEXT PLANNING COMMISSION MEETINGS Wednesday, September 2, 2015 Regular Scheduled Meeting 7:00 P.M. -Public hearing applications due by 9:00 a.m. on Wednesday, August 5, 2015 -Site plan, variance applications due by 9:00 a.m. on Monday, August 24, 2015 Wednesday, September 16, 2015 Regular Scheduled Meeting 7:00 P.M. -Public hearing applications due by 9:00 a.m. on Wednesday, August 19, 2015 -Site plan, variance applications due by 9:00 a.m. on Monday, September 8, 2015 NEXT CITY COUNCIL MEETINGS Thursday, August 27, 2015 Regular Scheduled Meeting 7:00 P.M. Thursday, September 10, 2015 Informal 5:30 P.M. Regular Scheduled Meeting 7:00 P.M. Regular meetings are broadcast live on Charter Communications Cable, Channel 180. Agendas are also available on the City's Internet Web Site http://www.cityofapplevalley.org. 1. CALL TO ORDER The City of Apple Valley Planning Commission meeting was called to order by Chair Melander at 7:00 p.m. Members Present: Tom Melander, Ken Alwin, Tim Burke, Angela Polozun and Paul Scanlan. Members Absent: Keith Diekmann and David Schindler. Staff Present: City Attorney Sharon Hills, Community Development Director Bruce Nordquist, Planner Margaret Dykes, Assistant City Engineer Brandon Anderson and Department Assistant Joan Murphy. 2. APPROVAL OF AGENDA Chair Melander asked if there were any changes to the agenda. Hearing none he called for a motion. MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan, approving the agenda. Ayes - 5 - Nays - 0. 3. APPROVAL OF MINUTES JULY 15, 2015 Chair Melander asked if there were any changes to the minutes. Hearing none he called for a motion. MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan, approving the minutes of the meeting of July 15, 2015. Ayes - 5 - Nays — 0. 4. CONSENT ITEMS CITY OF APPLE VALLEY PLANNING COMMISSION MINUTES AUGUST 5, 2015 A. Village at Founders Circle 2nd Addition — Consider rezoning two parcels totaling 4.78 acres from "PD-739, Zones 1 and 2" to "PD-739, Zone 1", and preliminary plat to create one (1) platted lot. (PC15-24-ZSG) LOCATION: Generally southeast of Garrett Avenue and 153rd Street W. PETITIONER: Dakota County CDA MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan, recommending approval of the draft amendment rezoning the subject 4.78-acre site from "PD-739, Zones 1 and 2" to "PD-739, Zone 1". Ayes - 5 - Nays — 0. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 5, 2015 Page 2 of 5 MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan, recommending approval of the preliminary plat for Founders Circle 2nd Addition, subject to compliance with all applicable City Codes and standards. Ayes - 5 - Nays — 0. B. Leach Detached Garage Variance — Consider previously approved variance to increase size of detached garage from 750 sq. ft. to 957 sq. ft. (PC15-26-V) LOCATION: 8460 133rd Street Ct. W. PETITIONER: Thomas C. Leach MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan, recommending approval of a variance to construct a 957 sq. ft. detached garage, subject to compliance with all City Codes, the conditions previously stated in Resolution No. 2013-13, and the following: The exterior of the garage shall be constructed of materials that are compatible with the exterior of the home. Ayes - 5 - Nays — 0. 5. PUBLIC HEARINGS A. Karamella Addition — Public hearing to consider zoning amendment to allow for ancillary retail in conjunction with a permitted use in the "I-1", "1-2", and "BP" zoning districts, subdivision by preliminary plat of a 21.58-acre site to create one (1) lot and one (1) outlot, and site plan/building permit authorization for an approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. ancillary retail facility. (PC15-26-ZSB) LOCATION: Northwest of Johnny Cake Ridge Road and 147th Street W. PETITIONER: HBP Property Holdings, LLC, and Karamella, LLC Chair Melander opened the public hearing at 7:02 p.m. Planner Margaret Dykes stated the property, located northwest of Johnny Cake Ridge Road and 147th Street W., is zoned "I-2" (General Industrial). It does not allow for ancillary retail sales. The applicant is requesting an amendment to the zoning code to allow for ancillary retail sales in conjunction with the manufacturing facility. The City Attorney has drafted zoning code amendments that would allow ancillary retail sales as a permitted accessory use in conjunction with a permitted use provided the retail does not exceed 10% of the total floor area or 5,000 sq. ft., whichever is smaller. This would allow a tenant to have a retail operation to sell products manufactured or warehoused on the site. In staffs opinion, allowing a small amount of retail in conjunction with a manufacturing or retail facility does not detract from the overall industrial use of the property. The applicant is requesting a subdivision by preliminary plat of the subject 21.58-acre site into one lot and one outlot. Lot 1 would be 9.84 acres (428,630 sq. ft.), and Outlot A is shown as 9.47 acres. The remaining property is dedicated for right-of-way for 147th Street and Johnny Cake Ridge Road. An additional 26 wide drainage/utility/trail easement is needed along Johnny Cake Ridge Road to accommodate the installation of an 8'-wide bike trail, and right-turn lanes to access the site as well as 147th Street. An approximately 1.4-acre stormwater infiltration area on Outlot A that CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 5, 2015 Page 3 of 5 accommodates drainage from Lot 1. This area should be incorporated into Lot 1 and a drainage /utility easement placed over it. The site plan shows an approximately 69,500 sq. ft. manufacturing /warehouse facility, and attached 4,200 sq. ft. ancillary retail facility. The total building area is about 73,700 sq. ft. This is approximately 17% of the lot area. The plan shows a layout for a future expansion, which would increase the building area by approximately 85,280 sq. ft., bringing the maximum building area to 15 8,93 9 sq. ft. The building coverage with a future expansion would be about 37%; this complies with the Code, which allows a maximum building coverage of 45% (192,884 sq. ft.). The building is approximately 27 feet tall, which is below the maximum 40 foot height allowed by the Code. A roof parapet or a screen immediately surrounding the unit must screen all rooftop mechanicals. The screening material must be at least the same height as the mechanical unit. The proposed building requires 139 parking spaces; the plan shows 190 spaces. Also shown on the plan are spaces for tour bus parking that could accommodate large school buses. With the future building addition, the site would require an estimated 266 spaces, depending on the final use of the space. Staff is satisfied the parking plan meets the Code requirements. The site is accessed by one drive intersecting with Johnny Cake Ridge Road, which is a collector road. The Assistant City Engineer has stated that, due to the traffic volume on Johnny Cake, this must be a right - in/right -out only access point. Right -turn lanes would be required at the access point, and the City would construct a right -turn lane onto 147th Street. There are two driveways accessing 147th Street W. (also a collector), which will provide full access. Right turn lanes will also be required on 147th Street. The Assistant City Engineer has reviewed the grading plan and has several issues that must be addressed by the applicant. The plan shows one pedestrian connection from public sidewalk on 147th Street W. to the site. The applicant should install additional sidewalk connections due to the retail component to the site. Staff believes there are locations for additional pedestrian connections from 147th Street. She stated the building materials consist of pre -cast concrete panel and the applicant wishes to use the Double Tee precast building shown on the elevations. Commissioner Scanlan inquired if bike racks would be installed because of the retail involved. Ms. Dykes answered that bike racks would be installed. Commissioner Scanlan asked what materials would be involved for the trash enclosures. Ms. Dykes said it would be similar materials to the building but she would rather the applicant answer to that. Commissioner Scanlan inquired if signage would be installed to distinguish between the retail and employee parking. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 5, 2015 Page 4 of 5 Ms. Dykes answered that could be looked at. Commissioner Scanlan asked about design elements to the building and a lighting plan so it does not affect the neighborhoods to the east. Mike Whalen, Developer /General Contractor for EFH Co., commented that the trash enclosure would be of the same building material as the exterior and would be in the northwest area of the building. He described panel construction. Steve Hegedus, Karamella, LLC, provided additional information. Commissioner Alwin asked for clarification that the retail store was really secondary to the manufacturing aspect. Ms. Dykes answered yes. Mike Erdmann, 5936 — 144th Street W., expressed concern for the intersection and believes the right - in/right -out issue had been addressed. He would like to see some type of concrete to prevent the left turns where not allowed. He was hoping to see the bike path along Johnny Cake Ridge Road extended and would like more landscaping to shield some of the parking from Johnny Cake Ridge Road. He inquired how the lighting would affect the neighbors to the east. He commented that this is a fantastic facility. It is a nice addition to Apple Valley and he is in support of it. Ms. Dykes reported that staff is in discussions of creating a concrete island at that right - in/right -out on Johnny Cake Ridge Road. Chair Melander closed the public hearing at 7:26 p.m. 6. LAND USE /ACTION ITEMS -- NONE -- 7. OTHER BUSINESS A. Review of upcoming schedule and other updates. Community Development Director Bruce Nordquist stated that the next Planning Commission meeting would take place Wednesday, August 19, 2015, at 7:00 p.m. 8. ADJOURNMENT Hearing no further comments from the Planning Staff or Planning Commission, Chair Melander asked for a motion to adjourn. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 5, 2015 Page 5 of 5 MOTION: Commissioner Alwin moved, seconded by Commissioner Scanlan to adjourn the meeting at 7:29 p.m. Ayes - 5 - Nays - 0. Respectfully Submitted, t Assistant Approved by the Apple Valley P anning Commission on PROJECT NAME: Amendments to "PD" (Planned Development) Zoning Designation PROJECT DESCRIPTION Consideration of ordinance amending the "PD" (Planned Development) zoning designation to reduce the required minimum project area from 20 acres to 5 acres; a project area of less than 5 acres may be considered if certain conditions are met. STAFF CONTACT: Kathy Bodmer, Planner DEPARTMENT/DIVISION: Community Development Department APPLICANT: City of Apple Valley PROJECT NUMBER: PC15-29-Z City of Apple, Val ey Budget Impact N/A Attachment(s) 1„ Draft resolution setting public hearing 2. Draft notice of public hearing ITEM: PLANNING COMMISSION MEETING DATE: SECTION: 3. Draft ordinance amendment 4. Excerpt other cities' PD requirements 4A August 19, 2015 Consent Proposed Action Adopt resolution setting a public hearing to consider amendments to "PD" (Planned Development) zoning designation reducing the minimum project area from 20 acres to 5 acres. Project Summary/Issues The "PD" (Planned Development) zoning designation allows flexibility in terms of typical zoning standards including setbacks, densities and lot areas. PD zoning districts must comply with the Comprehensive Plan designation, but can otherwise be crafted to allow a project to be developed to more creatively and efficiently use the land. A PD zoning district has specific dimensional and design standards which are stated in the PD ordinance and the PD designation is labeled on the zoning map. Currently, the code requires a minimum project area of a minimum of 20 acres in order to rezone a property to PD. With the City nearing full build-out, redevelopment of property will become more of an issue and fewer sites of 20 acres or larger will be available. A PD designation may be helpful to provide flexibility with setbacks without diluting the requirements of the standard zoning district designations. Another potential use for PD zoning would be for senior housing developments where increased densities, reduced parking requirements and senior-oriented amenities are usually considered. The proposed ordinance amendment would allow projects with an area of a minimum of 5 acres to be eligible to request a rezoning to PD. The ordinance would further allow a project with an area of less than 5 acres to request the PD designation, provided the City finds that a PD development will create a project of superior design and best meets the goals and policies of the comprehensive plan. At the same time, a PD designation will not be available for single family residential lots to avoid a variance procedure. CITY OF APPLE VALLEY RESOLUTION NO. 2015 - A RESOLUTION SETTING A PUBLIC HEARING FOR AMENDMENTS TO CHAPTER 155 OF THE CITY CODE OF THE CITY OF APPLE VALLEY WHEREAS, the City of Apple Valley has adopted a Zoning Ordinance dividing the City into a series of zones providing for a variety of permitted land uses and performance standards in order to protect the public health safety, and general welfare; and WHEREAS, the terms of such regulations provide for certain permitted, accessory and conditional uses; and WHEREAS, the City of Apple Valley finds that current conditions warrant the consideration of amendments to Chapter 155 of the City Code of Ordinances; and WHEREAS, Section 155.400 of the City Code of Ordinances provides for such procedure to effect a rezoning or amendment to the Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the City of Apple Valley, Dakota County, Minnesota, that a public hearing before the Apple Valley Planning Commission be set for September 16, 2015, at 7:00 p.m., or as soon thereafter as possible, to consider an amendment to § 155.266 Planned Development Zoning District concerning criteria for approval of a preliminary development plan and rezoning to planned development district. ADOPTED this 19th day of August, 2015. h: \word \pc_proj \apps \pd ordinance amendment 5 acres \resolution pc set hrg.docx Thomas Melander, Chair NOTICE OF PUBLIC HEARING PROPOSED AMENDMENTS TO THE ZONING ORDINANCE IN THE CITY OF APPLE VALLEY, DAKOTA COUNTY, MINNESOTA NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Apple Valley, Dakota County, Minnesota, will meet at the Municipal Center, 7100 - 147th Street W., on Wednesday, September 16, 2015, at 7:00 p.m., or as soon thereafter as possible. The purpose of the meeting is to hold a public hearing on proposed amendments to § 155.266 of the City Code of Ordinances. The proposed amendment is to reduce the minimum lot size required to rezone a property to "PD" (Planned Development) from 20 acres to 5 acres or smaller under certain conditions. A single family lot incapable of further subdivision would not be eligible for a PD designation. NOTICE IS FURTHER GIVEN that these proceedings are instituted by action of the Apple Valley Planning Commission. All interested parties will be given an opportunity to be heard at said time and place. DATED this th day of , 20 Pamela J. Gackstetter, City Clerk CITY OF APPLE VALLEY ORDINANCE NO. 2015- AN ORDINANCE OF THE CITY OF APPLE VALLEY, AMENDING CHAPTER 155 OF THE CITY CODE RELATED TO MINIMUM LOT SIZE FOR PLANNED DEVELOPMENT ZONING DESIGNATION The City Council of Apple Valley Ordains: Section 1. Section 155.266 of the City Code shall be amended to read as follows: § 155.266 CRITERIA. The criteria necessary for approval of the preliminary development plan as well as the rezoning shall be as follows: (A) The proposed development is in conformance with the comprehensive guide plan of the city and encompasses an area of not less than 0 5 acres. An area of less t han 5 aces may be approved only i f the applicant can demonstrate that a project of superior design can be achieved or that uye: ter _ mp i c h c� n rel .ensi . e i n pas i d licks can be attained Oirovgh tt of th -e ..'1: ess. (B) The proposed development plan is designed in a manner so as to form a desirable and unified environment within its own boundaries. (C) The planned development will not create an excessive burden on parks, schools, streets and other public facilities and utilities which serve or are proposed to serve the planned development. D This cha . tei shall not be applied to single-family residential lots incapable of further i412 subcfivision due t o lot size or as a means to -oi other proced res r e p rppriately -- ek iewe .s a variailre under 55.379 ATTEST: Section 2. Effective Date. This ordinance shall take effect upon its adoption and publication according to law. PASSED by the City Council this th day of Mary Hamann- Roland, Mayor Pamela J. Gackstetter, City Clerk Sample excerpts PUD zoning ordinances: Wood bury: The project area is at least ten acres in size unless the applicant can show that a PUD of less acreage meets the standards and purposes of the comprehensive plan and preserves the health. safety and welfare of the citizens of the city and that all of the following conditions exist: a. The proposal better adapts itself to the physical and aesthetic setting of the site and with the surrounding land uses than could be developed using strict standards and land uses allowed within the underlying zoning district. b. The proposal would benefit the area surrounding the project to greater degree than development allowed within the underlying zoning district(s). c. The proposal would provide mixed land use and/or site design flexibilities while enhancing site or building aesthetics to achieve an overall, workable higher quality of development than would otherwise occur in the underlying zoning district. d. If applicable, the proposal would increase open or green space or ensure the concentration of open space into more workable or usable areas and would preserve the natural resources of the site than would otherwise occur in the underlying zoning district. Eagan: Minimum cereal:or planned development. The minimum total area required for a planned development shall be five acres of contiguous land. Tracts of less than five acres may qualify only if the applicant can show that the minimum lot area requirement should be waived because a planned development is in the public interest and that one or both of the following conditions exist: a. Unusual physical features of the property itself or of the surrounding neighborhood are such that development under the standard zoning would not be appropriate in order to conserve a physical or terrain feature of importance to the neighborhood or community. b. The property is adjacent to or across the street from property that has been developed under the provisions of this section and will contribute to the amenities of the neighborhood. St. Louis Park: (4) Projects available for PUD treatment shall have a site which consists of a parcel or contiguous parcels of land two acres or more in size. Tracts of less than two acres may be approved only if the applicant can demonstrate that a project of superior design can be achieved or that greater compliance with comprehensive plan goals and policies can be attained through use of the PUD process. PROJECT NAME: Zoning Ordinance Amendments — Alcoholic Beverage Production Establishments PROJECT DESCRIPTION: Amend the Zoning Code to allow for Alcoholic Beverage Production Establishments including Breweries, Microdistilleries, and Alcohol Sales for Brewer Taprooms, Cocktail Rooms, and Sunday Off - Sales. STAFF CONTACT: Margaret Dykes, Planner DEPARTMENT /DIVISION: Community Development Department APPLICANT: City of Apple Valley PROJECT NUMBER: PC 15 -27 -Z city of Apple VaIiey ITEM: PLANNING COMMISSION MEETING DATE: SECTION: 4B August 19, 2015 Consent Action Requested Adopt the draft resolution setting a public hearing for September 16, 2015, to consider amending Chapter 155 (Zoning) to allow for Alcoholic Beverage Production Establishments. Project Summary /Issues Due to recent changes in Minnesota state law, the City Clerk's office has begun updates to the City Code to allow liquor licenses for alcoholic beverage production establishments, such as brewer taprooms, cocktail rooms, microdistilleries, and small breweries. The City Code currently allows breweries in the "I -2" (General Industrial) district. To expand these uses to be consistent with State law and surrounding cities, the Zoning Code will need to be amended to allow for the above - listed uses in both the "I-1" (Limited Industrial), and "I -2" districts. These uses, due to their industrial nature, would not be permitted outside of these zoning districts. The City Attorney's office is working on an ordinance amendment to address these uses. This is expected to be fairly straightforward ordinance amendment since other cities have addressed many of the common concerns raised by the introduction of such establishments in a community. It should be noted that brewpubs, which have small brewing facilities in addition to a Class I restaurant, are simply considered Class I restaurants and can locate in any districts where Class I restaurants are allowed. These districts include the "LB" (Limited Business — as a conditional use); the "NCC" (Neighborhood Convenience Center — as a permitted use); the "RB" (Retail Business — as a permitted use); the "I-1" (as a permitted use); the "I -2" (as a permitted use); and various Planned Development districts. Budget Impact N /A. Attachment(s) 1. Draft Resolution Setting Hearing CITY OF APPLE VALLEY PLANNING COMMISSION RESOLUTION NO. 2015 - A RESOLUTION SETTING A PUBLIC HEARING FOR AMENDING THE ZONING REGULATIONS RELATING TO ALCOHOLIC BEVERAGE PRODUCTION ESTABLISHMENTS IN THE CITY OF APPLE VALLEY WHEREAS, the City of Apple Valley has adopted a Zoning Ordinance dividing the City into a series of zones providing for a variety of permitted land uses and performance standards in order to protect the public health safety, and general welfare; and WHEREAS, due to changes in Minnesota statutes, the Apple Valley Planning Commission finds that current conditions warrant the consideration of an amendment to the Zoning Ordinance relating to alcoholic beverage production establishments to regulate breweries, microdistilleries and alcohol sales for brewer taprooms, cocktail rooms, and Sunday off -sale, and establishing criteria therefore; and WHEREAS, Section 155.400 of the City Code of Ordinances provides for such procedure to effect a rezoning or amendment to the Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Apple Valley, Dakota County, Minnesota, that a public hearing before the Apple Valley Planning Commission be set for September 16, 2015, at 7:00 p.m. to consider an amendment to the Apple Valley Zoning Regulations concerning alcoholic beverage production establishments. ATTEST: ADOPTED this 19 day of August, 2015. Joan Murphy, Department Assistant Thomas O. Melander, Chair PROJECT NAME: Karamella Addition PROJECT DESCRIPTION: • Zoning Amendment to allow for ancillary retail in conjunction with a permitted use in the "I-1", "1 -2 ", and "BP" zoning districts. • Subdivision by preliminary plat of 21.58 -acre parcel to create one (1) lot and one (1) outlot. • Site Plan/Building Permit Authorization for an approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. ancillary retail facility. STAFF CONTACT: Margaret Dykes, Planner DEPARTMENT /DIVISION: Community Development Department APPLICANT: HBP Property Holdings, LLC, and Karamella, LLC PROJECT NUMBER: PC 15- 26 -ZSB APPLICATION DATE July 8, 2015 60 DAYS: September 5, 2015 120 DAYS: November 4, 2015 city of Apple Valley ITEM: PLANNING COMMISSION MEETING DATE: SECTION: 6A August 19, 2015 Land Use Action Requested 1. Recommend approval of the draft ordinance amendment to allow for ancillary retail in conjunction with a permitted use in the "I -1" (Limited Industrial), "I -2" (General Industrial), and "BP" (Business Park) zoning districts. 2. Recommend approval of the preliminary plat of Karamella Addition, a subdivision a 21.58 -acre parcel to create one (1) lot and one (1) outlot as shown on the plans received in City offices on August 12, 2015, subject to all applicable City codes and standards, and the following conditions: a. All necessary drainage and utility easements shall be dedicated on the plat for any existing and future public utility infrastructure. b. The property owner shall dedicate a 26' -wide trail/drainage/utility easement along the east side of the property to accommodate future bike trail improvements. c. The property owner shall provide for park dedication for the manufacturing building, which shall be in cash -in -lieu of land and paid prior to the release of the final plat for ding. d. No building permit shall be issued until the final plat of Karamella Addition is filed with Dakota County Recorder's Office, a Development Agreement is executed by the developer and City and all the conditions of the executed Development Agreement have been met by the applicant. 3. Recommend approval of Site Plan/Building Permit Authorization for an approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. ancillary retail facility, as shown on the plans received in City offices on August 12, 2015, subject to all applicable City codes and standards, and the following conditions: a. There shall be no operation of the ancillary retail until the adoption and publication of the amendment to Chapter 155 (Zoning) allowing for ancillary retail in conjunction with a permitted use. b. The subject building shall be located on Lot 1, Block 1, Karamella Addition. c. There shall be a minimum of 196 parking spaces constructed in the first phase of the development. Any future phases shall require additional parking to meet the needs of the development per City code. d. No building permit shall be issued until a Natural Resources Management Permit has been obtained. e. Submission of a nursery bid list that confirms the landscape materials and irrigation system meet or exceed 1 percent of the value of the construction of the building based on Means Construction Data. J• f. The property owner shall install bike racks at the retail store. g. Additional pedestrian connections from 147 Street shall be made to the retail store. h. The trash enclosure shall be constructed of the same materials as the primary building. i. A lighting plan shall be submitted to ensure compliance with the City's photometric requirements of 1.0 footcandles at the property line, and all lighting shall be arranged and shielded so as to deflect light away from any adjoining residential uses or public roads. The property owner shall address the comments raised by the Assistant City Engineer in his memo dated August 14, 2015. k. The property owner shall address the comments raised by the Fire Marshal in his memo dated July 21, 2015. Project Summary /Issues Zoning Amendment: The property, located northwest of Johnny Cake Ridge Road and 147 Street w., is zoned "I -2" (General Industrial). It does not allow for ancillary retail sales. The applicant is requesting an amendment to the zoning code to allow for ancillary retail sales in conjunction with the manufacturing facility. The City Attorney has drafted zoning code amendments that would allow ancillary retail sales as a permitted accessory use in conjunction with a permitted use provided the retail does not exceed 15% of the total floor area or 5,000 sq. ft., whichever is smaller. This will allow a tenant to have a retail operation to sell products manufactured or warehoused on the site. In staff s opinion, allowing a small amount of retail in conjunction with a manufacturing or retail facility does not detract from the overall industrial use of the property. Subdivision: The applicant is requesting a subdivision by preliminary plat of the subject 21.58 -acre site into one lot and one outlot. The revised preliminary plat shows Lot 1 will be 11.11 acres, and Outlot A is shown as 8.21 acres. A 26' wide drainage /utility easement is now shown on the plat along Johnny Cake Ridge Road; however, it should be modified so that it allows for the installation of a bike trail in this area. An 8'-wide bike trail must be constructed on the applicant's property within the easement. The bike trail will be installed at the time of road improvements for Johnny Cake. A stormwater infiltration area has been incorporated into Lot 1 and a drainage /utility easement has been placed over it. All necessary drainage and utility easements are shown on the preliminary plat, though some may need to be modified. H: \DEVELOPM\2015 Projects\Karamella \081915 PC report.docx 2 Site Plan: The site plan shows an approximately 69,500 sq. ft. manufacturing/warehouse facility, and attached 4,200 sq. ft. ancillary retail facility. The total building area is about 73,700 sq. ft. The plan shows a layout for a future expansion, which would increase the building area by approximately 85,280 sq. ft., bringing the maximum building area to 158,939 sq. ft. A roof parapet or a screen immediately surrounding the unit must screen all rooftop mechanicals. The screening material must be at least the same height as the mechanical unit. The trash and recycling enclosure is located at the north end of the loading docks; the applicant states it will be screened by precast panes and metal gates that will be integrated into the building design. They have submitted photos of the trash enclosure of their current location and state the new one will be similar in design. This is consistent with City Code. A lighting plan will be required to ensure that no light trespass in excess of 1.0 footcandles will occur. All lighting fixtures must be downcast, shielded, and arranged to deflect light away from any adjoining residential zone or public streets. The plan shows one pedestrian connection from public sidewalk on 147 Street W. to the site. Because of the retail component to the site, the applicant should install additional sidewalk connections. The revised site plan shows a right - in/right -out access to Johnny Cake, due to the traffic volume. An island in this drive will prevent illegal left turns into the site at this location. Future improvements to Johnny Cake, including a signal, will be monitored by the City and made when it is determined the improvements are needed. There are two driveways accessing 147 Street W. (also a collector), which will provide full access. Driveway widths meet City requirements. Right -turn lanes are shown 147 Street, as required. The Assistant City Engineer has reviewed the revised grading plan and has no major outstanding issues, with the exception that a drainage /utility easement must be placed over that portion of Outlot A where the grading for the infiltration area on Lot 1 is located. The revised plan shows a mix of deciduous and evergreen trees, and now meets the Code requirement at least 1.5% of the cost of building materials. The Natural Resources Coordinator has some minor comments regarding the placement of some trees, but no major issues. The building materials consist of a Double Tee pre -cast concrete panel, with a mix of smooth and rough - faced aggregate. The applicant states they will work with City staff to continue to refine the retail design. Public Hearing: The public hearing was held August 5, 2015. The comments are addressed in the body of this report. Budget Impact N/A Attachment(s) 1. Location Map 2. Comprehensive Plan Map 3. Zoning Map 4. Draft Zoning Amendment 5. Revised Preliminary Plat 6. Revised Site Plan 7. Revised Grading and Drainage Plan 8. Revised Storm Sewer Plan 9. Revised Utility Plan 10. Revised Landscape Plan 11. Preliminary Floor Plan 12. Elevations H:\DEVELOPM\2015 Projects \Karamella \081915 PC report.docx 3 13. Photo Sample of Exterior 14. Photo Samples of Trash Enclosure 15. Traffic Impact Study Analysis 16. Traffic Impact Study 17. Revised City Engineer Memo 18. Fire Marshal Memo Property Location: Northwest of Johnny Cake Ridge Road and 147 Street W. Legal Description: A parcel of land located in the East Half of the Southwest Quarter of Section 26, Township 115, Range 20, Dakota County, Minnesota, more particularly described as follows: Commencing at the South quarter corner of said Section 26; then North 00 degrees 05 minutes 31 seconds East along the East line of said East '/2 of the Southwest % a distance of 1957.76 fee to the point of beginning; thence South 89 degrees 51 minutes 01 seconds West a distance of 655.87 feet; thence 583.57 feet along the arc of a tangential curve concave southerly having a radius of 2045.00 feet, central angle of 16 degrees 21 minutes 01 seconds; thence South 73 degrees 30 minutes 00 seconds West a distance of 101.63 feet to the west line of the said East 1/2 of the Southwest '/ ; thence North 00 degrees 02 minutes 52 seconds West along said west line of the East %2 of the Southwest 1/4 a distance of 799.83 feet to the North line of said East '/2 of the Southwest 1/4; thence North 89 degrees 53 minutes 15 seconds East along the said north line of East 1/2 of the Southwest % a distance of 1330.55 feet to the east line of said East ' /2 of the Southwest 1/4; thence South 00 degrees 05 minutes 31 seconds West along said East line of the East 1/2 of the Southwest '/ a distance of 687.66 feet to the point of beginning there terminating. Comprehensive Plan Designation "IND" (Industrial) Zoning Classification "I -2" (General Industrial) Existing Platting Unplatted. Current Land Use Vacant. Size: 21.58 acres Topography: Generally flat. Existing Ve • etation Crops. Other Significant Natural Features None identified Adjacent Properties/Land Uses NORTH Johnny Cake Ridge Park West Comprehensive Plan "P" (Park) and "INS" (Institutional) Zoning /Land Use "P" (Institutional) SOUTH Former Hanson Site Comprehensive Plan "IND" (Industrial) Zoning/Land Use "I -2" (General Industrial) EAST Vacant property (Patina Addition) and Uponor Comprehensive Plan "IND" (Industrial) Zoning /Land Use "1 -1" (Limited Industrial) WEST Apple Valley Business Campus Comprehensive Plan "IND" (Industrial) Zoning/Land Use "I -2" (General Industrial) Existing Conditions Comprehensive Plan: The site is guided "IND" (Industrial) in the City's Comprehensive Guide Plan, and the proposal is consistent with the Comprehensive Plan. No change to the Comprehensive Plan designation is requested. Zoning: The property is zoned "I -2" (General Industrial), which allows for manufacturing, office, warehouse, and similar more intensive industrial uses. It does not allow for ancillary retail sales. The applicant is requesting an amendment to the zoning code to allow for ancillary retail sales in conjunction with the manufacturing facility. City staff has reviewed other cities' ordinances, and there are several that allow ancillary retail in industrial zones, generally with conditional use permits though some allow as permitted uses or permitted accessory uses. The City Attorney has drafted amendments to the zoning code that would allow ancillary retail sales as a permitted accessory use in conjunction with a permitted use provided the retail does not exceed 15% of the total floor area or 5,000 sq. ft., whichever is smaller. This H: \DEVELOPM\2015 Projects \Kararnella \081915 PC report.docx KARAMELLA ADDITION PROJECT REVIEW 4 will allow a tenant to have a retail operation to sell products manufactured or warehoused on the site. The total area of the subject building is 73, 700 sq. ft.; the retail is approximately 4,200 sq. ft. or 6% of the total building area. In City staffs opinion, allowing a small amount of retail in conjunction with a manufacturing or retail facility responds to the needs of existing and future businesses. Many warehousing and manufacturing businesses will have some small amount of sales for older product they want to sell, or to entice customers for larger sales. This is customary and does not detract from the overall industrial use of the property. To ensure there is sufficient parking, an ancillary retail space should be required to conform to the parking standards now in place for other retail uses. Subdivision: The applicant is requesting a subdivision by preliminary plat of the subject 21.58-acre site into one lot and one outlot. The revised preliminary plat shows Lot 1 will be 11.11 acres (483,758 sq. ft.), and Outlot A is shown as 8.21 acres (357,458). The remaining property is dedicated for right -of -way for 147 Street and Johnny Cake Ridge Road. A 26' wide drainage /utility easement is now shown on the plat along Johnny Cake Ridge Road; however, it should be modified so that it allows for the installation of a bike trail in this area. A stormwater infiltration area has been incorporated into Lot 1 and a drainage /utility easement has been placed over it. All necessary drainage and utility easements are shown on the preliminary plat, though some may need to be modified. There is a private pipeline easement in the southeast comer of Lot 1. Though this is a private easement, the applicant should be aware that the owner of the pipeline, Magellan, generally does not allow encroachments into the easement. Recreation Issues: The development requires park dedication. The proposed building will be required to provide cash -in- lieu -of -land as part of the building permit authorization. The park dedication fee will be collected with the building permit. Any future expansion of the building for additional manufacturing /warehousing /retail will require additional park dedication to accommodate future employees. The City's Comprehensive Plan calls out the west side of Johnny Cake Ridge Road as a location to install missing bike trail. An 8' -wide bike trail must be constructed on the applicant's property within the easement. The bike trail will be installed at the time of road improvements for Johnny Cake, which is anticipated to occur within the next 5 years. Site Plan: The revised site plan shows an approximately 69,500 sq. ft. manufacturing /warehouse facility, and attached 4,200 sq. ft. ancillary retail facility located on the southeast area of the site. The total building area is about 73,700 sq. ft. This is approximately 17% of the lot area. The plan shows a layout for a future expansion, which would increase the building area by approximately 85,280 sq. ft., bringing the maximum building area to 158,939 sq. ft. The building coverage with a future expansion would be about 37 %; this complies with the Code, which allows a maximum building coverage of 45% (192,884 sq. ft.). The building is approximately 27 feet tall, which is below the maximum 40 foot height allowed by the Code. The loading docks are located on the northwest side of the building and conform to City standards. The trash and recycling enclosure is located at the north end of the loading docks; the applicant states it will be screened by precast panes and metal gates that will be integrated into the building design. They have submitted photos of the trash enclosure of their current location and state the new one will be similar in design. The plan does not indicate where building mechanicals will be located, though the applicant has stated these will be located on the roof. All rooftop mechanicals must be screened by a roof parapet or a screen immediately surrounding the unit. The screening material must be at least the same height as the mechanical unit. A lighting plan will be required to ensure that no light trespass in excess of 1.0 footcandles will occur. The applicant has stated a lighting plan will be submitted as part of the final submission packet for review. All lighting fixtures must be downcast, shielded, and arranged to deflect light away from any adjoining residential zone or public streets. H:ADEVELOPM\2015 Projects \Karamella \081915 PC report.docx 5 Parking: The proposed building requires 139 parking spaces; the plan shows 196 spaces. Also shown on the plan are spaces for tour bus parking that could accommodate large school buses and leave a 24' wide drive aisle. With the future building addition, the site will require an estimated 266 spaces, depending on the final use of the space. The plan shows 48 future parking spaces, bringing the total spaces shown to 244. The plan indicates 24 additional parking spaces will be placed in the tour bus parking area, and the parking for tour buses will be shifted farther to the north. Staff is satisfied the parking plan meets the Code requirements. The employee and customer parking lots are separated by a landscape island. On -site directional signage would assist with directing traffic. The applicant has stated they will review the installation of the signs. Street Classifications /Accesses /Circulation: The site is accessed by one drive intersecting with Johnny Cake Ridge Road, which is a collector road. The revised site plan shows a right - in/right -out access to Johnny Cake, due to the traffic volume. An island in this drive will prevent illegal left turns into the site at this location. Future improvements to Johnny Cake, including a signal, will be monitored by the City and made when it is determined the improvements are needed. There are two driveways accessing 147 Street W. (also a collector), which will provide full access. Driveway widths meet City requirements. Right -turn lanes are shown 147 Street, as required. Pedestrian Access: The plan shows one pedestrian connection from public sidewalk on 147 Street W. to the site. Because of the retail component to the site, the applicant should install additional sidewalk connections. Staff believes there are locations for additional pedestrian connections from 147 Street. There are sidewalks surrounding the building connecting to the parking areas. Signs: Signs and /or sign structures are not included as part of the building permit authorization. A separate sign permit must be approved before any ground or building signage may be installed. The code allows one (1) ground sign for the site. The ground sign must be located at least 13 feet from the property line. Grading Plan: The Assistant City Engineer has reviewed the revised grading plan and has no major outstanding issues, with the exception that a drainage /utility easement must be placed over that portion of Outlot A where the grading for the infiltration area on Lot 1 is located. Availability of Municipal Utilities: Municipal utilities are available to the site. There are not major outstanding issues with the revised utility plan. Landscape Plan: The revised plan shows a mix of deciduous and evergreen trees. The plan now meets the Code requirement at least 1.5% of the cost of building materials based on Means Construction Data. The Natural Resources Coordinator has reviewed the plan and states that trees should not be planted on the western slopes of the drainage /ponding area in order to keep this area open for future maintenance. She also suggests the use of ornamental grasses mixed in with day lilies throughout the site. Elevation Drawings: The building materials consist of a Double Tee pre -cast concrete panel, with a mix of smooth and rough -faced aggregate. The applicant states they will work with City staff to continue to refine the retail design. Public Safety Issues: The Fire Marshal has reviewed the plans, and has some minor comments that the applicant must address. Public Hearing Comments: The public hearing was held August 5, 2015. Below is a synopsis of the comments received followed by staff responses. H: \DEVELOPM\2015 Projects\Kararnella \081915 PC report.docx 6 • A comment was raised regarding the installation of bike racks. Staff response - The applicant has stated bike racks will be installed, and staff has included this as a condition of approval. • A comment was raised regarding the materials used for the trash enclosure. Staff response The trash enclosure will be constructed of the same material as the building. The applicant has submitted photos of the trash enclosure of their current location and state the new one will be similar in design. • A comment was raised regarding the lighting plan for the site. Staff response — The applicant is working on a lighting plan, but it was not completed at the time the staff report was sent to the Planning Commission. The lighting plan must comply with City Code to ensure that no light trespass in excess of 1.0 footcandles will occur. All lighting fixtures must be downcast, shielded, and arranged to deflect light away from any adjoining residential zone or public streets. H: \DEVELOPM\2015 Projects \Karamella \081915 PC report.docx 7 g g P 01111111 1 � FD 342 & rill" WA IM in I E Rid KM Mil LI IR 0 lir 1 iiii, • / SITE e -2 I -' 0 1-1 HSTW E..) it H T 1-2 W �C Q V z i CITY OF APPLE VALLEY ORDINANCE NO. AN ORDINANCE OF THE CITY OF APPLE VALLEY, MINNESOTA, AMENDING CHAPTER 155 OF THE CITY CODE ENTITLED "ZONING" BY AMENDING SECTIONS TO ALLOW ANCILLARY RETAIL SALES IN INDUSTRIAL AND BUSINESS PARK ZONES The City Council of Apple Valley ordains: Section 1. Section 155.204 of the Apple Valley City Code is hereby amended by adding Section 155.204 (F) to read as follows: § 155.204 PERMITTED ACCESSORY USES. * (F) Retail sales of any service or any product, goods or material produced at or related to the principle use on site, subject to the following: 1. The retail sales are subordinate to the principle use. 2. The gross floor area used for the retail sales is not more than 15 percent of the total gross floor area or 5,000 square feet, whichever is less, of the principle building if a single user /occupant or of the principle user's occupied space if within a multiple -user structure. 3. The retail sales are owned and operated solely by the principle user /occupant of the subject site. 4. The parking requirements for both the principle use and the retail use as set forth in this Code are met on the subject site. Section 2. Section 155.219 of the Apple Valley City Code is hereby amended by adding Section 155.219 to read as follows: § 155.219 PERMITTED ACCESSORY USES. Within any I -2 district, the following accessory uses, or uses deemed similar by the City Council., are permitted: a Accessory uses permitted in the I -1 districts shall also be permitted in the I -2 districts. (B) Retail sales of any service or any product, goods or material produced at or related to the principle use on site, subject to the following: 1. The retail sales are subordinate to the principle use. 2. The gross floor area used for the retail sales is not more than 15 percent of the total gross floor area or 5,000 square feet, whichever is less, of the principle building if a single user /occupant or of the principle user's occupied space if within a multiple -user structure. 3. The retail sales are owned and operated solely by the principle user /occupant of the subject site. DRAFT 4. The parking requirements for both the principle use and the retail use as set forth in this Code are met on the subject site. Section 3. Section 155.233 of the Apple Valley City Code is hereby amended by revising Section 155.233 to read as follows: § 155.233 PERMITTED ACCESSORY USES. fA) Within any BP district, the uses or uses deemed similar by the City Council as listed in § 155.093 shall be permitted accessory uses. (B) Retail sales of any service or any product, goods or material produced at or related to the principle use on site, subject to the following: 1. The retail sales are subordinate to the principle use. 2. The gross floor area used for the retail sales is not more than 15 percent of the total gross floor area or 5,000 square feet, whichever is less, of the principle building if a single user /occupant or of the principle user's occupied space if within a multiple -user structure. 3. The retail sales are owned and operated solely by the principle user /occupant of the subject site. 4. The parking requirements for both the principle use and the retail use as set forth in this Code are met on the subject site. ATTEST: Section 4. Effective Date. This ordinance shall take effect upon its passage and publication. PASSED this day of , 2015. Pamela J. Gackstetter, City Clerk Date Ordinance Adopted: Date Ordinance Published in Legal Newspaper: Date of Public Hearing: Mary Hamann - Roland, Mayor 2 DRAFT ���, INKCAL R s � 4 zg 5g g Nil s Eigni 5.8 0.5w 0 <4 MAW 1g W4,111 tAgq � g g € 1 � � d 11 ® ®® ® ® ® ® ® ®® 5 3W 1 g g it: P gg 1 00000 00 000 ilg g g ; a b b tl i t F 00000000000 a r ueld a ;!S NW '6apep aiddy 011 'eIaweieN p PP 1 n L31 3{ RS si ea V a ° z W E11€ W 6 a $..q a a 9 a1x+Iw� Pg...`J ■ .°D1-1d3 W 0000 8SM wo H U — )2 — .Hazs oane.os- 'Utl 39O d 3N VO .NNNOP 11 77 0 1 .1 1 9 IN ; g I5 q 1P4:qg d gi "Ei Etl..„4 i filKii. 2t.imximmitx I 1 1.1 , 2 0 : f Rewrggir4es 2 k FEI g OF, L. 4 1 1 11 It li 1: 1 1 1 ;1 .1§1 v ii i- !Am 11 WI ! ,NN 1-0 $1 1111 ilgig -gi lilg Ili ;i1 s s gi I t 1 IV 1 14, al iti 4 gn 11 ig 1110 ta4 ' al s au N Ng L9 gR. 51 Pg II! ;911114 Ig ;If i rg.lska 2 2 f: 4s In '1 ,411g1 ! T Fil-gI 1111 N IN1- le! WI 4 ! lid ;4 P pi! ilE id a Yetai ueld a6euiei Bugnio NAvAsimAelddv 011 tilaweJeN °°Hd3 • •1111111111131•=1111111MM 1. 11iM r ”i4 Itlbrin "."' XYCa lY d'Ji11Z•!R b+ - -� ueld Jamas wiolg NW 'AaIleA giddy 07l 'ellewere) as aoaia AWawr wxuuo POKKADj ° • MOIR 0,1.3 "'' 9 SM .. ......« . - Wa F. ue!d 'i!!!3f1 NW 'AapeA add 011 'epawelei l�u 7:7., 'J v . °� H d3 • mil VIM/MOW • 0 W 0 J II g 3 r e r S il '4 Ili di OS t ill gE 9 1511 11 51 111 d lig '14 14 °cg 1.25 g.gp E g lbh Pi; 011 pkg <yo. Ail dig ., d . . d 'CM 30O18 3NYJ .NNNO! e31VM d14.0 gi — 8g 1 L E Ili ggih 44 014= 44 IN "g . 4l 1 k 1 ilia say : gi g f B i �y gg S ®! fi E gg 8 X tSig' 9 y Q 0" q11L4 61 MN tr, '111 Motinpan•Wia NAgiastomgemagamer 4D eg.eAtorMaieNta ~ 1 ' 41. t .10 O r 4D P aV 0 0 3 l;r i a5 $ J W S i:$ e If 2 ¢n.!r 399 t 91 !Ii; =i1; WI 3 =€ +_8 3 3 ueid adeospue1 NW ' alddy 311 'epawejem 'Oa 3001831Y3 ANNHOf b13C J ■ '°'H33 1- L snss tl1OSDNNI$ A311VA 31ddt' OVOH 3OOta 3NV3 ANNHOr B 1S3M 133.5 Hilt) 011 b113 t 1 -"< „, 1 I i Y -t' -• --- -- - -- ---- - t - - - --- - - 1 - -- - - -- I I I i I I I I I I 0 N 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 I I 1 I I 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I W V i I 1 ° a1 ( 7 wl ■ I 1 tfSS V1OS3NNI W'.L31MA 3lddJ avo 300121 371%7 ANNNOt 41S3v∎ 1331LS 91919 011 V l3YNtlVN 9 t o 111 1 c? i J a Z 0 5 W � f ` 2 4 .s in zilummul e foomiliNtioarar - 1I it aim 'I 1 iipI11111111111[ z41 millommiam aismomene sw90 nr NMI as --- iilis NOVO 'H simmomm Glammimm IIII ailir�foL i i•1W IOMMOHHI .ir.�.. 1111111M n MMEMir wy - w, w LU w m j h .• . B®LTON & MINK, IN Date: August 12, 2015 To: City of Apple Valley, MN Front: Bryan T. Nemeth, P.E., PTOE Michael Boex, P.E. Subject: Traffic Impact Study Review Karamella LLC Development Consulting Engineers & Surveyors 12224 Nicollet Avenue • Burnsville, MN 55337 Phone (952) 890 -0509 • Fax (952) 890 -8065 www.bolton- menk.com MEMORANDUM I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Forecasts Introduction Bryan T. N,meth, P.E., PTOE 43354 August 12, 2015 Reg. No. Date The Traffic Impact Study (TIS) for the Karamella Development dated August 7, 2015 and an updated site access plan was reviewed to determine if and how the development impacts the traveling public. Overall, the TIS appears to be accurate and shows few transportation concerns on an operational basis. There are some geometric and connection items of concern that will impact the public transportation system. Forecasts are provided for both 2016 and 2025 with and without the site. The TIS forecasts appear to be accurate based on the trip generation manual rates and anticipated background traffic increase in the community. The total number of trips into and out of the site appears to be accurate for a facility of the proposed size. While trips associated with the retail portion may be higher and the light industrial lower during the peak hours, the overall trips appear to be accurate and are assigned to the access driveways as anticipated. Operations The adjacent intersections are anticipated to be able to handle the additional influx of projected traffic from the development as indicated in the study provided. Based on the 2015 traffic counts, the intersection of Johnny Cake Ridge Road (JCRR) and 147 Street does meet justification for a signal H:\APVA\N15103965 \General Projects120151Karamella LLC Development \2015- 08- 12_Karamella TIS Review.docx DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer Roadway Segment Existing AADT AADT Increase from Trans. Hub Proposed AADT % Change in AADT Daily Roadway Capacity* Max Volume to Capacity Ratio JCRR (N of 147 7,900 140 8,040 1.8% 18,000 to 22,000 0.45 JCRR (S of 147th) 6.500 250 6,750 3.8% 18,000 to 22,000 0.38 Upper 147" (E of JCRR) 3,000 150 3,150 5.0'4 15,000 to 18,000 0.21 147' (W of JCRR) 4,700 130 4.830 2.8% 15,000 to 18,000 0.32 Page 2 but can operate effectively under all -way stop control. Future 2015 operational analysis with a signal or roundabout would provide different results, but would not be anticipated to affect the results indicating that the development traffic does not negatively impact the adjacent intersection operations. Public Roadway System Impacts It is anticipated that the development traffic would be effectively dispersed throughout the public roadway system as defined in the study. The traffic increase from the development (670 trips per day) to other roadways and intersections is anticipated to be minimal compared to the overall background traffic increase based on the following. *Daily Roadway Capac'ty Range based on the Highway Capacity Manual procedures for the lanes, area type, surrounding land uses and access, and type of roadway Generally, a volume to capacity (V /C) ratio should be less than 1.00 with a goal of less than 0.85 to allow for increases during special events and other special conditions. All of the intersections studied have V/C ratios less than 0.85 and the change in traffic volume is less than or equal to 5% for the surrounding public roadway system. Operations analysis at the intersections included in the study is appropriate. 147" Street Access The westbound stopping sight distance from the intersection of Johnny Cake Ridge Road (JCRR) is 250 feet. The intersection sight distance for a right turn maneuver out of the site access is 335 feet and for a left turn maneuver is 390 feet. The eastern 147 Street access for the site is 320 feet west of JCRR while the exit out from the centerline of JCRR is at 380 feet. This access is considered to be an acceptable location meeting the stopping sight distance and approximately meeting the intersection sight distance. The distance between the eastern and western 147t Street access is 370 feet. With the stopping sight distance and intersection sight distance, the western access location is considered to be acceptable. The western access should be aligned and coordinated with any possible access or roadway on the south side of the roadway. The length of the right turn lane should be long enough to provide for a vehicle to decelerate 10 mph or Less in the through lane. According to the "Design of Turn Lane Guidelines" by MnDOT dated July H:IAPVAIN 151039651General Projects 120151Karamella LLC Development 12015- 08- 12_Karamella TIS Review.docx DESIGNING FOR A BETTER TOMORROW Bohon & Menk is an equal opportunity employer. Page 3 2010, the minimum deceleration distance, with no deceleration in the through lane, should be 180 feet at 35 mph. The taper should be at least 5:1 with a 60 foot length under a constrained roadway condition. The west access meet these requirements but the east access does not. The east access right turn lane length should be extended if possible. Outlot A, west of Karamela, should have a driveway connection to share the proposed west Karamella access to 147 Street. The proposed location does not have acceptable intersection sight distance to the west access so considerations for potential access restrictions may be needed. Allowing access between the sites to a shared access would limit conflict points and provide for all movements if access restrictions are even completed. A right turn lane conforming to the same requirements as the other accesses is also recommended. Johnny Cake Ridge Road Access The access onto JCRR, is proposed as a right -in /right -out access 600 feet north of 147th Street. The functional area for the southbound movement to 147t is calculated to be 670 feet. The spacing between the stop bar at 147"' Street and the beginning of the southbound right turn lane for the access is 700 feet. Additionally, the southbound stopping sight distance from 144th Street is 360 feet. Consequently, a full access would not be acceptable. The proposed right - in/right -out access is considered to be acceptable. While there is an island to orientate exiting vehicles to southbound JCRR, this feature may not prevent all motorists from turning north. A median may need to be constructed in the future along the access to prevent illegal maneuvers. This median should be constructed if there are safety issues. The length of the right turn lane should be long enough to provide for a vehicle to decelerate 10 mph or less in the through lane. According to the "Design of Turn Lane Guidelines" by MnDOT dated July 2010, the deceleration length should be 180 feet at 45 mph with a 10 mph deceleration in the through lane. The deceleration in the through lane is considered to be appropriate with the multiple through lanes. The taper should be at least 5:1 with a 60 foot length under a constrained roadway condition. The right turn lane into the access meets the appropriate design distances. Internal Site Circulation Review of the internal site circulation was conducted to determine if the circulation patterns would have any effect on the public roadway system. The location of the parking and loading /unloading areas in relation to the access driveways is not anticipated to result in negative impacts to the adjacent street system. Access to Outlot A should be provided from the west access to 147 Street. This connection should be north of the currently proposed internal t- intersection to minimize the conflicts near 147t Street. As such, the internal access to the parking lot on the west side of the site should also be moved further north to provide additional stacking distance to 147th Street. Conclusions and Recommendations The development impacts are identified in the study. The proposed site access configurations may need to be adjusted based on safety guidance. The primary review conclusions and recommendations are provided below. • The trip increase from the development is not anticipated to negatively affect the surrounding roadway system. H:IAPVAIN 1 5 1 039 651General Projects120151Karamella LLC Development 12015- 08- 12_Karamella TIS Review.docx DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer. ave • The proposed access configurations and locations as discussed in this memo are deemed to be appropriate. • The proposed right turn lanes into the east site access on 147t Street should be lengthened to 120 feet if possible. • The west access on 147th Street should be aligned with a future roadway or driveway to serve the development area to the south. • Outlot A should have an access connection to the west Karamella site access with appropriate agreements in place. This connection should be placed as far north as possible from the currently proposed internal t- intersection and the current t- intersection connection to the parking lot should be placed further north across from it. • The access drive along 147 Street to Outlot A should include a 120 foot westbound right turn lane with a 60 foot taper. • A median may need to be constructed in the future along JCRR north of 147' Street if illegal maneuvers from the proposed access right -in /right -out occur or there are safety concerns. Based on the recent traffic data included in the study, the intersection of Johnny Cake Ridge Road at 147t Street meets the justification for a signal or roundabout. Given current operations are acceptable based on service levels, it is recommended the operation of the intersection be monitored until such a time that a change in intersection control is appropriate. Under signal control, northbound and southbound left turn lanes should be constructed. This change is not a consequence of the development traffic increase. Ii: \APVA1N15103965\General Projects12015 \KaramellaLLC Developmen12015- 08- 12_KaramellaTIS Review.docx DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equol opportunity employer. Karamella Addition Traffic Impact Study Apple Valley, Dakota County, MN August 7, 2015 Prepared by WSB tf : issocialc's, /nr WSB and Associates 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 763 - 541 -4800 WSB Project 02972 -030 TABLE OF CONTENTS Introduction 1 Existing Transportation System 5 Analysis Process 5 Transportation Scenarios 6 Summary 19 TABLE OF FIGURES Figure 1. Study Area and Proposed Development Location 3 Figure 2. Study Intersections 4 Figure 3. Intersection Level of Service Thresholds 6 Figure 4. Existing A.M. Peak Hour Turning Movement Counts 7 Figure 5. Existing P.M. Peak Hour Turning Movement Counts 7 Figure 6. Existing Average Daily Traffic Volumes 8 Figure 7. Development Trip Distribution Percentages 11 Figure 8. Phase 1 Development Generated A.M. Peak Hour Turning Movement Volumes 12 Figure 9. Phase 1 Development Generated P.M. Peak Hour Turning Movement Volumes 12 Figure 10. 2016 Build Condition A.M. Peak Hour Turning Movement Volumes 13 Figure 11. 2016 Build Condition P.M. Peak Hour Turning Movement Volumes 13 Figure 12. Full Build Development Generated A.M. Peak Hour Turning Movement Volumes 15 Figure 13. Full Build Development Generated P.M. Peak Hour Turning Movement Volumes 15 Figure 14. 2025 Build Condition A.M. Peak Hour Turning Movement Volumes 16 Figure 15. 2025 Build Condition P.M. Peak Hour Turning Movement Volumes 16 Figure 16. 2016 Build and 2025 Build Average Daily Traffic Volumes 17 TABLE OF TABLES Table 1. Existing A.M. and P.M. Peak Hour Measures of Effectiveness 9 Table 2. Phase 1 Trip Generation for the Proposed Karamella Addition 10 Table 3. 2016 Build Scenario A.M. and P.M. Peak Hour Measures of Effectiveness 14 Table 4. Full Build -Out Trip Generation for the Proposed Karamella Addition 14 Table 5. 2025 Build Scenario A.M. and P.M. Peak Hour Measures of Effectiveness 18 INTRODUCTION The purpose of this report is to summarize the expected traffic impacts of the proposed Karamella Addition in Apple Valley, Dakota County, Minnesota. The site of the proposed development, which is presently undeveloped, is bordered on the south by 147 Street W and on the east by Johnny Cake Ridge Road. To the north of the site are several recreational uses (aquatic center, ball fields, Eastview High School facilities) and to the west is the Apple Valley Business Campus. See Figure 1 for the study area. The proposed development will be comprised of a candy manufacturing facility with office space, warehousing and a retail component. The goal of this traffic analysis is to determine the impact of the proposed development on the local roadway network, and specifically, the following intersections in the vicinity of the proposed development (shown in Figure 2): 1. 147 Street W and the West Development Access 2. 147 Street W and the East Development Access 3. 147 Street W and Johnny Cake Ridge Road 4. The North Development Access and Johnny Cake Ridge Road Proposed Development Characteristics The proposed development (shown in Figures 1 and 2), is planned to be built in two phases. The first phase includes 74,500 sf of manufacturing space and a 3,500 retail area. The manufacturing space includes approximately 3,000 sf of office space as well as warehousing and shipping operations. The second phase will include an expansion to the manufacturing area totaling 86,500, which includes a similar amount of office and warehousing space. The first phase of the proposed development will be built in 2016, with the expansion occurring by 2025. For the purpose of this study traffic operations were evaluated for existing conditions and for the years 2016 and 2025. Summary of Findings • The proposed development is expected to be built in two phases. o The initial phase is expected to generate 669 daily trips. • This includes 80 trips during the a.m. peak hour and 96 trips during the peak hour. o The full build -out is expected to generate 1,290 daily trips. • This includes 170 trips during the a.m. peak hour and 191 trips during the peak hour. Page 1 • Based on requirements by the City of Apple Valley, the three accesses for the proposed development will be constructed with exclusive right turn lanes for 147 Street W and Johnny Cake Ridge Road. The access on Johnny Cake Ridge Road will be built with a pork chop island as a right -in /right out only. • The intersection of 147 Street W and Johnny Cake Ridge Road operates in an acceptable manner under peak hour existing conditions, with minimal delay and a maximum v/c ratio of 0.47. K U29I -a :n IraOic Karamdla I rallic Study Rcpon.doca Page 2 • Under 2016 Build conditions the analysis results show the 147 Street W and Johnny Cake Ridge Road intersection continues to operate in an acceptable manner. Expected delays are minimal, and the maximum peak hour v/c ratio is 0.49. The access intersections also operate acceptably during both peak hours, with minimal delay and low v/c ratios. • Under the 2025 Build conditions the analysis results show the 147 Street W and Johnny Cake Ridge Road intersection continues to operate in an acceptable manner. Expected delays increase, but are well below the LOS D threshold, and the maximum peak hour v/c ratio is 0.58. The three proposed development access intersections are expected to continue to operate acceptably during both peak hours, with minimal delays for the stop controlled approach and low v/c ratios. K 02912.0301 relk Traffic Sludv Report dat Johnny Cake Ridge Road 41 At 11/21 ESInfttdc _ Johnny Cake Ridge Road EXISTING TRANSPORTATION SYSTEM The site for the proposed development is presently undeveloped, and generally used for agricultural purposes. The site presently generates no trips. It is bound on the west and north by commercial /industrial and recreational uses, on the south by 147 Street W and no the east by Johnny Cake Ridge Road. Figure 1 shows the study area. 147 Street W is a three -lane minor collector roadway from Galaxie Avenue to the west through the intersection with Johnny Cake Ridge Road where it becomes Upper 147 Street W, and past Pilot Knob Road to the east where it turns south and becomes Embry Path. 147 Street W is posted at 35 mph. Johnny Cake Ridge Road is a four -lane undivided major collector. Johnny Cake Ridge Road begins at CR 42 to the south and runs north past CSAH 38 and into the City of Eagan. The speed limit for Johnny Cake Ridge Road is 45 mph. The following describes the geometry and traffic control at the existing study intersection: • 147 Street W and Johnny Cake Ridge Road - This is a four - legged, all -way stop - controlled intersection. The north and south approaches each provide two lanes, a shared through /left and a shared through /right. The east and west approaches are served by one left turn lane, one through lane and one right turn lane. ANALYSIS PROCESS The purpose of this analysis is to determine the existing, build and full build traffic operations for the roadway network within the vicinity of the proposed development. The following summarizes the study process and evaluation results. Analysis Tool Synchro /SimTraffic analysis software was used to analyze the existing and forecast traffic volumes. Synchro9 is a traffic operations analysis software package that implements the methodologies of the Highway Capacity Manual (HCM). Data from Synchro9 is transferred to SimTraffic9, a detailed microscopic model that considers vehicle driver behavior, detailed interaction of vehicles with each other and the roadway between adjacent intersections, random behavior of drivers, and the delay for individual vehicles throughout the peak hour. Synchro9 uses the HCM methodology to analyze intersection operations through one cycle of a traffic signal while SimTraffic9 simulates the operation of the network of traffic signals through multiple cycles over a specified period of time (e.g., 60 minutes). All analysis results are from SimTraffic9 and are based on the average of six SimTraffic9 model runs for each peak hour and scenario. Intersection Level of Service The ability of an intersection to process traffic is affected by the number and type of vehicles, desired turning movements, intersection geometrics, and traffic control devices. Intersection level of service (LOS) differs from segment LOS in that the quality of traffic operations is defined as the delay to vehicles caused by the intersection's traffic control rather than the ratio of Page 5 K.n_'91? -010 Traffic.Karamclla 112lli, SIUdv R 011.dWN vehicle volumes to roadway capacity. Intersection LOS typically focuses on operations during the periods of the day with the highest traffic volumes, whereas segment LOS is based on traffic volumes over an average 24 -hour period. Thus, the intersection LOS analysis gives a "worst - case" result for each intersection and more clearly identifies operational problems at the intersections. The intersection operational analysis process includes determining the LOS for the key intersections under the existing peak hour traffic conditions. The City of Apple Valley requires that Level of Service C or better shall be maintained for Build conditions and a Level of Service D or better for the 10 -year Build conditions. In addition to LOS requirements, the intersection volume to capacity ratios (v /c) shall be kept under 0.85. Figure 3 presents the intersection LOS thresholds, in terms of seconds of vehicle delay, as defined in the HCM. Figure 3. Intersection Level of Service Thresholds 80 - 55— 35- 20 - 10- LC6 E LOS D LOS C LOS B LOS A LOS F Congested . — 1. _ . I Not Congested Signalized Intersection 80- 35- 25- 15- 10- LOS E LOS D LOS C LC6 B LOS A LOS F Congested 1 Not .Congested Unsignalized Intersection SOURCE: Highway Capacity Manual, 2010. TRANSPORTATION SCENARIOS Three transportation scenarios were analyzed for the proposed development. These scenarios included the following: • Year 2015 Existing Conditions • Year 2016 Build Conditions • Year 2025 Build Conditions Year 2015 Existing Conditions The existing conditions establish a baseline from which to compare future traffic operations with the addition of the proposed development. Study intersection turning movement volumes for this scenario were obtained from the previously completed Traffic Impact Study for ISD 196 Transportation Hub in Apple Valley, MN, by Wenck Associates dated May 8, 2015. The turning movement counts were collected in April 2015. Existing peak hour turning movement volumes are shown in Figures 4 and 5. Page 6 K i.0I9I 2.0301 ra Ric'Karaniel la franYc Study Report .dm 154 299 Page 7 154 299 0 0 147th Street W and West Access Existing A.M. 0 147th Street W and West Access Existing P.M. 0 Figure 4. Existing A.M. Peak Hour Turning Movement Volumes 236 219 390 518 Approach Tot. 219 4 t Intesection Approach Tot. 236 Approach Tot. d 4 Total 154 1 154 t I r Intesection Approach Tot. 299 299 Total 0 147th Street W and East Access Existing A.M. 0 t Existing P.M. 0 N t N 147th Street W and East Access 236 390 236 219 219 518 154 299 68 54 32 Figure 4. Existing P.M. Peak Hour Turning Movement Volumes 95 122 82 85 54 104 147t 38 a E x 348 348 North Access and JCRR Existing A.M. 389 389 348 199 147th Street W and JCRR Existing A.M. 280 386 499 499 North Access and JCRR Existing P.M. 1 414 414 499 350 64 52 41 97 28 1054 913 338 260 Existing average daily traffic volumes (ADT), as collected from MnDOT, are shown in Figure 6. 737 166 K - 029124130 IanlPxarune!'a Traffic SO4y k pon.Jo,. JI STUDY R }ol •ddy l•dc INTERSECTION F N SCENARIO / PK HR ir 154 299 Page 7 154 299 0 0 147th Street W and West Access Existing A.M. 0 147th Street W and West Access Existing P.M. 0 Figure 4. Existing A.M. Peak Hour Turning Movement Volumes 236 219 390 518 Approach Tot. 219 4 t Intesection Approach Tot. 236 Approach Tot. d 4 Total 154 1 154 t I r Intesection Approach Tot. 299 299 Total 0 147th Street W and East Access Existing A.M. 0 t Existing P.M. 0 N t N 147th Street W and East Access 236 390 236 219 219 518 154 299 68 54 32 Figure 4. Existing P.M. Peak Hour Turning Movement Volumes 95 122 82 85 54 104 147t 38 a E x 348 348 North Access and JCRR Existing A.M. 389 389 348 199 147th Street W and JCRR Existing A.M. 280 386 499 499 North Access and JCRR Existing P.M. 1 414 414 499 350 64 52 41 97 28 1054 913 338 260 Existing average daily traffic volumes (ADT), as collected from MnDOT, are shown in Figure 6. 737 166 K - 029124130 IanlPxarune!'a Traffic SO4y k pon.Jo,. JI STUDY R. ipl . ddy l .dc INTERSECTION F 71 SCENARIO / PK HR ir 154 299 Page 7 154 299 0 0 147th Street W and West Access Existing A.M. 0 147th Street W and West Access Existing P.M. 0 Figure 4. Existing A.M. Peak Hour Turning Movement Volumes 236 219 390 518 Approach Tot. 219 4 t Intesection Approach Tot. 236 Approach Tot. d 4 Total 154 1 154 t I r Intesection Approach Tot. 299 299 Total 0 147th Street W and East Access Existing A.M. 0 t Existing P.M. 0 N t N 147th Street W and East Access 236 390 236 219 219 518 154 299 68 54 32 Figure 4. Existing P.M. Peak Hour Turning Movement Volumes 95 122 82 85 54 104 147t 38 a E x 348 348 North Access and JCRR Existing A.M. 389 389 348 199 147th Street W and JCRR Existing A.M. 280 386 499 499 North Access and JCRR Existing P.M. 1 414 414 499 350 64 52 41 97 28 1054 913 338 260 Existing average daily traffic volumes (ADT), as collected from MnDOT, are shown in Figure 6. 737 166 K - 029124130 IanlPxarune!'a Traffic SO4y k pon.Jo,. 7 Johnny Cake Ridge Road A Synchro /SimTraffic Model was developed to analyze existing traffic conditions near the proposed development. Table 1 displays the existing a.m. and p.m. peak hour intersection delay and level of service results. Currently all movements of the study intersection operate within the Level of Service C threshold. The v/c ratios for the 147 Street W and Johnny Cake Ridge Road intersection are 0.41 (a.m.) and 0.47 (p.m.). Page 9 Table 1. Existing A.M. and P.M. Peak Hour Measures of Effectiveness (MOEs) Intersection Location JCCR & 147th Approach NB WB SB EB Movement Delay* (LOS) Left 8 (A) 7 (A) 7 (A) 7 (A) Through 8 (A) 9 (A) 7 (A) 8 (A) AM Peak Right 4 (A) 4 (A) 4 (A) 3 (A) Intersection Delay* (LOS) 7 (A) Movement Delay* (LOS) Left 8 (A) 7 (A) 8 (A) 8 (A) Through 1 Right 8 (A) 9 (A) 8 (A) 9 (A) PM Peak 5 (A) 4 (A) 5 (A) 5 (A) Intersection Delay* (LOS) 7 (A) " Delay measured in seconds per eehicle 2016 Build Conditions The proposed development will have three accesses. Figure 2 shows the three access intersections and they are described as follows: 1. 147 Street W and West Access — This will be a three - legged, minor approach stop - controlled intersection. The City of Apple Valley has indicated they will require a right turn lanes for westbound 147 Street trips entering the development. The east approach is served by one through lane and the left turn lane that is part of the two -way left -turn lane ( TWLTL). The west approach is served by one through lane and the newly constructed right turn lane, and the north (minor) approach provides one shared left /right turn lane. The West Access will serve the loading docks and the parking area for primarily manufacturing employees. 2. 147 Street W and East Access — This will be a three - legged, minor approach stop - controlled intersection. The City of Apple Valley has indicated they will require a right turn lanes for westbound 147 Street trips entering the development. The east approach is served by one through lane and the left turn lane that is part of the TWLTL. The west approach is served by one through lane and the newly constructed right turn lane, and the north (minor) approach provides one shared left /right turn lane. The East Access serves the retail facility and parking area for primarily office and retail employees. 3. 147 Street W and Johnny Cake Ridge Road —This intersection geometry and control is not changed from the Existing Conditions. 4. North Access and Johnny Cake Ridge Road —This will be a three - legged, right -in /right- out intersection. A pork chop island will be built for the west approach allowing only right turns in from southbound Johnny Cake Ridge Road and right turns out from the development onto southbound Johnny Cake Ridge Road. A southbound right turn lane will be constructed as part of the development for vehicles accessing the development. K )2912 -030 Tr,Qic Karamclla traffic Study R ryvm .d�c� The west approach will be stop controlled. During this scenario, the North Access serves the retail and office parking areas for vehicles approaching from the north. In order to represent expected 2016 Build conditions, trips were generated based on the size, intensity and type of land use in the proposed development. These trips were then distributed across the roadway network based on distribution percentages derived from the existing traffic patterns and the locations of expected origins and destinations for this type of manufacturing /retail facility. The total sum of the existing volumes and the newly generated and distributed trips resulted in the 2016 Build volumes. The process of forecasting future traffic includes three key steps: • Trip Generation, • Trip Distribution, and • Trip Assignment. Trip Generation Trip generation estimates were developed for the initial phase of the proposed development using data presented in the ITE Trip Generation, Ninth Edition, 2012. The resulting trips are shown in Table 2. Page 10 Table 2. Phase 1 Trip Generation for the Proposed Karamella Addition Future Use Total SF (in 1000s) AM Trips pM Trips ITE Code /Description In Out Total In Out Total Weekday Trips Candy Manufacturing Retail (Candy) Store 74.5 3.5 (110) General Light Industrial (820) Shopping Center 68 3 71 8 9 76 4 80 12 7 19 70 7 71 82 14 96 519 150 669 Trip Distribution The next step in the traffic forecasting process is to establish trip distribution percentages. This step was completed based on distribution percentages derived from the existing traffic patterns and the locations of expected origins and destinations for this type of manufacturing /retail facility. Trip distribution percentages for the proposed development are shown in Figure 7. Trip Assignment Trip generation estimates for the proposed development were then assigned to the local roadway network based on the trip distribution percentages. Development related turning movement volumes are shown in Figures 8 and 9 The assigned development trips were then added to the existing trips to get the Build Scenario turning movements. The peak hour 2016 Build volumes are shown in Figures 10 and 11. K , I :417- 11V,:1 ra lli. Ka, nulls Ira Ric Sht,1 Ream r - V4NHH Ifs, 14 10 147th Street W and West Access Development A.M. 41 41 4 0 INTERSECTION F 4 2 147th Street W and West Access Development P.M. 7 12 2 5 INTERSECTION F 9 4 147th Street W and East Access Development A.M. 12 53 5 4I INTERSECTION F 44 '71 STUDY ! •40j •ddy it . dc 7 INTERSECTION F SCENARIO / PK HR 71 SCENARIO / PK HR 1!' 44 2 147th Street W and East Access Development P.M. 6 13 42 7 "Si col do '41 STUDY INTERSECTION App. Tot. y F "Si SCENARIO / PK HR IO' Page 12 Figure 8. Phase 1 Development Generated A.M. Peak Hour Turning Movement Volumes 6 1 0 52 10 1 1 42 0 5 61 68 Approach Tot. 4, 4I t 1 Intesectian Approach Tot. Total dJ 4I 4 0 3 �1 I t I r Intesection Approach Tot. Total 0 Figure 9. Phase 1 Development Generated P.M. Peak Hour Turning Movement Volumes 20 5 1 115 0 t N 3 t N 65 77 57 2 4 5 16 16 25 14 24 l 2 7 7 18 14 North Access and JCRR Development A.M. 2 2 14 147th Street W and JCRR Development A.M. 24 2 North Access and JCRR Development P.M. 16 16 3 147th Street W and JCRR Development P.M. 15 20 61 25 75 15 KAI29I211 0 lralic'liaramella I ran: SIudy kepon dncx 168 10 147th Street W and West Access Build A.M. 41 277 158 236 INTERSECTION r 303 • STUDY t App. Tot. ,p. Ti 224 INTERSECTION r no SCENARIO / PK HR r 303 2 147th Street W and West Access Build P.M. 7 231 301 224 INTERSECTION ` — 163 4 147th Street W and East Access Build A.M. 12 289 159 277 INTERSECTION ` — 343 'r STUDY t 'tol - ddy 1d( 226 INTERSECTION 1 SCENARIO / PK HR r 343 2 147th Street W and East Access Build P.M. 6 232 341 226 Page 13 Figure 10. 2016 Build Condition A.M. Peak Hour Turning Movement Volumes 6 1 10 0 5 52 0 42 451 586 Approach Tot. r 4 t I r Intesection Approach Tot. Approach Tot. 4, 1 Approach Tot. Total t I Intesection Total t N 3 0 0 t N 20 5 1 1 15 455 595 162 356 70 56 36 111 138 107 99 78 106 45 366 362 North Access and JCRR Build A.M. 391 391 362 199 147th Street W and JCRR Build A.M 280 410 Figure 11. 2016 Build Condition P.M. Peak Hour Turning Movement Volumes 503 501 North Access and JCRR Build P.M. 430 430 506 341 260 357 64 52 59 147th Street W and JCRR Build P.M. 52 41 112 28 59 81 24 757 1115 936 1383 181 164 2016 Build Conditions Analysis The 2016 Build Conditions a.m. and p.m. volumes were used in the Synchro /SimTraffic Model, which includes the new Development Access intersections. Table 3 displays the 2016 Build Condition intersection delay and level of service results. The v/c ratios for the for the 147 Street W and Johnny Cake Ridge Road intersection are 0.43 (a.m.) and 0.49 (p.m.). K • 1)29I _2 -I tI• I raltic'Karamclla lrallic Study Itepon.dncx o v Location c m Intersection 147th & West Access Table Approach NB 3. 2016 Build A.M. AM and Peak P.M. Peak Intersection Delay* (LOS) 1 (A) Hour MOEs PM Peak Intersection Delay* (LOS) 1 (A) Movement Delay* (LOS) Movement Delay* (LOS) Left 0 (A) Through 0 (A) Right 0 (A) Left 0 (A) Through 0 (A) Right 0 (A) WB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) SB 7 (A) 0 (A) 3 (A) 7 (A) 0 (A) 3 (A) EB 3 (A) 1 (A) 0 (A) 0 (A) 1 (A) 0 (A) c in 14 7th & East Access NB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) WB 0 (A) 2 (A) 1 (A) 0 (A) 1 (A) 1 (A) SB 6 (A) 0 (A) 0 (A) 7 (A) 0 (A) 3 (A) EB 2 (A) 0 (A) 0 (A) 3 (A) 1 (A) 0 (A) 0. c is JCCR & 147th NB 9 (A) 9 (A) 5 (A) 8 (A) 9 (A) 9 (A) 4 (A) 8 (A) WB 7 (A) 9 (A) 4 (A) 7 (A) 9 (A) 4 (A) SB 7 (A) 8 (A) 4 (A) 8 (A) 9 (A) 6 (A) EB 7 (A) 8 (A) 4 (A) 8 (A) 10 (B) 5 (A) c tri 1= JCCR &North A ccess NB 0 (A) 2 (A) 0 (A) 2 (A) 0 (A) 2 (A) 0 (A) 2 (A) WB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) SB 0 (A) 1 (A) 1 (A) D (A) 1 (A) 0 (A) EB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 3 (A) i aoie 4. run bulla -uut i rip Generation Total SF tor the AM Trips Proposed Kararnella PM Trips Addition Future Use (in 1000s) ITE Code /Description In Out Total In Out Total Weekday Trips Candy Manufacturing 163.6 (110) General Lghl Industrial 149 17 166 25 152 177 1,140 Retail (Candy) Store 3.5 (820) Shopping Center 3 1 4 7 7 14 150 152 18 170 32 159 191 1,290 Delay measured in seconds per %ehicle Under 2016 Build conditions all the study intersections are expected to operate acceptably during both peak hour periods and have v/c ratios of Tess than 0.85. 2025 Build Conditions In order to represent 2025 Build conditions, trips generated by the full build -out of the proposed development are added to the expected 2025 traffic volumes. Similar to other studies in the area, a two percent per year growth factor was applies to the existing volumes to account for background growth on 147 Street and Johnny Cake Ridge Road. Trip generation estimates were developed for the full build -out of the proposed development, which includes 86,500 additional sf of manufacturing space (including supporting office and warehousing). The resulting trips are shown in Table 4. Page 14 • One element of the full build -out plan is a driveway around the north side of the lot that will connect to the North Access, the right -in /right -out on Johnny Cake Ridge Road. This will allow vehicles accessing the loading docks and parking area for primarily manufacturing employees to enter from and exit to southbound Johnny Cake Ridge Road. As such, the distribution percentages do not change from the prior scenario, but the assignment patterns differ slightly. K n_912.030 :'I rallic titud■ Re tlao 29 21 147th Street W and West Access Full Dev A.M. 7 9 80 8 1 0 0 6 4 147th Street W and West Access Full Dev P.M. 13 22 2 9 0 0 17 Jo STUDY R col . d dy gyp. T 79 INTERSECTION r 7 SCENARIO / PK HR ir 17 ' STUDY R App. Tot. )p. T 79 INTERSECTION F 7 SCENARIO / PK HR r 17 8 147th Street W and East Access Full Dev A.M. 24 103 9 79 0 0 77 2 147th Street W and East Access Full DevP.M. 8 21 75 13 0 0 The distributed and assigned trips generated by the full build -out of the proposed development (shown in Figures 12 and 13), added to the 2025 background trips result in the 2025 Build Condition turning movement volumes (shown in Figures 14 and 15). 2016 Build ADTs based on the distributed trips generated by phase 1 of the proposed development added to existing volumes, and 2025 Build ADTs based on the distributed trips generated by full build -out of the proposed development added to background growth factored volumes are shown in Figure 16. Figure 12. Full Build Development Generated A.M. Peak Hour Turning Movement Volumes 11 2 0 0 9 97 22 1 0 1 75 120 r 4, Page 15 0 Approach Tot. 125 t I r Intesection Approach Tot. Approach Tot. 4 1 Approach Tot. Total 4 0 t N 3 1 t I r Intesection Total 0 1 N 36 9 1 0 1 27 0 124 134 12 26 102 0 0 3 0 0 26 33 26 43 20 12 0 2 0 12 32 12 North Access and JCRR Full Dev A.M. 4 4 15 2 147th Street W and JCRR Full Dev A.M. 56 I 0 56 Figure 13. Full Build Development Generated P.M. Peak Hour Turning Movement Volumes 7 North Access and JCRR Full Dev P.M. 33 33 28 16 0 0 0 0 1 0 147th Street W and JCRR Full Dev P.M. 0 12 0 0 35 0 0 0 7 0 0 39 118 66 149 35 K. [nitriic Study Report dcx, 370 4 147th Street W and West Access 2025 Build P.M. 13 289 366 276 0 0 217 21 147th Street W and West Access 2025 Build AM 79 368 196 289 0 0 •10j - ddy a STUDY INTERSECTION SCENARIO / PK HR t . oj'ddy r„•• r 71 r 205 8 147th Street W and East Access 2025 Build AM 24 391 197 367 0 0 441 2 147th Street W and East Access 2025 Build P.M. 8 288 439 280 0 0 App. Tot. STUDY INTERSECTIO SCENARIO / PK HR ft App. Tot. me r 71 r Page 16 Figure 14. 2025 Build Condition A.M. Peak Hour Turning Movement Volumes 11 2 0 0 9 97 22 I 0 1 75 0 595 756 Approach Tot. 4) 4 I �► t 1 f Intesection Approach Tot. Approach Tot. 4, 1 Total 1 t 1 Intesection Approach Tot. Total 0 0 0 1 N 4 3 1 N 36 9 1 0 I 27 599 765 200 26 466 0 0 87 69 44 0 0 26 149 175 143 20 North Access and JCRR 2025 Build AM 0 122 5 0 456 436 478 478 439 116 1 245 79 147th Street W and JCRR 2025 Build AM 341 527 Figure 14. 2025 Build Condition A.M. Peak Hour Turning Movement Volumes 615 610 North Access and JCRR 2025 Build P.M. 538 538 636 58 1 317 439 63 0 0 129 1 428 I 79 147th Street W and JCRR 2025 Build P.M. 0 63 0 0 0 0 50 153 34 72 101 29 0 937 1403 1179 1743 237 202 K 1)29I2- O3Otr'. rallic J<aramella Ir fic Study R p rl.dna 7,640 (7,770) Johnny Cake Ridge Road ° c o o v. to 3 c Intersection Location 147th & West Access Table Approach NB 5. 2025 Movement Left 0 (A) Build A.M. and AM Peak Delay* (LOS) Through Right 0 (A) 0 (A) P.M. Peak Intersection Delay* (LOS) 1 (A) Hour MOEs PM Peak Intersection Delay* (LOS) 1 (A) Movement Delay* (LOS) Left 0 (A) Through 0 (A) Right 0 (A) WB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) SB 7 (A) 0 (A) 4 (A) 9 (A) 0 (A) 4 (A) EB 4 (A) 1 (A) 0 (A) 4 (A) 2 (A) 0 (A) c o 2 147th & East Access NB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) WB 0 (A) 2 (A) 2 (A) 0 (A) 1 (A) 2 (A) SB 14 (B) 0 (A) 3 (A) 10 (B) 0 (A) 3 (A) EB 3 (A) 0 (A) 0 (A) 3 (A) 1 (A) 0 (A) O 3 2 JCCR & 147th NB 12 (B) 11 (B) 6 (A) 10 (B) 13 (B) 11 (B) 6 (A) 11 (B) WB 8 (A) 11 (8) 5 (A) 9 (A) 12 (B) 6 (A) SB 12 (B) 11 (B) 8 (A) 13 (B) 13 (B) 10 (B) EB 9 (A) 9 (A) 4 (A) 12 (B) 12 (B) 6 (A) c v, g JCCR & North Access NB 0 (A) 2 (A) 0 (A) 2 (A) 0 (A) 2 (A) 0 (A) 2 (A) WB 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) 0 (A) SB 0 (A) 1 (A) 1 (A) 0 (A) 1 (A) 1 (A) EB 0 (A) 0 (A) 3 (A) 0 (A) 0 (A) 3 (A) 2025 Build Analysis The 2025 Build Conditions a.m. and p.m. volumes were used in the Synchro /SimTraffic Model, which includes the new Development Access intersections. Table 5 displays the 2025 Build Condition intersection delay and level of service results. The v/c ratios for the intersection are 0.54 (a.m.) and 0.58 (p.m.). Delay measured in seconds per sehicle Under 2025 Build conditions all the study intersections are expected to operate acceptably during both peak hour periods and have v/c ratios of less than 0.85. Page 18 K.'9 ?912- 03u' 'rra Ric Swdy Repon.dcea SUMMARY The following summarizes the findings of the traffic study for the proposed Karamella Addition in Apple Valley, Dakota County, Minnesota: Page 19 • The proposed development is expected to be built in two phases. o The initial phase is expected to generate 669 daily trips. • This includes 80 trips during the a.m. peak hour and 96 trips during the peak hour. o The full build -out is expected to generate 1,290 daily trips. • This includes 170 trips during the a.m. peak hour and 191 trips during the peak hour. • The intersection of 147 Street W and Johnny Cake Ridge Road operates in an acceptable manner under peak hour existing conditions, with minimal delay and a maximum v/c ratio of 0.47. • Under 2016 Build conditions the analysis results show the 147 Street W and Johnny Cake Ridge Road intersection continues to operate in an acceptable manner. Expected delays are minimal, and the maximum peak hour v/c ratio is 0.49. • For the 2016 Build scenario, the intersections providing access to the proposed development were also analyzed. The geometry assumes exclusive right turn lanes for 147 Street W and Johnny Cake Ridge Road at all three of the accesses based on the requirements identified by the City. The new study intersections operate acceptably during both peak hours, with minimal delay and low v/c ratios. • The 2025 Build Conditions were developed using a two percent per year growth rate from 2015 to 2025, and trips generated by the full build -out of the proposed development. Under the 2025 Build conditions the analysis results show the 147 Street W and Johnny Cake Ridge Road intersection continues to operate in an acceptable manner. Expected delays increase, but are well below the LOS D threshold, and the maximum peak hour v/c ratio is 0.58. • For the 2025 Build scenario, the intersections providing access to the proposed development were also analyzed. The three proposed development access intersections are expected to continue to operate acceptably during both peak hours, with minimal delays for the stop controlled approach and low v/c ratios. K:02912.030 I a 1RC`Karamella 1 rallic St.)) Kepon.rkxa Site •• •••• •••• • •1 CITY OF Apple Valley TO: Maggie M. Dykes, Planner FROM: Brandon S. Anderson, Asst. City Engineer DATE: August 14, 2015 SUBJECT: Karamella Addition Preliminary Plat Review Maggie, MEMO Public Works The following are comments regarding the Karamella site plan dated August 12, 2015. Please include these items as conditions to approval. General • Drainage and Utility easement as shown in Outlot A should be modified to include pond slopes and the 46' drainage and utility easement along the north property line can be reduced in size as in only appears to cover the trunk storm sewer. • All work and infrastructure within public easements or right of way shall be to City standards. • A pre- construction meeting shall be held prior to beginning any work on the site. • No trees will be permitted in public easements. Permits • Provide a copy of the executed Encroachment Agreement with Magellan Pipeline for work occurring within easement area as indicated on plans. • Provide a copy of the executed Minnesota Department of Health, Minnesota Pollution Control Agency, Met Council, Department of Labor and any other required permits. • A right of way permit will be required for all work within public easements or right of way. • A Natural Resource Management Permit (NRMP) will be required prior to any land disturbing activity commences. • See attached Memo from Bolton & Menk dated 8/12/15 regarding additional preliminary traffic impact review requirements. • Provide additional dimensions on the site plan indicating dimensions to access points, radiuses, drive lane widths, etc. • Provide auto turn drawing showing internal circulation of trucks /vehicles. Grading, Drainage and Erosion Control • The applicant shall submit a copy of the General Storm Water Permit approval from the Minnesota Pollution Control Agency pursuant to Minnesota Rules 7100.1000 — 7100.1100 regarding the state NPDES Permit prior to commencement of grading activity. • Erosion control measures shall be installed prior to beginning grading operations. • A construction entrance shall be provided at all proposed entrances to be utilized for erosion control purposes. • Street sweeping shall be performed as necessary to address material tracking from the site. • The proposed stormwater pond and infiltration basin as submitted are sized to accommodate Lot 1 Block 1 only stormwater requirements. • The total allowable discharge rate from the site is 3.2 cfs (59 offsite acres x 0.044cfs /acre = 2.6 cfs + 13.5 acres x 0.044 cfs /acre = 0.6 cfs = 3.2 cfs). The proposed discharge rate is 3_1 cfs. (2.6 cfs offsite + 0.5cfs modeled). • Provide an accessible route (8' min. bench) for future maintenance access to outlet structure (STMH #22) and stormwater basin. Route should be covered by drainage and utility easement. • Consider relocating centroid of pond to the NE so all the pond slopes are included in Lot 1 Block 1. • Show Buffer line, HWL line for sedimentation pond and infiltration area on the grading plan. Storm Sewer • Provide storm sewer calculations (Rational method) for proposed improvements. • One FES outlet to stormwater pond is preferred. Landscape and Natural Resources • A protective buffer zone in accordance with ordinance 152.57 is required (16.5 feet for any stormwater pond) and shall be indicated on the plans with appropriate seed mix. Buffer shall be provided from top of infiltration bench elevation outward 16.5'. • Because native vegetation can be so hard to establish, provide a 3 year establishment plan. The plan should have information about when seed will be installed, tasks taken to prevent weed establishment, and information on the timing to the connection to the stormwater system. • 5 trees as shown along the western edge of storm water pond should be relocated to the south or east side of the pond. City of Apple Valley TO: Maggie Dykes, City Planner FROM: Roy Kingsley, Fire Marshal DATE: July 21, 2015 SUBJECT: Karamella Addition MEMO Fire Department • MSFC 503.2.1 Dimensions: Fire apparatus access roads shall have an unobstructed width of not less than 20 feet except for approved security gates in accordance with section 503.6 and an unobstructed vertical clearance of not less than 13 feet 6 inches. • MSFC 505.1 Address Numbers: Requires numbers to be visible from the street. • MSFC 506.1 Key Boxed: Requires building to have an Apple Valley Fire Dept. key box installed Model S -3 or R -3 with Tamper switch. • MSFC 903.2: Requires building to have a fire sprinkler system installed. • MSFC 903.4: Requires a fire alarm system to monitor the fire sprinkler system and key box. • MSFC 906.1: Requires fire extinguishers to be installed were needed per the fire code. KaramellaAddition Presentation to the Planning Commission August 19, 2015 Request Amend Zoning ordinance to allow for ancillary • retail in conjunction with a permitted use in the “I-1”, “I-2”, and “BP” zoning districts Subdivision by preliminary plat to create one (1) • lot and one (1) outlot Site Plan/Building Permit Authorization for an • approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. ancillary retail facility Location 21.58-acre parcel northwest of Johnny Cake Ridge Road and 147Street W. th Comprehensive Plan “IND” (Industrial) Zoning “I-2” (General Industrial) Zoning Amendment Industrial Zones do not allow for ancillary retail • Request is to allow ancillary retail • Draft language: • Retail does not exceed 15% of the total floor area or • 5,000 sq. ft., whichever is smaller. Retail uses are subordinate to primary use • Products manufactured or related to principal use • Parking requirements for retail uses must be met in • addition to primary industrial/business park use. Allows a tenant to have a retail operation to sell • products manufactured or warehoused on the site. Does not detract from the overall industrial use of • property Industrial/BP Zones Preliminary Plat (revised) OutlotA Lot 1, Block 1 KaramellaAddition Create one 11.11-acre lot and 8.21-acre outlot Site Plan (revised) Building Expansion Area Grading Plan (revised) Storm Sewer Plan (revised) Utility Plan (revised) Landscape Plan (revised) Building Floor Plan Building Elevations x Public Hearing Public hearing held August 5, 2015. No major concerns • Bike racks • Additional pedestrian connections • Retail store architecture • Lighting plan • Landscaping • Revised plans address most of the concerns • Missing items addressed in conditions of approval • Recommended Actions 1. Recommend approval of the draft ordinance amendment to allow for ancillary retail in conjunction with a permitted use in the “I-1”, “I-2”, and “BP” zoning districts. Recommended Actions (cont.) 2.Recommend approval the preliminary plat of Karamella Addition, a subdivision by preliminary plat to create one (1) lot and one (1) outlotas shown on the plans received in City offices on August 12, 2015, subject to all applicable City codes and standards, and the following conditions: a.All necessary drainage and utility easements shall be dedicated on the plat for any existing and future public utility infrastructure. b.A 26’-wide trail/drainage/utility easement shall be dedicated along the east side of the property to provide for a future bike trail. c.The property owner shall provide for park dedication for the manufacturing building, which shall be in cash-in-lieu of land and paid prior to the release of the final plat for filing. d.No building permit shall be issued until the final plat of KaramellaAddition is filed with Dakota County Recorder’s Office, a Development Agreement is executed by the developer and City and all the conditions of the executed Development Agreement have been met by the applicant. Recommended Actions (cont.) 3.Recommend approval of Site Plan/Building Permit Authorization for an approximately 69,500 sq. ft. manufacturing and warehouse facility, and attached 4,200 sq. ft. ancillary retail facility, as shown on the plans received in City offices on August 12, 2015, subject to all applicable City codes and standards, and the following conditions: a.There shall be no operation of the ancillary retail until the adoption and publication of the amendment to Chapter 155 (Zoning) allowing for ancillary retail in conjunction with a permitted use. b.The subject building shall be located on Lot 1, Block 1, KaramellaAddition. c.There shall be a minimum of 196 parking spaces constructed in the first phase of the development. Any future phases shall require additional parking to meet the needs of the development per City code. d.No building permit shall be issued until a Natural Resources Management Permit has been obtained. e.Submission of a nursery bid list that confirms the landscape materials and irrigation system meet or exceed 1½ percent of the value of the construction of the building based on Means Construction Data. f.The property owner shall install bike racks at the retail store. g.Additional pedestrian connections from 147th Street shall be made to the retail store. h.The trash enclosure shall be constructed of the same materials as the primary building. i.A lighting plan shall be submitted to ensure compliance with the City’s photometric requirements of 1.0 footcandlesat the property line, and all lighting shall be arranged and shielded so as to deflect light away from any adjoining residential uses or public roads. j.The property owner shall address the comments raised by the Assistant City Engineer in his memo dated August 14, 2015. k.The property owner shall address the comments raised by the Fire Marshal in his memo dated July 21, 2015. Questions? *** *8 *0000 ** 0* **0 City of Apple 11 ValieV MEMO Community Development TO: Chair Melander and Planning Commissioners FROM: Bruce Nordquist, Community Development Director, AICP DATE: August 19, 2015 SUBJECT: Review and Discussion related to the Mixed Business Campus designation in the 2030 Comprehensive Plan A review and discussion is planned over the next few months at Planning Commission meetings concerning the Mixed Business Campus designation in the 2030 Comprehensive Plan. The 2030 Comprehensive was adopted by the City Council on January 14, 2010. A prior action taken by the City Council in May, 2009, directed staff "to review and update the City Council every five years on development and continued viability of the Mixed Business Campus." It has been five years since the adoption of the 2030 Comprehensive Plan. The following review schedule is planned: • July 15 — Re-introduction of the background to the Comprehensive Plan designation (completed) • August 19 — Official actions taken related to sand and gravel mining, reclamation and development • September 16 — Developing interest and development options for the Mixed Business Campus during the last five years • October 21 — Market responses and development options by development professionals moving forward 7/4 Mixed Business Campus Revisited August 19, 2015 Apple Valley Planning Commission Council Actions Related to the 2030 Comprehensive Plan •May, 2009 “Staff is directed to review and update the City Council every five years on development and continued viability of the Mixed Business Campus as set forth in the 2030 Comprehensive Plan Update.” •January, 2010 “The updated Apple Valley Comprehensive Guide Plan is adopted.” w 2030 Comprehensive Plan A Guide for Economic Development •More households. •More jobs. •Jobs that support households. •New job choices for 18,000 to 20,000 that commute elsewhere on a daily basis. •A population of 71,200 and 22,000 jobs in 2030 is forecasted. Analysis by Owner, Fischer in 2007 •Alternative Urban Areawide Review (AUAR) •Up to 3 million sq. ft. of office, commercial, industrial, and warehouse uses •Up to 2,260 housing units •Environmental impacts are identified, managed, and mitigated MBC by the Numbers •After roads/parks/ponding; about 200 to 210 acres for development •The sq. ft. of development ranges from about 2.7 million to 3.2 million •About 55% is single and multi-tenant, office and light industry (approx. 110 acres) •About 20% is for healthcare, clinics, training (approx. 40 acres) •About 20% is for medium density housing (approx. 40 acres & 1,100 units) •The balance, about 5% or 100,000 sq. ft., is for retail •The number of jobs created ranges from 7,600 to 9,300 w Office/Medical and Housing/Retail Areas Today Mixed Business Campus Comp Plan Map Examples of Land Use Actions the Last 5 Years •MBC to Commercial (Menards/Fischer Point) •Medium Density Residential to Low Density Residential (Quarry Ponds) •Medium density Residential to Commercial/Low Density Residential (Apple Valley East Family 2 nd Addition) •Medium Density Residential to Low Density Residential (Embry Place) •High Density Residential/Commercial to High Density Residential (The Springs) •Park to Medium Density Residential (Cobblestone Lake 7 th Addition) FISCHER POINT/MENARDS LOCATION MAP SITE CENTRAL OPERATIONS AREA COMPREHENSIVE PLAN MAP “MBC” (Mixed Business Campus) LD FLYCATCHER LN EUROPA AVE IND MD IND JOHNNY CAKE RIDGE RD IND HD 146TH ST W 147TH ST W EVEREST AVE 148TH ST W ENERGY WAY IND IND C Area Proposed C 149TH ST W FLANDERS PATH to be FORUM PATH FLORENCE TRL Re-Designated C C C 150TH ST W INS SITE 151ST ST W 151ST ST GABELLA ST C FOLIAGE AVE 152ND ST W FLORIST CIR FORTINO ST MBC MD 153RD ST W FLAGSTAFF AVE FLOWER WAY P FROST PATH LD 154TH ST W MIX FLIGHT WAY LD P 156TH ST W HD FLIGHT LN FINCH AVE LD 157TH ST W C HD FOX LN MD LD LD AMENDED COMPREHENSIVE PLAN MAP “C” (Commercial) LD FLYCATCHER LN EUROPA AVE IND MD IND JOHNNY CAKE RIDGE RD IND HD 146TH ST W 147TH ST W EVEREST AVE 148TH ST W ENERGY WAY IND IND C Area Proposed C 149TH ST W FLANDERS PATH to be FORUM PATH FLORENCE TRL Re-Designated C C C 150TH ST W INS SITE 151ST ST W 151ST ST GABELLA ST C FOLIAGE AVE C 152ND ST W FLORIST CIR FORTINO ST MBC MD 153RD ST W FLAGSTAFF AVE FLOWER WAY P FROST PATH LD 154TH ST W MIX FLIGHT WAY LD P 156TH ST W HD FLIGHT LN FINCH AVE LD 157TH ST W C HD FOX LN MD LD LD PRELIMINARY PLAT MENARDS SITE PLAN QUARRY PONDS LOCATION MAP 151ST ST 153RD ST W FLORET WAY FLOWER WAY PILOT KNOB RD 154TH ST W 155TH ST W FLIGHT WAY FLOAT LN REGATTA PARK FLIGHT LN156TH ST W FINCH AVE FLOAT CT FLACKWOOD WAY FLAGSTAFF AVE FINESSE WAY FJORD AVE 157TH ST W FLACKWOOD AVE 157TH ST W EMPEROR AVE FLAN CT SITE QUARRY POINT FESCUE CT PARK FIRTREE LN 158TH ST W FLEET TRL FIRTREE DR FINCH LN FLOTILLA TRL FENNEL CT 160TH ST W FLAGSTAFF AVE W FAIRGREEN AVE EXCEL WAY LOWER 161ST ST W EXCELSIOR DR FINLAND AVE W FISHING AVE WFINCH AVE W DODD LN 161ST ST W EXCELSIOR CT COMPREHENSIVE PLAN MAP “MD” (Medium Density Residential) C 150TH ST W INS INS 151ST ST C MBC MBC LD MD FLOWER WAY LD LD C PILOT KNOB RD 155TH ST W LD P FLIGHT LN 156TH ST W FINCH AVE LD C C HD LD MD FLAGSTAFF AVE LD FJORD AVE 157TH ST W EMPEROR AVE FLAN CT SITE LD INS LD FIRTREE LN LD FIRTREE DR P 158TH ST W FLEET TRL FINCH LN LD HD 160TH ST W DODD LN LOWER 161ST ST W 161ST ST W AMENDED COMPREHENSIVE PLAN MAP “LD” (Low Density Residential) EMBER CT 150TH ST W INS INS 151ST ST LD MBC LD MBC P LD P EMBLEM WAY LD LD PILOT KNOB RD LD C 155TH ST W MD P FINCH AVE LD C C LD HD LD C 157TH ST W EMPEROR AVE INS LD SITE LD HD LD P ELMHURST LN FINCH LN HD LD 160TH ST W DODD LN LOWER 161ST ST W QUARRY PONDS PLAN APPLE VALLEY EAST FAMILY 2ADDITION ND SITE COMPREHENSIVE PLAN MAP “MD” (Medium Density Residential) INST MD LD MBC SITE P MD C C SITE AMENDED COMPREHENSIVE PLAN MAP “C” (Commercial And “LD” (Low Density Residential) INST MD LD MBC SITE LD P C MD C C EMBRY PLACE LOCATION MAP 149TH CT 149TH ST W EASTER AVE EMBRY PATH ECHO WAY EMBER CT 150TH ST W DUTCHMAN CT LEBANON CEMETERY DUNDEE AVE DUTCHMAN WAY DUPONT PATH SITE DUPONT CT DUNLIN CT DODD BLVD DUNDEE CT DUNBAR BLVD EMBLEM WAY EMBRY PATH DREXEL WAY DUNBAR AVE APPLE VALLEY EAST PARK PILOT KNOB RD EAGLE BAY DR 155TH ST W DUNHILL LN EARLY BIRD CIR EAGLE RIDGE RD EAGLEWOOD LN DUNRAVEN DR COBBLESTONE LAKE PKWY COMPREHENSIVE PLAN MAP “MD” (Medium Density Residential) LDLD EVEREST AVE IND ENERGY WAYENDICOTT WAY 148TH ST W LD 148TH PATH W EMBRY PATH IND IND LD LD IND LD MD 149TH ST W EASTER AVE EMBER CT ECHO WAY LD 150TH ST W PILOT KNOB RD DUTCHMAN WAY INS INS 151ST ST LD SITE DUNDEE AVE LD MD MBC P DODD BLVD P LD MD LD P EMBRY PATH LD MD MD COBBLESTONE LAKE PKWY C C LD HD C AMENDED COMPREHENSIVE PLAN MAP “LD” (Low Density Residential) INST SITE LD MBC LD P C MD C C EMBRY PLACE PLAN SPRINGS AT APPLE VALLEY LOCATION MAP 145TH ST FOLIAGE AVE SITE 146TH ST W FLAGSTAFF AVE 147TH ST W COMPREHENSIVE PLAN MAP “HD” (High Density Residential/12+ units per acre) and “C” (Commercial) LD 145TH ST FOLIAGE AVE HD SITE 146TH ST W C 147TH ST W FLAGSTAFF AVE FOLIAGE AVE AMENDED COMPREHENSIVE PLAN MAP “HD” (High Density Residential/12+ units per acre) LD 145TH ST FOLIAGE AVE HD SITE 146TH ST W Property to be HD Amended From “C” to “HD” 147TH ST W FLAGSTAFF AVE FOLIAGE AVE SITE PLAN COBBLESTONE LAKE 7 TH ADDITION DODD BLVD. EMBRY PATH CORTLAND APPLE VALLEY SITE EAST PARK 155TH STREET WEST EAGLE BAY DRIVE COBBLESTONE LAKE LOCATION MAP COMPREHENSIVE PLAN MAP “P” (Park) ELY AVE P DUNBAR BLVD DUNDEE CT LD DODD BLVD LD DREXEL WAY P EAGLE BAY DR LD MD DUNBAR AVE DREXEL CT LD P LD MD 155TH ST W DUNHILL LN SITE MD MD LD EAGLEWOOD LN EAGLE STONE RD COBBLESTONE LAKE PKWY LD EGRET PL AMENDED COMPREHENSIVE PLAN MAP “MD” (Medium Density Residential P LD DUNDEE CT DUNBAR BLVD DODD BLVD LD DREXEL WAY P EAGLE BAY DR LD MD DUNBAR AVE DREXEL CT SITE LD LD MD 155TH ST W DUNHILL LN LD MD MD EAGLEWOOD LN EAGLE STONE RD COBBLESTONE LAKE PKWY LD EGRET PL C SITE PLAN 2015 –Next Steps/Work Plan •Multiple PC meetings that assist to “review and update the City Council” •Upcoming: The land use market place today Similar? Different? Success Stories? •Upcoming: SWOT Analysis Strengths, Weaknesses, Opportunities, Threats