Loading...
HomeMy WebLinkAbout05/04/2005CITY OF APPLE VALLEY PLANNING COMMISSION MINUTES MAY 4, 2005 CALL TO ORDER The City of Apple Valley Planning Commission meeting was called to Order by Chair Karen Edgeton at 7:00 p.m. Members Present: Karen Edgeton, Jeannine Churchill, Jim Hadley, Thomas Helgeson, Tom Melander, Tim Burke and David Schindler Members Absent: None Staff Present: Community Development Director Rick Kelley, City Planner Tom Lovelace, City Attorney Sharon Hills, Associate City Planner Kathy Bodmer, Associate City Planner Margaret Dykes and Assistant City Engineer Colin Manson 2. APPROVAL OF AGENDA Chair Edgeton asked if there were any changes to the Agenda. Community Development Director Rick Kelly stated that Item 4.A. CONSENT ITEMS, Kompelien Setback Variance, should be moved to Item 6.F. LAND USE/ACTION ITEMS. Chair Edgeton called for approval of the amended Agenda. MOTION: Commissioner Hadley moved, seconded by Churchill, to approve the Agenda as amended. The motion carried 7-0. 3. APPROVAL OF MINUTES OF APRIL 20, 2005 Chair Edgeton asked if there were any changes to the minutes. There being none, she called for its approval. MOTION: Commissioner Hadley moved, seconded by Churchill, to approve the minutes of the Apri120, 2005, meeting. The motion carried 6-0, with Commissioner Burke abstaining. 4. CONSENT ITEMS None. 5. PUBLIC HEARINGS A. Hebert CUP -Consideration of a Conditional Use Permit to Operate a Basketball Training Facility Chair Edgeton opened the public hearing with the standard comments. City Planner Kathy Bodmer presented the request from Brian Ammann and Mark Hebert for a conditional use permit (CUP) for operation of a basketball training facility in a 3,000 sq. ft. suite within the Apple Valley Office Warehouse building at 5708 147' Street West. Bodmer reported the CUP is requested to operate a basketball training facility in the Apple Valley Warehouse building located on the southwest corner of 147a' Street and Energy Way. The training facility will be operated in a single 3,000 sq. ft. suite within the 30,000 sq. ft. multiple tenant building. The basketball training facility would be located in Suite 110, which is on the east end of the building. No changes to the building or the site are requested in conjunction with this CUP request. Bodmer reported the applicant states that the facility will provide training for 6-8 students at a time, with a maximum of 15 students in the facility at any one time. During the school year, the majority of instruction will take place from 4:00 pm - 9:00 pm, Monday through Friday. On Saturday and Sunday, the instruction will take place between 9:00 am and 6 pm and in the summer, instruction will occur between 8:00 am and 6:00 pm, Sunday through Saturday. Pazking requirements for this use are based upon the maximum occupancy load of the recreational area and the size of the office azea. The maximum occupancy of the recreation area is 45 people which requires a total of 15 parking spaces. The office area is 752 sq. 8. which requires a total of 5 pazking spaces. Twenty total parking spaces are required for this site. The original pazking calculation based upon the office/warehouse/manufacturing layout would have required 17 spaces for the suite, which is 3 spaces short of the required spaces for this site. Bodmer reported that although the pazking is 3 spaces short, the calculation is based upon maximum capacity and not actual use. In addition, the peak use times for the facility will be opposite of the peak use times of the other uses in the building. The Apple Valley Warehouse building lies within the "BP" (Business Park) zoning district. A CUP must be obtained in order to operate a swim and fitness clubs, exercise and similar commercial recreation facilities when contained within a building in the "BP" zoning district. Bodmer stated that this allows the City to review the proposed facility and place reasonable conditions upon it to ensure it does not negatively impact adjacent properties. Brian Ammann, the applicant, stated that he plans to give individual and small group basketball training at the facility. Ammann stated there will be 10 students or less in the facility at any given time. Chair Edgeton asked if anyone from the public would like to address the C.^....".1:35'.v.^., a:,d if ov, d:ey iuay do Sii at this tuTic. Ken Franzen, 14555 Europa Avenue, stated that he is concerned about the increase in traffic. Franzen resides in a building near the subject site that is for retirees. He is concerned the children will be cutting through his yard to get Yo the proposed basketball training facility. Ammann responded that the facility will have between 2-4 students per hour over a 4 hour period and that students will be at the facility for 1-2 hours. Commissioner Churchill commented that she understand Franzen's concerns, however, with the future Wirsbo Expansion, 147th Street is expected to be punched through which would alleviate some of Franzen's concerns. Chair Edgeton asked staff how much traffic could be handled on 147th Street. Bodmer responded that 147th Street is a collector road and that it can handle 20,000 vehicle trips per day. George Geiger, 14596 Europa Way, is concerned about how he is going to get in and out of his development with the increase in traffic. Geiger commented that the traffic from the nearby Questaz building also adds to the traffic volume. Chair Edgeton asked Bodmer if staff have a concern about traffic in the subject azea. Bodmer stated that staff does not have any concerns. Commissioner Melander stated that the neazby residents need to be aware that the subject site will fill up with some kind of tenant and the situation could actually be a lot worse with a more intensive use other than the basketball training facility. Mark Hebert, the applicant, stated that in his opinion, the basketball training facility will not have any adverse impact on traffic. Bodmer added that an industrial use is also a low traffic generator. Chair Edgeton closed the public hearing with the standard comments. It is the policy of the Planning Commission not to act on an item the same night of its public hearing. However, staff requested action be taken this evening if there are no outstanding issues. Chair Edgeton asked the other members of the Commission if they felt comfortable taking action tonight in light of the comments received by the public. The consensus of the Commission and staff was that this proposal would have no adverse impact on traffic in the area. MOTION: Commissioner Melander moved, seconded by Burke, to recommend approval of a conditional use permit to operate a basketball training facility in the 3,000 sq. ft. Suite 110 of the Apple Valley Wazehouse building at 5708 147th Street West. The motion passed 7-0. B. Cobblestone Pond -Consider Rezoning of a 25 Acre Parcel from "SG" (Sand and Gravel) to "PD" (Planned Development); Subdivision of Land to Create 115 Lots and 2 Outlots, and Site Plan/Building Permit Authorization to Allow for the Construction of 185 Townhomes Chair Edgeton opened the public hearing with the standard comments. Crty Planner Tom ri.^v ~'eiae°v pra°.Sented u e request from Tradition DeVeivp.:.eiti ~vr a rezoning from "SG" (Sand and Gravel) to "PD" (Planned Development), preliminary plat that will subdivide two unplatted parcels into 115 multi-family residential lots and two (2) outlots. The applicant is also requesting site plan building permit authorization to allow for the construction of 185 townhouse dwelling units on approximately 18.14 acres of a 25 acre site. The unplatted parcel is located at the northeast corner of Pilot Knob Road and future 153rd Street West. The Comprehensive Plan 2020 Land Use Map designates the site "MD" (Medium Density Residential, 6-12 units per acre). This request is in conformance with the existing map designation and the goals and policies of the Plan. The net units per acre for this proposal is 10. Lovelace reported the rezoning will require the preparation of an ordinance specific to this project. The rezoning would establish permitted, conditional and accessory uses, as well as area requirements for performance standards for the proposed development project. The site plan indicates the construction of eight 4-unit single loaded townhouse buildings, five 5-unit single loaded townhouse buildings, seven 6-unit single loaded townhouse buildings, nine 6-unit townhouse dwellings, and four 8-unit back-to-back townhouse buildings. Lovelace recommended that the building on Lots 3-7 should be flipped so that the main entrance faces the public street. Lovelace will also be meeting with the City's Fire Marshal to make sure adequate turnarounds are available for emergency vehicles. Commissioner Hadley asked about the view from the private streets in the single - loaded buildings. It appears one would be viewing the garage side of the dwelling. Lovelace stated that is correct: Chair Edgeton asked if decks were on the units. Lovelace stated that there are decks overhanging the garages. Each dwelling unit will have atwo-caz garage and a driveway that should be able to accommodate parking of two vehicles. Seventy-seven on-street and 38 off-street parking spaces will be provided for guests. The number of pazking spaces exceeds the minimum parking requirements established by code. Commissioner Churchill is concerned about the driveways corning off of Private Street E and the lack of additional parking. Lovelace stated that the applicant can elaborate on parking further but the parking does meet the City requirements. Access to the site will be via one way private street and pubic street connection to 153rd Street West. The easterly intersection is proposed to be constructed as a full intersection and the westerly intersection will be a right tum in/out only. Public Street A will ternunate at the site's north boundary line to allow for the further extension of the street as development occurs on the vacant property north of the site.. Access to the dwelling units will be via a combination of pubic and private streets and drive. The eleyatrans u.d'eate t`7!.^, t-~es .^.f exte.^.cr luush iuate.^.als lvr Buie Smgie-ivaded buildings. Brick will be used for the base of the buildings, with the remainder of the building having a composite lap siding finish. Decorative shutters and lintels will accent the windows. Staffwould like to see a greater use of brick or decorative stone. In addition the applicant needs to submit rear and side elevations of the building. 4 The elevations for the back-to-back buildings indicate a variety of exterior finish materials including lap siding, shakes, and ledgerock, with siding being the primary material. The side elevations appear to be bland and monotonous. There is trim around the windows but it does not appeaz to be providing enough relief. Staff recommended the elevations be revised to offer more material variety. The Natural Resources Coordinator has reviewed the preliminary landscape plans and his comments are included in a memo to the Commission. The landscape plan should be revised per the Coordinator's comments. A comprehensive network of internal sidewalks are proposed for this site. The plan indicates connections to the pathway along 153aa Street West, but none to Pilot Knob Road. Sidewalk connections should be made to the pathway to the future pathway and a sidewalk should be installed along the east side of Public Street A. Lovelace reported several retaining walls are proposed to be constructed throughout the site. The applicant will need to indicate the height and type of walls. The Assistant City Engineer has reviewed the grading and utility plans and his comments were included in a memo to the Commission. Chair Edgeton asked if this project is outside of the design guidelines of Cobblestone Lake. Lovelace responded that it is not within the planned development of Cobblestone Lake, although it has the same developers. Some standards will remain the same as the Cobblestone Lake planned development such as not using vinyl siding, some of the setbacks, etc. Edgeton questioned why the applicant is requesting a planned development versus amulti-family residential zoning district. Lovelace responded a planned development will give the developer more flexibility, and, in addition, the proposed plan might not meet the multi-family zoning district criteria. Molly Bruenig, representing the applicant, stated that the reasons the driveways are coming off of the private streets is because they would like the focus of the units to be on the open area, the park, and the main public street. Commissioner Schindler stated that while he is normally not in favor of the garages facing the private street, he can see where in this particulaz plan it might not be a bad idea in order to give a better view for the residents along 153rd Street. Chair Edgeton stated that she is concerned that the elevations on the back-to-back units seem so garage prominent. Bruenig stated that the gazages might not appear so prominent once the colored renderings aze available. Commissioner Hadley .,...,,..a...a a, a.a., maim ....aa ~ aaaJe aTaueaa a.aaaaacwa. Biucilig Sa&~cu wad uacy wua continue working with Pulte Homes to add more variation of materials. Rob Wachholz explained the building elevations in more detail to address some of the Commission's concerns. The Commission did not have any issues with the elevations of the single-loaded dwelling units. Commissioner Churchill asked if the single-loaded units had a back entrance for guest to enter. Wachholz stated that guest can enter only through the front entrance and that sidewalk connections have been made to accommodate front entrances. Commissioner Churchill asked if any thought was given to underground parking, particulazly along 153`d Street. Wachholz stated that it would take a higher density building in order to make underground parking cost effective. Commissioner Melander asked how long the gravel operations will continue once these units are built and occupied. Wachholz stated that the gravel operations are rapidly approaching finish and the operations won't pose a nuisance with this development. Lovelace added that gravel mining operations should cease once the reconstruction of Pilot Knob Road is complete. Chair Edgeton asked if anyone from the public would like to address the Commission, and if so, they may do so at this time. No comments were received from the public. It is the policy of the Planning Commission not to act on an item the same night as its public hearing. Lovelace reported that staff will continue working with the applicant on the issues brought forth by the Commission and public. C. Cobblestone Lake 5`h Addition -Consider Rezoning of a 3.6 Acre Parcel from "A" (Agricultural) to "PD" (Planned Development), Subdivision of Land to Create 7 Lots and 1 Outlot, and Site Plan/Building Permit Authorization to Al-ow for the Construction of 30 Townhomes Chair Edgeton opened the public hearing with the standard comments. City Planner Tom Lovelace presented the request from Tradition Development for a Comprehensive Plan Land Use Map amendment from the current designation "P" (Institutional) to a "MD" (Medium Density ResidentiaU6-12 units per acre) designation, a rezoning from "A" (Agricultural) to "PD-703/zone 3" (Planned Development. The applicant is also requesting preliminary plat that will create 71ots and 1 outlot, and. site plan building permit authorization to allow for the construction of 30 townhouse dwelling units on approximately 2.97 acres of a 3.55 acre parcel. The unplatted parcel is located at the southeast corner of Eagle Bay Drive and old Dodd Boulevazd. The Comprehensive Plan Land Use Map currently designates this proposed development site "P" (Park), which was intended for park and open space purposes. In 2001, this property's designation was changed form "NS" (Neighborhood Service) to "P" (Pazii~ wiYri i'ne intention that this parcel would be combined with the Apple Valley East Pazk, an 11.6 acre public park. Lovelace reported the applicant has had a change of heart and now feels that the proper use for the property would be medium density residential. Lovelace reported that dedication of this site for park purposes was not part of the park dedication requirements for Cobblestone Lake. That will be satisfied through the dedication of land adjacent to Cobblestone Lake Pond. The applicant is requesting a rezoning of the property from "A" (Agricultural) to "PD 703/zone 3" (Planned Development) which allows for multi-family townhomes as a permitted use. This planned development is part of the Cobblestone Lake development and this project would be subject to the area design standards and requirements set forth in this planned development. Lovelace reported that the proposed development will have some difficulty meeting some of the requirements in Zone 3. In order to meet the requirements, either the proposed development plans will have to be changed or the planned development amended. Lovelace reported the site is currently an unplatted parcel. The applicant is proposing to plat the 3.55 acre parcel into 71ots and 1 outlot. Six lots will vary in size from 6,180 sq. ft. to 9,420 sq. ft. for the construction of one 4-unit, four 5-unit, and one 6-unit townhouse buildings. The remaining lot; Lot 7, will be used for a variety ofpurposes that include common open space, guest parking spaces, and private streets/drives. The density for this project will be 10 dwelling units per acre. The plan identifies an outlot (outlot A) in the southwest corner of the site. The petitioner has not indicated what use this outlot is intended for and staff is concerned that it does not appear that it has the ability to be replatted for development. Lovelace is recommending that the outlot be incorporated into Lot 7. Access to the site will be via two private street connections to 153rd Street West. The most northerly intersection ifproposed to be constructed as a full intersection, which will require the removal of an existing concrete median on 153`d Street West. The south intersection will be a right turn in/out only. Access to the individual dwelling units will be via a 24-feet wide private street, and private drives that will be 20 feet wide. Each dwelling unit will have atwo-car garage and a driveway that should be able to accommodate two vehicles. Both the garage and driveway meet City code. Fifteen guest parking spaces are proposed for the development at a rate of/z space/unit, which is the minimum required. The applicant is proposing a network of internal sidewalks with connection to sidewalks and pathways adjacent to public streets. Several boulder retaining walls are indicated along the northwest property line. The plans do not indicate the height of these walls. Staff has identified several issues that relate to the site plan. They are as follows: • The sq. ft. of land per unit for this proposed development is approximately 4,300 sq. ft. The planned development requires a mixumum of 5,200 sq. ft. of land per unit. This will require a reduction in the number of units proposed. The side yard setbacks between the three south buildings aze 20 feet. The planned development requires a minimum of 25 feet between multiple dwellings. The lots and buildings should be adjusted accordingly. City code requires that pazking adjacent to the curb shall have a minimum distance of 18.5 feet. Revisions should be made to the length of the guest parking spaces. The location of the private drive to serve Lot 1 may end of functioning as a private street. Therefore, it should be increased to 24 feet. The City Engineer has reviewed the grading plan and his comments were included in the Commission's packet. The proposed exterior finish of all six buildings will be lap siding with decorative siding gable ends of the roof. A roof treatment and decorative columns will be used at the entrances of each dwelling unit. A similar decorative column will be used for support for each unit's second floor deck located at the rear of the building. The applicant has also attempted to break up the massing of the buildings through the use of bay windows, decorative sills and headers, windows shutters, and width of lap siding. The front elevation will have a small cover stoop and roof gables to break up the front elevation. The rear elevation has some minor undulating in an effort to break up the massing. Staff has identified several elevation issues that related to the planned development. They are: • The planned development requires that the main entrance to the primary dwelling unit shall face the street. The main entrance of all buildings (except Lot 1) have the main entrance on the opposite side of the street or drive. In addition, there is not an outside entrance from the reaz of the units. • The planned development has a maximum height of 35 feet for buildings constructed in Zone 3. Staff is unable to determine the height of the buildings. • The planned development prohibits the use of vinyl, steel, and aluminum as an exterior finish material. The applicant will need to identify the exterior finish material. Lovelace is also recommending that the applicant seriously consider adding brick or stone as an exterior finish material in an effort to add more variety to the buildings. The Natural Resources Coordinator has reviewed the preliminary landscape plans and his comments are included in a memo to the Commission. The applicant should make the revisions included in the Coordinator's memo. Chair Edgeton stated that her main concern is that the entrance to the primary dwelling units does not face the street as stipulated in the planned development. Lovelace responded that most of the units do face a public or private street and that the ordinance does not distinguish between the two. Lovelace stated that the units aze focused more on the green space and open areas. Edgeton responded that she does not feel that this meets the spirit and intent of the ordinance. Rob Wachholz, representing the applicant, commented that if the units were flipped around where the main entrance faces the street, the neighboring residents in Cobblestone Lake would be looking at the garage side of the dwelling unit. Edgeton asked if this pazcel is part of the Cobblestone Lake development. Lovelace stated that it is owned by Tradition but was not part of the original plat. Commissioner Churchill stated that this design does not meet the requirements of the planned develop and she is concerned about incorporating it into the existing planned development. Lovelace stated that in order for this to fit into the existing "PD 703/zone 3", two or three units would have to be eliminated and the units would have to have front and reaz entrances. Commissioner Churchill asked Wachholz if there was any guest parking. Wachholz pointed out small pockets of guest parking on the plan. Commissioner Schindler questioned if this might be a project to consider underground pazking. Wachholz stated that the project would have to be more dense in order for underground parking to be an option. Relative to changing the ordinance, Commissioner Schindler stated that. he would not feel comfortable changing the ordinance to meet one project, particulazly considering the amount of time that staff, the Commission, Council, and developer spent developing the ordinance. Chair Edgeton and Commissioner Churchill concurred. Chair Edgeton suggested staff determine what zoning district this project would fit in and report back to the Commission. Chair Edgeton asked if anyone from the public would like to address the Commission, and if so, they may do so at this time. No comments were received from the public. It is the policy of the Planning Commission not to act on an item the same night as its public hearing. Lovelace reported that staff will continue working with the applicant on the issues brought forth by the Commission and public. 6. LAND USE/ACTION ITEMS A. Wirsbo Expansion -Consider Rezoning of 18.7 Acres from "I-1" (General indiiStriaij t~ ""rI-°o" ~i~ilitipic Faifiiiy Residentiai/i~ 24 un3tS per acrej, Subdivision of 38 Acre Parcel into Two Lots, and Site PlanBuilding Permit Authorization to Allow Construction of a 41,000 sq. ft. Addition to the Existing Wirsbo Building Tabled at the request of the petitioner. B. Goddard School -Consider Subdivision of a 2.62 Acre Parcel Into Two Lots and Site Plan/Building Permit Authorization to Allow for Construction of an 8,200 Daycare Center Associate City Planner Margaret Dykes presented the request from RJ Ryan Constructors/Revestors Group 1, For minor subdivision, site plan review/building permit authorization for a daycaze facility. The applicants are also requesting a building height variance. Dykes reported the property is currently platted as Outlot A, Blomquist 1st Addition. The applicant wishes to subdivide the existing 2.83 acre parcel. The preliminary plat indicates one lot totaling approximately 1.2 acres and one outlot totaling approximately 1.6 acres. A final plat must show two (2) platted lots because Outlot A could not be subdivided and should be platted as a lot. Dykes reported the applicant is proposing an 8,251, sq. ft., one-story daycare facility on the proposed Lot 1. The building and parking areas meet all required setbacks and building coverage limits. The entrance to the building faces south and the building is approximately 190' from the nearest residence to the north. Access to the building is from 147th Street. There aze two driveway cuts to facilitate traffic flow typical of daycare facilities. The double driveway design allows parents to pull up to the curb, drop off their children and turn out onto 147th Street W. Dykes stated the double driveways are slightly offset from the Wal-Mart truck driveway that intersects with 147th Street W. The City's Traffic Consultant has reviewed the proposal and does not have any issues with the spacing of the driveway or the double curb cut because of the low traffic volume generated by the proposed daycare. The trash enclosure has been relocated to the southwest side of the building,. The plan shows that the enclosure will be constructed of the same materials as the building as is required by City Code. A concrete pathway is shown around all sides of the building. However, the site plan does not indicate any connection to the internal sidewalks to the 147th Street W. sidewalk. The plan indicates afour-foot high Cedar fence which will enclose the play area. The Planning Commission had recommended that maintenance-free fencing be used, but due to the cost of the materials, the applicant has chosen to use Cedaz. The City Engineer has reviewed the grading plan and still has some minor outstanding issues that can be easily corrected by the applicant. Acquisition of drainage arid utility easea:aents iur tale Stoaiu Scwcr pipe i5 tl'ic rcSpvnsibiiiiy of iiae applicant. Dykes has informed the applicant that there will be no weekend constmction hours. The Natural Resources Coordinator has reviewed the landscape plan and states that the infiltration azea must be seeded with a native wetland species. In addition, the 10 applicant must confirm that the landscaping materials, excluding sod, equals 2.5% of the cost of the building materials based on Means Construction Data The building elevations show a 29-foot high structure, which is beyond height of 20 feet allowed by the zoning code. The building is composed of brick veneer, which meets the zoning code requirements. The roof is hipped with dormers on both the east and west elevations. The elevations also show the use of vinyl siding on the dormers located on the east and west sides of the building, but still does not show the use any other building materials. Dykes stated that it is staff's opinion that another building material such as stucco would add visual interest to the building and help blend with surrounding commercial and residential structures. A variance was requested to allow an increase the maximum height of the building: The planned development zoning district allows a maximum height of 20 feet. No hardship has been presented, nor in staff s opinion, does one exist. Although there is no hardship, the City could grand a variance based on the reasoning that it is in keeping with surrounding properties. Three other buildings located close to the site are almost the same height as the proposed school. One of the buildings, The Bakken Professional Building, was granted a height variance and is the same height asthe proposed. Commissioner Helgeson asked if the building were on a corner lot, would variation of building material be necessary. Dykes responded that the building meets City code but does not fit into the neighborhood, particularly since there is a nearby residential area. Doug Anderson, representing the applicant, stated that they are resistant to using stucco because of water problems. Chair Edgeton responded that the building material does not have to be stucco. Anderson stated that he was asked by staff only about stucco and didn't know he had the option of using other building materials. Brian Trombley, also representing the applicant, did not agree with the Commission that another building material is necessary. The consensus of the Commission was that if the applicant is not willing to use another material to add variation to the building, they are hard pressed to justify granting a height variance. The applicants stated that they would work with staff to vary the building materials. MOTION: Commissioner Churchill moved, seconded by Helgeson, to recommend approval of a minor subdivision for The Goddard School Addition creating one lot totaling 1.2 acres and one lot totaling 1.6 acres, subject to adhering to applicable city codes and the following conditions: The final plat shall be revised to show two (2) lots and zero (0) outlots. Aii necessary arainage and uriiiry easements per the City's Engineer's memo of April 14, 2005, shall be acquired by the applicant and/or future property owners. Such easements shall be filed with the final plat at Dakota County and proof of acquisition and filing of the final plat shall be submitted to the City. 11 The motion passed 7-0. MOTION: Commnissioner Churchill moved, seconded by Helgeson, to recommend approval of the site plan building permit authorization to allow for the construction of an 8,521 sq. ft. single-story daycaze facility building to be located on the proposed Lot 1, Block 1, The Goddard School Addition as shown on the submitted revised plans, with the exception of the building materials, dated Apri127, 2005, subject to adhering to applicable city codes and the following conditions: • No building permit shall be issued until the final plat for The Goddazd School Addition is filed with Dakota County, and proof of filing is submitted to the City. • There shall be a pedestrian connection from the sidewalk on 147' Street W. to the subject building. • The grading plan shall be revised to comply with the comments in the City Engineer's memo dated Apri127, 2005. • The landscape plan shall be revised to comply with the comments in the Natural Resources Coordinator's memo dated Apri129, 2005. • A building sprinkler system must be installed that conforms to City standards. • The building elevations shall be altered to include a minimum 3' high wainscoting of stone or some other material consistent with sunounding residential uses be applied to all sides of the building. The motion passed 7-0. MOTION: Commissioner Churchill moved, seconded by Helgeson, to recommend approval of a variance increasing the height of the building from the required 210 feet to 29 feet, subject to the petitioner successfully working with City staff on the design and approved by City staff. Although a strict interpretation of the zoning code finds that a sufficient hazdship does not exist, approval of a building height variance will not have a significant impact on adjacent properties, and the granting of the variance is in keeping with the spirit and intent of the zoning ordinance. The approval of the variance is also based on the neighborhood character to counteract the height of the building. The motion passed 7-0. C. Nelson Variance -Front Setback to Allow for Front Deck Associate City Planner Margaret Dykes presented the request from Chad Nelson for a variance to reduce the front yazd setback from the required 30 feet to 18 feet to accommodate a 12'x12' front deck. The subject property is located at 15137 Dunbar Boulevard. The existing one-story house was constructed in 1984, and the house is setback from the front property line. Previous property owners constructed a front yard deck off of the front door. The current homeowner says the deck was nine feet (9') in depth, and photos show the 12 deck had hand railing and it sat 30 inches above grade. The front yard was graded to accommodate the height of the deck. There is no evidence in the City's files that the previous property owner received a building permit for the deck, so staff cannot confirm the dimensions of the deck. The current owners, the Nelsons, purchased the house in 1996. The deck was in violation of the zoning code. Mr. Nelson has already removed the non-conforming deck because he states that some cement pathways located under the deck caused water to seep into the basement of the house. Dykes reported that City code states that all structures, including decks, must meet. the required setbacks listed in the zoning code. Front yard decks may, however, encroach 8 feet into the front setback provided the deck is no higher than 18 inches from grade and there is no hand railing. Mr. Nelson would like to reconstruct a front deck with the same height as the old one, and also put hand railing on it. hi addition, he would like to enlarge the deck to 12'x12' (144 sq. ft.). The deck would exceed allowable encroachment by 4 feet, as well as exceed the height and hand rail requirements. In order to approve a variance, the City must fmd that "special conditions applying to the structures or land in question are particulaz to such property, or immediately adjoining property; do not apply generally to other land or structures in the district; . ..and that the variance will not merely serve as a convenience to the applicant, but is necessary to alleviate demonstrable hazdship or difficulty." Dykes stated that because of the existing grade of the site, the applicant must construct some type of raised entry to the house. Staff would support such a variance request since the existing grade of the front lawn and the location of the front door necessitates some entry higher than 18 inches. In addition, staff would support the use of hand rails since the deck would be 30 inches from grade and hand rails would make the deck safer. Dykes stated that staff does not observe a hardship justifying a vaziance for the dimensions of the proposed deck, though the City's Comprehensive Guide Plan does encourage reinvestment in existing single family residences, and the size of the deck will not adversely affect surrounding properties. Dykes reported that staff review fords that there is a hardship created by the existing grade of the front yard to justify the height and use of hand rails on a front deck. Staff also believes that even though there is no hardship created to justify the 4 foot encroachment into the front yard setback, the Commission does have discretion to approve the variance if it finds that granting the variance would be in keeping with the spirit and intent of the zoning ordinance. MOTION: Commissioner Schindler moved, seconded by Churchill, to recommend approval of a variance at i5 i 37 Dunbar i'sivd., to increase the height of a front deck from the 18 inches up to 30 inches, and the installation of hand rails on the front deck because of the existing grade of the front yazd and the location of the front door. The motion carried 7-0. 13 MOTION: Commissioner Schindler moved, seconded by Melander, to recommend approval of a variance at 15137 Dunbar Blvd., to allow fora 12'x12' front deck to encroach into the front yard setback by 4 feet reducing the front setback from the required 30 feet to 18 feet because the variance is in keeping with the spirit and intent of the zoning ordinance. The front deck shall be in conformance with the plans received in City offices on Apri125, 2005, and comply with all applicable City codes and policies. The motion carried 7-0. D. Lebanon Park and Ride -Consideration of Site Plan/Building Permit Authorization to Allow for the Construction of a Transit Station and 258-space Parking Stalls Community Development Director Rick Kelley presented the request from Dakota County for site plan building permit authorization for a transit station. The station would consist of a 800 sq. ft. building and 258 parking stalls (250 standard stalls and 8 handicapped stalls). The transit station is proposed to be located on the west side of Pilot Knob Road bounded by future 157a' Street on the north and future 158th Street on the south. Kelly reported the transit station will be constructed in conjunction with the reconstruction of Pilot Knob Road from a 2-lane rural highway to a 4-lane urban highway. It is anticipated that bus transit service to the site will be provided by the Minnesota Valley Transit Authority (MVTA), the joint powers transit organization of which Apple Valley is a part of. Actual programming of service is contingent upon funding availability. Kelly reported the potential environmental effects from sand and gravel mining activities on this site were previously evaluated in an overall Environmental Impact Study (EIS) and found to be within the acceptable range of effects. The length of mining activities would be restricted to 2 years and would fall within the guidelines of the Comprehensive Plan. The fmal grades would match the final grades of the adjacent properties which are presently being mined. Kelly stated that staff is recommending approval of this project. Commissioner Schindler asked why there was no landscaping on the east side of the site. Kelly responded that it allows visibility to the transit station. In addition, Pilot Knob Road will be widened to 61anes in the future and the applicant does not want to incur the cost of installing landscaping and then removing it. MOTION: Commissioner Burke moved, seconded by Melander, to recommend approval of site plan building permit authorization for the Pilot Knob Transit Station in accordance with the plans submitted Apri120, 2005, LLsub~~ject to revisions to the Landscape Pian 111 aCCOrdaiiCG Vl~i 1 1G $Ll~',KGJI1Vr1J Vl the 1VTaL~Ar61 RGSOtLree3 Coordinator. The motion carved 7-0. E. Hillcrest Acres, Lot 7 -Consideration of Site Plan/Building Permit Authorization to Allow for the Construction of 3 Commercial Buildings Totaling 39,210 sq. ft. in Building Area on an 8.5 Acre Lot 14 City Planner Tom Lovelace presented the request from New World Enterprises, Ltd., for site plan building permit authorization approval to allow for the construction of two 9,940 sq. ft. buildings and one 19,330 sq. ft. building on an 8.47 acre lot. The site is located at the southeast corner of 1515` Street West and Foliage Avenue and is part of the Hillcrest Acres development. Lovelace reported that access to the site will be via driveways off a private external street located directly adjacent to the north of the site from the Home Depot parking lot, and off Foliage Avenue in the extreme southeast corner of the property. The site will have 207 surface parking spaces. The site has been graded as part of the mass grading for the Hillcrest Acres/Home Depot development. Minimal grading will be needed prior to construction. All necessary municipal utilities are available. The Assistant City Engineer has reviewed the grading and utility plans and has identified some issues along with recommendations to remedy the problems.. These recommendations should be incorporated into the applicant's final grading and utility plans. The proposed exterior materials and features aze incompliance with the planned development ordinance and applicable city codes. The buildings are similar to other existing buildings within the Hillcrest Acres development. The site plan does not indicate the location of any of the buildings mechanicals. Lovelace stated mechanicals need to be identified and properly screened in accordance with city code. The plan indicated an 8' high screen wall for the loading azea n the rear of Building "C". The elevation for this building indicates a 12' high screen wall. Lovelace stated the wall should have a minimum height of 12' and should be constructed of the same exterior finish materials as the building. Lovelace reported that the materials of the three trash enclosures, one for each building, need to be consistent with the architecture of the building with similaz finishes and colors. The landscape plan was reviewed by the City's Natural Resources Coordinator. The applicant should incorporate his recommendations into the site plan. The City's Traffic Consultant reviewed the site plan and has some issues with accessibility and internal circulation. Any approval of this plan would be subject to the incorporating the Traffic Consultant's recommendations into the plan. A 6-foot wide sidewalk is located along the north side of the private east/west street that runs through the development. Lovelace recommended that a pedestrian connection to that sidewalk should be made along the west side of the project's north driveway. 15 The applicant has identified a location for a ground sign at the intersection of the Foliage Avenue and the south drive. The planned development ordinance does not allow for pylon/monument signs for individual lots within this development. Individual signage for the building tenants is generally handled administratively and will have to meet the City's sign code regulations. MOTION: Commissioner Melander moved, seconded by Helgeson, to recommend approval of the site plan building permit authorization for Lot 7, Block 1, HILLCREST ACRES, subject to the following conditions: • Construction shall be in conformance with the site plan dated Mazch 24, 2005, subject to the revisions to traffic accessibility and circulation as indicated in the City's Traffic Consultant's Apri127, 2005 memo. • Construction shall be in conformance with the landscape plan dated April 19, 2005, subject to the revisions as indicated in the City's Natural Resources Coordinator's Apri129, 2005 memo. • Construction shall be in conformance with the grading and utility plans dated Mazch 29, 2005, subject to the revisions as indicated in the City's Assistant Engineer's Apri127, 2005 memo. • The screen wall behind Building "C" shall have a minimum height of 12' and shall be constructed of the same exterior finish materials as the building. • All trash enclosures shall be consistent with the architecture of the building and shall use similar materials, finishes and colors. • All mechanical systems will need to be properly screened in accordance with city code. • A pedestrian connection to the sidewalk located along the north side of the private east/west street that runs through the development shall be made along the west side of the project's north driveway. The motion passed 7-0. F. Kompelien Setback Variance -Consideration of a 5' Front Yard Setback Variance to Allow Construction of a Kitchen Addition Associate City Planner Kathy Bodmer presented the request from Ron and Tan Kompelien for a front yazd setback variance to construct an 8'x20' kitchen addition onto the front of their home. The applicant is requesting a 4' front yazd variance from the 30' front yard setback to construct the kitchen addition 26' from the front property line. Bodmer reported that the Kompelien home was constructed in 1978 and is aone- story Orin Thompson rambler with a flat facade and roofline. The proposed kitchen addition would help to enlarge and update a small 8'x 16' galley kitchen and dining area. The roofline of the addition will have a gable front to help break up the 16 appearance of the roofline. The applicant is also contemplating a change to the design of the front entryway in conjunction with the kitchen expansion. Bodmer reported the kitchen addition is consistent with the goals and policies of the comprehensive plan that encourages residents to make improvements to their homes so that they can continue to live in them. Also, improving the appearance of entryways and expanding the size of the original galley kitchen has been encouraged as a way to help update the City's existing housing stock. The proposed variance is consistent with the City's goals and similar front additions have been approved by the City. In addition, the variance will result in only a 4' encroachment into the setback area. In order to approve a variance, the City must fmd that "special conditions applying to the structures or land in question are particular to such property, or immediately adjoining property; do not apply generally to other land or structures in the district; . ..and that the variance will not merely serve as a convenience to the applicant, but is necessary to alleviate demonstrable hardship or difficulty." Staff finds that the variance meets the goals of the comprehensive plan by allowing the owners to enlarge a small kitchen and to enhance the front entryway of the home. In addition, the variance will have no negative impacts on adjacent properties. MOTION: Commissioner Churchill moved, seconded by Helgeson, to recommend approval of a front yard setback variance to construct an 8'x20' kitchen addition based on the fact that the addition meets the goals of the comprehensive plan, there will be no negative impacts to the adjacent, and the home improvement meets goal of the City's Comprehensive Plan that encourages residents to make home improvements. The motion carried 7-0. OTHER BUSINESS None. 8. ADJOURNMENT MOTION: Commissioner Melander moved, seconded by Schindler, to adjourn the meeting at 10:03 p.m. 17