Loading...
HomeMy WebLinkAbout1972/08/09VILLAGE OF APPLE VALLEY Dakota County, Minnesota Minutes of the meeting of the Village Council Village of Apple Valley, Dakota County, Minnesota held August 9, 1972. PRESENT: Mayor Largen; Councilmen Garrison, Hollenbeck and Pearsall (attended until 7:45 p.m.); Clerk Asleson ABSENT: Councilman Branning. The Mayor called the meeting to order at 7:34-p.m. All residents attending took part in the pledge of aliegiance to the flag. Councilman-Hollenbeck gave the invocation. MOTION: of Hollenbeck, seconded by Garrison, to pass Ordinance No. 116, abolishing the office of the Justice of the Peace in the Village of Apple Valley. Ayes - 4 - Nays - 0. Council reviewed the zoning of Winkler's property adjacent to nursery property. This item is scheduled for agendaof August 23, 1972 to adopt new ordinance rezoning it. Councilman Pearsall left at this time. Minutes MOTION: of the Planning Commission meetings of July 12th, 19th and 26th, 1972- received. MOTION: of Garrison, seconded by Hollenbeck, to pass Resolution No. 1972-117, directing the preliminary report for utilities for the Inland property. Ayes - 3 - Nays - 0. MOTION: of Garrison, seconded by Hollenbeck, to pass Resolution No. 1972-118, directing plans and specifications for public improvements for Inland property. Ayes - 3 - Nays - 0. MOTION: of Garrison, no second, to pass Resolution No. 1972-119, setting a public hearing for September 6, 1972 for public improvements on the Inland property. MOTION: of Hollenbeck, seconded by Largen to pass Resolution No. 1972-119, setting a public hearing for September 13, 1972 for public improvements onthe Inland property. Ayes - 2 - Nays - 1 (Garrison). MOTION: of Hollenbeck, seconded by Garrison, to pass Resolution No. 1972~120, approving plans and specifications and ordering bid opening for September 1, 1972, for Inland and Griswold-White properties. Ayes r 3 -'Nays - 0. Public Hearing - Proposed Pennock Avenue & Adjacent Streets. The Mayor called the hearing to order at 8:02 p.m. and read the affidavit of publication. Robert Rosene showed the plan of the proposed street improvement and described the location of the street alignment. It is proposed to be 44 feet wide with a 9-ton base for heavy duty traffic. Costs will be assessed on a front footage basis. Council feels street should be done as soon as possible and is long overdue. The hearing was opened to the public. (Detail of hearing attached to original minutes.) There being no further discussion, the Mayor declared the hearing closed at 8:32 p.m. Public Hearing - Proposed Fairgreen Avenue Street Improvements. The Mayor called the hearing to order at 8:45 p.m. and read the affidavit of publication. He called upon Robert Rosene to introduce the proposal. Mr. Rosene showed the location which is from County Road 42 north on Fairgreen Avenue. He also described the estimated costs. (Detail of public hearing attached to original minutes). There being no further dis- cussion the Mayor declared the hearing closed at 9:15 p.m. MOTION: of Hollenbeck, seconded by Garrison, to approve a Change Order for the street seal coat project in the amount of $1,936.00, providing the patches on Garden View Drive are corrected before the seal coating is done ayes - 3 - Nays - 0. Public Works Report for July- received. MOTION: of Hollenbeck, seconded by Garrison approving Resolution No. 1972-121, approving plans and specifications and directing advertisement for bids to be opened September 1, 1972 on recreation building, lighting for hockey rinks and landscaping as per plans presented for Valley Jr. High - Baldwin Park. Ayes - 3 - Nays ~ 0. MOTION: of Hollenbeck, seconded by Garrison to approve Resolution No. 1972-122, setting a public hearing on the assessment rolls for September 6 1972. Ayes - 3 - Nays - 0. MOTION: of Garrison, seconded by Hollenbeck to approve the tax abatements as per copy attached. Ayes - 3 - Nays - 0. MOTION: of Garrison, seconded by Hollenbeck to approve the trip to Chicago of the Mayor and the Park Director for HUD meeting. Ayes - 3 - Nays - 0. MOTION: of Hollenbeck, seconded by Garrison, to accept the water and sewer portion of Construction Project 71-17, as recommended by the Building Inspector and Engineer. Ayes - 3 - Nays - 0. MOTION: of Hollenbeck, seconded by Garrison, to approve checks number 4616 through 4677 in the amount of $32,772.15 for payment. Ayes - 3 - Nays - 07 A. work session for the Council was set for 6:30 a.m. Tuesday~ August 15~ 1972. MOTION: of Hollenbeck, seconded by Garrison, approving Resolution No. 1972-123 directing preparation of preliminary plans for storm sewers on the PennOck Avenue proposal. Ayes - 3 - Nays - 0. MOTION: of Hollenbeck, seconded by Garrison, approving Resolution No. 1972-124 setting a public hearing for .September 13, 1972 on the West Central Storm Sewer, trunk and lateral, at an estimated cost of $437,000. Ayes - 3 - Nays - 0. Erwin Ulrich requested September 22, 1972 as a date for Comprehensive Plan hearing. MOTION: of Hollenbeck, seconded by Garrison, to adjourn. Unanimously carried. The meeting adjourned at 10:22 p.m. Mayor Clerk