Loading...
HomeMy WebLinkAbout10/06/2021 Agenda Packet M eeting L ocation: M unicipal Center 7100 147th Street West Apple Valley, M innesota 55124 Planning Commission meetings have resumed at the Municipal C enter and are open to the public with physical distancing restrictions. Attendee procedures and access inf ormation are posted on the C ity's website and include virtual participation opportunities. October 6, 2021 PLA N N IN G C O MMISSIO N T EN TAT IVE A G EN D A 7:00 P M 1.Call to Order A.Planning Commissioners will be attending either in-person or virtually. A roll-call will be taken. 2.Approve Agenda 3.Approve Consent Agenda Items Consent Agenda Items are considered routine and will be enacted with a single motion, without discussion, unless a commissioner or citizen requests to have any item separately considered. It will then be moved to the land use/action items for consideration. A.Approve Minutes of September 1, 2021, Regular Meeting. 4.Public Hearings 5.Land Use / Action Items A.Eagle Brook Church - PC21-25-B C onsider Site Plan/Building Permit Authorization to Allow for 58,139-Sq. Ft. Building on 13.86-Acre Lot LO C AT IO N: 14960 Florence Trail PET IT IO N ER: Eagle Brook Church and Menard, Inc. B.Whaley Detached Garage Variances - PC21-26-V 1. C onsider height variance to increase the height of a detached garage from a maximum of 16' to 21' (5' variance). 2. C onsider side yard setback variance to reduce the side yard setback for a detached garage from 20' to 11' (9' variance). Location: 12724 Denmark Ave Petitioner: Matt Whaley 6.Other Business A.Review of Upcoming Schedule and Other Updates Planning Commission - Wednesday, October 20, 2021 - 7:00 p.m. Planning Commission - Wednesday, November 3, 2021 - 7:00 p.m. C ity Council - T hursday, October 14, 2021 - 7:00 p.m. C ity Council - T hursday, October 28, 2021 - 7:00 p.m. 7.Adjourn Regular meetings are broadcast, live, on C harter C ommunications C able C hannel 180 and on the C ity's website at www.cityof applevalley.org I T E M: P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:Special Notification Description: Planning Commission meetings have resumed at the Municipal Center and are open to the public with physical distancing restrictions. Attendee procedures and access information are posted on the City's website and include virtual participation opportunities. S taff Contact: Carol Kovacic, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: Please let us know you have joined us by either signing at the door or requesting to be an attendee on-line. S UM M ARY: Note: Planning C ommission meetings have resumed at the Municipal C enter and are open to the public with physical distancing restrictions. B AC K G RO UND: N/A B UD G E T I M PAC T: N/A I T E M: 1.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:Call to Order Description: P lanning Commissioners will be attending either in-person or virtually. A roll-call will be taken. S taff Contact: Carol Kovacic, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: N/A S UM M ARY: During the C O VID-19 Pandemic, the Council C hambers in the Apple Valley Municipal Building has been set-up to allow for the Planning C ommissioners to attend meetings either in-person (observing social distancing in accordance with Emergency Executive Order 20-81) or virtually (via GoToMeeting). A roll-call will be taken. B AC K G RO UND: N/A B UD G E T I M PAC T: N/A I T E M: 3.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:Consent A genda Description: A pprove Minutes of September 1, 2021, Regular Meeting. S taff Contact: Carol Kovacic, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: Approve minutes of regular meeting of September 1, 2021. S UM M ARY: T he minutes of the last regular Planning Commission meeting is attached for your review and approval. B AC K G RO UND: State statute requires the creation and preservation of meeting minutes which document the official actions and proceedings of public governing bodies. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Minutes I T E M: 5.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:L and Use / Action I tems Description: E agle B rook Church - P C21-25-B Consider Site P lan/Building P ermit A uthorization to A llow for 58,139-Sq. Ft. B uilding on 13.86- A cre L ot S taff Contact: Thomas L ovelace, City Planner Department / Division: Community Development Department Applicant: E agle Brook Church and Menard, I nc. P roject Number: P C21-25-B Applicant Date: 9/8/2021 60 Days: 11/2/2021 120 Days: 1/1/2022 AC T I O N RE Q UE S T E D: If the Planning C ommission concurs staff is recommending approval of the site plan/building permit authorization to allow for construction of 58,139-sq. ft. building and 585-space parking lot on Lot 1, Block 3, Fischer Market Place subject to the following conditions: 1. Construction shall occur in conformance with the site plan dated September 7, 2021, including parking lot paving and a non-surmountable concrete curb and gutter around the entire perimeter with a minimum driveway approach radius of 15' at each public street, and a valley gutter at the edge of the street pavement; subject to moving the private driveway intersection along Flagstaff Avenue approximately 65 south from its location as shown on the plan. 2. Public improvements to the Flagstaff Avenue shall be made in accordance to the C ity's Engineer's recommendations and shall be paid for by the applicant. 3. Any trees located in the Flagstaff Avenue/private driveway sight triangles shall be removed. 4. Construction shall occur in conformance with the landscape plans dated September 7, 2021, (including sodded/seeded public boulevard area up to each street curbline); subject to submission of a detailed landscape planting price list for verification of the City’s 2½% landscaping requirement at the time of building permit application and the changes recommended by the C ity's Natural Resources C oordinator contained in the staff memo dated September 30, 2021. 5. A bike rack shall be located in front of the building at a location that will not impede use of any sidewalk. 6. Construction shall occur in conformance with the elevation plan dated September 7, 2021. 7. T he trash storage area shall be completely screened by a wall or enclosed in a building and any enclosure shall be architecturally compatible with the building's exterior finish. 8. All necessary mechanical protrusions visible to the exterior shall be screened or handled in accordance with Section 155.346 (3) (a) (b) of the city code. 9. Site grading shall occur in conformance with a N atural Resources Management Plan (N RMP) which shall include a final grading plan to be submitted for review and approval by the City Engineer; subject to the applicant submitting a copy of the General Storm Water Permit approval from the Minnesota Pollution C ontrol A gency pursuant to Minnesota Rules 7100.1000 - 7100.1100 regarding the State N P D ES Permit prior to commencement of grading activity. 10. All filtration areas shall be constructed in conformance with the City standards. 11. T he property owner shall execute a maintenance agreement or other suitable agreement to be filed with the deed that ensures the perpetual maintenance of any onsite filtration areas. 12. Utility construction shall occur in conformance with a final utility plan to be submitted for C ity review and approval prior to issuance of any City permits. 13. Construction shall be in conformance with the lighting plan dated September 7, 2021. 14. Approval of a signage plan is not included with this site plan and building permit authorization. A separate application and signage plan in conformance with the sign regulations must be submitted for review and approval to the C ity prior to the erection of any signs. S UM M ARY: Eagle Brook C hurch and Menard, Inc. has submitted an application requesting approval of site plan/building permit authorization to allow for the construction of a 58,139-sq. ft. church and 585 surface parking spaces on a 13.86-acre lot located at 14960 Florence Trail. T he property is the location of the former Menard's building supply store. T he applicant is proposing to remove a 102,657 sq. ft. of the existing 160,796-sq. ft. building and use what remains for a 58,139-sq. ft. church and will add parking in the former outdoor yard area, north and east of the building. All but 42 of the existing 453 surface parking spaces, parking islands and cart corrals along the south side of the site will be removed; as well as the buildings, concrete surface, racking and generator in the lumberyard area will be removed. T he fence around the perimeter of the lumberyard. T he plans indicate that the applicant will try to save any existing trees located along the perimeter of the site that do not conflict with their redevelopment plans. B AC K G RO UND: Comprehensiv e P lan: T he C ity's 2040 C omprehensive Plan currently designates the property "C " (C ommercial). T he C ommercial designation includes a wide variety of retail, office, and service uses that vary in intensity and off-site impacts. T he C ity uses the zoning ordinance to regulate the intensity and characteristics of development. Lower-intensity commercial districts include Limited Business, Neighborhood C ommercial, General Business and Retail. Religious centers are permitted uses in Limited Business zoning district and religious facilities are permitted in the Retail Business zoning district. Zoning: T he property is zoned "PD -646/zone 1" (Planned Development). Church, religious facilities and religious centers are permitted uses within zone 1 of the planned development. Site P lan: T he site is the current location of an 160,796-sq. ft. vacant Menards retail store, 453- space surface parking lot and 3.8-acre outdoor lumberyard. T he applicant is proposing to remove all but 42 parking spaces, the east 102,657 sq. ft. of the existing building, the lumberyard, and perimeter fencing surrounding the lumberyard. T hey will use the remaining 58,139 sq. ft. of the existing building for their church, reconfigure the south parking lot that will include 219 spaces, add 186 parking spaces east of the proposed building and 180 spaces north of the building. Vehicular access to the site will via the existing drive approach along Florence Trail and a new driveway along Flagstaff Avenue. T he new driveway shall be placed at a location acceptable to the C ity. T he applicant shall also be required to pay for modifications to the Flagstaff Avenue that shall include adding a northbound left/through lane from Florence Trail to the existing left turn lane at 147th Street West and adding a southbound right-turn lane at the driveway. Access will continue between the proposed church and adjacent Sam's C lub to the west. Minor modifications will be made to make a smoother transition between the two properties. T he site plan shows a "trash storage area" at the northwest corner of the building. T he plans do not show how the area will be screened. All waste material, debris, refuse or garbage shall be kept in an enclosed building or enclosed within a container. T he container shall be completely screened by a wall or an equivalent visual screen. T he screen or enclosed building shall be architecturally compatible with the principal building it serves. A bike rack shall be installed in front of the building. Grading P lan: Significant grading will be done to prepare the site for development. T his will include the excavation of three filtration basins in the south parking area, two basins along the north side of the property and one filtration swale along the east side of the property. T he C ity Engineer has reviewed the grading plans and his comments are included in his attached memo. Site grading shall occur in conformance with a final grading plan to be submitted for review and approval prior to issuance of any C ity permits for the proposed development. Elev ation Drawings: T he building elevations will have an exterior finish consisting of face brick, precast, prefinished architectural panel system. Staff has no issues with the proposed elevations. Roof P lan: T he applicant has submitted a roof plan that shows the location of the rooftop units and exhaust fixtures. All rooftop mechanical equipment shall be fully screened by either a parapet wall along the edge of the building or by a screen immediately surrounding such equipment. T he height of the parapet wall or screen shall be at least the height of the equipment. Parapet walls must be an extension of the primary building materials comprising the outside walls of the building; screens must be constructed of durable, low-maintenance materials and be either a light, neutral color or the same color as the primary building materials of the outside walls. Rooftop equipment shall be set back from the edge of the roof along the front building face a minimum of one times the equipment height. Landscape P lan: T he applicant has submitted a preliminary landscape plan that shows the size, location, quantity, caliper, species of all plant materials, and ground cover. T he plan has been reviewed by the C ity's Natural Resources Coordinator and she is recommending the following: Provide additional detail on the proposed stormwater seed mix. T he detail shall consider a minimum of a three year establishment period per the specific seed mix specifications. Regular ongoing maintenance such as weeding, spot spraying, and inter- planting are likely required to ensure the longevity and health of the basins functionality long-term. T he erosion control blanket does not extend fully north on the basin to the east (swale filtration basin 3). T he tree quantities shown on the plan do not match Plant Schedule. Substitute a Black Hills Spruce variety for the proposed Colorado Spruce due to common fungal problems with the Colorado Spruce species. Diversify the tree plantings to follow the 30-20-10 rule. (T he rule suggests an urban tree population should include no more than 10% of any one species, 20% of any one genus, or 30% of any family.) Provide exterior foundation planting plans. T he City encourages planting a variety of native species (not cultivars) in the schedule. Plaza Area around the building requires additional detail and plantings. T he applicant's plans indicate that they will be saving 95 existing trees onsite, which includes trees directly adjacent to the proposed Flagstaff Avenue driveway. T he City Engineer has recommended that 30-foot site triangles be established at this location. A site triangle is a portion of land at intersections in which nothing is erected, placed, planted, or allowed to grow that will limit or obstruct the sight distance of drivers entering or leaving the intersection. T his will require the removal of any existing trees within the intersection's sight triangles. Av ailability of Municipal Utilities: Sanitary sewer and watermain line to serve the building are currently available onsite. C onnections will be made from the existing lines to the proposed building. Several stormwater filtration areas are being proposed on the site which will require significant storm sewer construction. To ensure the proper construction and ongoing maintenance of these areas, the C ity will require the execution of a construction and maintenance agreement between the C ity and the developer. Utility construction shall occur in conformance with a final utility plan to be submitted for review and approval prior to issuance of any City permits. Street Classifications/Accesses/Circulation: Primary access to the site will be via an existing driveway along Florence Trail and a new driveway along Flagstaff Avenue. A secondary access will be provided via a cross access and parking agreement with Sam's Club, who has a retail store adjacent to west of the site. No access along the north side of property will be allowed off 147th Street West. Per the request of the City, the applicant has prepared a traffic impact study. T he study's conclusions and recommendations are included in Section 7.0 on pages 7-1 and 7-2. T he City's traffic consultant and Engineer have reviewed the traffic study and their comments are included in the attached memo. T he proposed traffic mitigation should adequately address any potential changes in traffic generated by the proposed change in use. T hese mitigation measures include the following changes to the proposed access on Flagstaff Avenue: Provide two exiting lanes and one entering lane. Add a northbound left-turn lane on Flagstaff Avenue. Add a southbound right-turn lane. T he mitigation measures are shown on the applicant's plans. T he C ity Engineer has reviewed the mitigation measures and is recommending some minor modifications, which are outlined in his attached memo. P edestrian Access: A sidewalk from the building to Florence Trail currently exists. T he applicant is proposing a sidewalk along the north side of the Flagstaff Avenue driveway that will connect to the existing sidewalk along the west side of the street. A sidewalk extension should be considered from the building to the 147th Street West. Lighting P lan: In commercial and industrial areas, any light or combination of lights that cast light on any adjacent commercial or industrial property shall not exceed one foot candle as measured at the property line. Also, any lighting used to illuminate an off-street parking area or sign shall be arranged so as to deflect light away from any adjoining residential zone or from the public streets. T he submitted lighting plan shows that the development will be in compliance with the C ity's lighting requirements. Signs: T he submitted plans show building signage and a monument sign north of the Flagstaff Avenue driveway intersection. No signage details have been included with their submission. Approval of the site plan/building permit authorization does not constitute sign approval. A separate sign application will need to be submitted and approved prior to erecting any signs. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Memo L ocation Map Comp Plan Map Z oning Map Existing Conditions Demolition Plan Site P lan Grading P lan Utilities Plan Utilities Plan L andscaping Plan Elevations F loor Plan L ighting Plan CITY OF MEMO Public Works TO: Tom Lovelace, Planner FROM: Brandon S. Anderson, PE, City Engineer DATE: September 30, 2021 SUBJECT: Eagle Brook Church Site Plan Review per plans dated 09/07/2021 General 1. All work and infrastructure within public easements or right of way shall be to City standards. 2. Provide a narrative of how the buildings will be constructed and any impacts. The narrative shall include the following: a. Shoring (if applicable) b. Material Storage. c. Haul routes to and from the site. d. Phasing 3. No construction work shall begin prior to a preconstruction meeting conference with a Public works and a Building Inspections representative. 4. Public Work Department (952-953-2400) shall be notified a minimum of 48 hours for any required water main shut downs and/or connections. 5. City of Apple Valley Water Department shall operate all valves on public owned mains and valves connecting private lines to public owned mains. 6. Plans should include reference to all used City of Apple Valley standard detail plates. All Standard detail plates should be shown in the details section of the plans. Permits 7. Provide a copy of the executed Minnesota Department of Health, Minnesota Pollution Control Agency, Met Council, Department of Labor and any other required permits prior to construction. 8. Department of Labor and Industry (DOLI) shall review private utilities. 9. A right of way permit will be required for all work within public easements or right of way. 10. A Natural Resource Management Permit (NRMP) will be required prior to any land disturbing activity commences. 11. Since the site will be disturbing more than 1 acre and creating more than 1 acre of new impervious. The applicant will be subject to the requirements of the State NPDES Construction Storm water Permit. The applicant must provide proof of permit. 12. A public infrastructure project is anticipated for the proposed improvements on Flagstaff Avenue. Plans and specifications shall be completed by the City of Apple Valley. A private installation agreement may be necessary for construction of public infrastructure by developer. 13. City Ordinance 152.55(B): Maintenance agreement for the proposed storm water management areas will be required and must be recorded. Site 14. Include Auto turn drawing for service and emergency vehicles entering and leaving the site. 15. Show the location of manholes and gate valves and hydrants on the site plan. 16. Show existing easements on the site/grading and utlity plans. Permanent structures are not allowed in drainage and utility easements or private storm water facilities. 17. Show 30’ site line triangles at the main entrance access to Flagstaff to ensure additional trees are not required to be removed for site lines. 18. Signage Plan and details should be included on site plan (i.e. pedestrian crossing signage, ADA, directional signs, no parking, buffer/storm water signs, no snow storage in storm water basins, etc…) for review 19. See attached layout for proposed public improvements required for traffic mitigation (access) on Flagstaff Avenue. • The proposed access drive to Flagstaff shall be shifted +65’ to the south to provide approx. 400’ distance from 147th Street. • The turn lane length shall be 150’ plus 8:1 taper to tie into Flagstaff curb line. • Driveway Apron shall be per City of Apple Valley standard detail plate STR- 5. 20. See attached Memo from SRF regarding the review of Traffic Impact Study. Grading & Drainage Plan 21. Final Grading Plans shall be reviewed and approved by City Engineer. 22. Provide the overall site composite Curve Number (CN) along with the impervious % on the area tabulation. 23. Proposed filtration basins shall be privately owned and maintained. A filtration basin Construction and Maintenance Agreement will be required. 24. Label the Normal Water Elevation for each filtration basin. 25. Provide a cross section of each proposed filtration basin, include depth and filter media. 26. Slopes on grading plan shall be a minimum of 2.0%. 27. The proposed storm sewer should be bold and stand out on the drainage plan. 28. Provide spot elevations for the filtration basin swale. 29. Filtration basins need to be named individually in accordance with SWMP with the following naming convention: • WVR P-100.1 – WVR P-100.5 Storm Sewer 30. Final Storm water Management Plan shall be reviewed and approved by City Engineer. 31. Final locations and sizes of Storm Sewer shall be reviewed with the final construction plans and approved by City Engineer. 32. Provide storm sewer calculations for storm water requirements. (Rational method including Hydraulic grade lines). 33. Provide a detail of all outlet structures. • Additional underdrain valves and valve boxes per Dakota County SWCD details will be required in the filtration basins. • Reference Dakota County SWCD Details were applicable 34. Provide pretreatment device/s, such as a SAFL Baffle or approved equal and sump prior to discharging into the public storm sewer in an additional separate MH. Sump structures as shown in City “Catch Basin Manhole with Sump” detail STO-5S. Any sumps shall be privately maintained and routinely cleaned as the accumulated sediment will be from the private parking lots and roadways. 35. Show the HWL, NWL and pond bottom elevations on the storm sewer plan. 36. Label the basins and swale on the storm sewer plan. 37. Verify the elevation of the west invert from the swale to basin #3. 38. Number the structures for the storm sewer. These should correlate with the numbers provided in the storm sewer calculations. Sanitary Sewer and Water main 39. Final locations and sizes of Sanitary Sewer and Water main shall be reviewed with the final construction plans and approved by City Engineer. 40. All water mains located within right of way and public easements for purposes of connection to public infrastructure shall be ductile iron pipe and meet all City standards. 41. Remove all unused service stubs back to the main 42. Identify Irrigation service location(s) if applicable per SER-4. 43. Provide additional drawing showing required hydrant coverage for site. 44. Domestic water and fire service shall be split outside the existing building and the valves shall be located 1.5 times the height of the building away from the building or placed in location readily accessible per City of Apple Valley standard detail plate SER-6. 45. No water main can be located within filtration basin area. The drainage swale along the east side of parking may need to be regraded to separate water main from swale bottom. Landscape and Natural Resources 46. Sheet 260.LP: Provide detail on the proposed stormwater seed mix. The detail shall consider a minimum of a three year establishment period per the specific seed mix specifications. Regular ongoing maintenance such as weeding, spot spraying, and inter-planting are likely required to ensure the longevity and health of the basins functionality long-term. 47. Sheet 233.SW: Erosion control blanket does not extend fully north on the basin to the east (swale filtration basin 3) 48. Sheet 260.LP: Quantities of trees shown on plan to not match Plant Schedule. • Recommend substituting a Black Hills Spruce variety for the proposed Colorado Spruce due to common fungal problems with Colorado Spruce. • Diversify the tree plantings to follow the 30-20-10 rule. (The rule suggests an urban tree population should include no more than 10% of any one species, 20% of any one genus, or 30% of any family.) 49. Provide exterior foundation planting plans. The City encourages planting a variety of native species (not cultivars) in the schedule. 50. Plaza Area around the building requires additional detail and plantings. Review Summary www.srfconsulting.com 3701 Wayzata Boulevard, Suite 100 | Minneapolis, MN 55416-3791 | 763.475.0010 Fax: 1.866.440.6364 An Equal Opportunity Employer SRF No. 14868.00 To: Brandon Anderson, PE, City Engineer City of Apple Valley From: Tom Sachi, PE, Associate Brent Clark, PE, Senior Engineer Date: July 28, 2021 Subject: Review of Traffic Impact Study for Apple Valley Eagle Brook Church Introduction As requested, SRF has completed a review of the Traffic Impact Study – Apple Valley Eagle Brook Church document, dated July 23, 2021 completed by Stantec Consulting Services. The proposed development is located in the northwest quadrant of the Flagstaff Avenue and Florence Trail intersection in the City of Apple Valley. A review of the memorandum identified the following questions and comments for consideration. Review Summary Based on our review, the following items were identified: Site Trip Generation/Distribution 1. The data collected at an existing Eagle Brook Church for entering/exiting percentages appear reasonable based on SRF’s historical data collection efforts at other churches. 2. The vehicle occupancy data provided by the church appears reasonable. The attendance projections represent a conservative estimate (approximately 1,000 attendees during peak service) 3. The peak hour trip generation using the Institute of Transportation Engineers Trip Generation Manual, 10th Edition is accurate for the previous land use. Note that the Menards trip generation (previous land use) is only based on four (4) studies. 4. The time of day trip generation reductions for the previous land use are accurate. 5. The directional distribution percentages are reasonable for the previous land use and the approach for the proposed land use is accurate. 6. The volume routing appears to be accurate. An assumption of 10 percent of church attendees entering/exiting for the Sam’s Club parking lot appears to the accurate. 7. The proposed land use is expected to generate an additional 119 trips during the 8:15 to 9:15 a.m. peak hour, 205 trips during the 10:00 to 11:00 a.m. peak hour, and 591 fewer trips during the 12:00 to 1:00 p.m. peak hour. 8. The background growth rate of two (2) percent is consistent with historical rates. Review of Traffic Impact Study for Apple Valley Eagle Brook Church July 28, 2021 Page 2 Traffic Impact Analysis 9. PHF values were updated accordingly for the entering/exiting movements associated with the development. a. 8:15 to 9:15 a.m. – 0.46 for entering trips b. 10:00 to 11:00 a.m. – 0.34 for entering trips, 0.54 for exiting trips c. 12:00 to 1:00 p.m. – 0.48 for exiting trips 10. The traffic operations analysis results from the Highway Capacity Manual appear to be accurate with the updated PHF information. 11. The queues identified in the analysis results are provided from a SimTraffic queuing report and appear to be accurate. Conclusions and Recommendations 12. A review of the proposed site plan geometrics indicate the recommendation of a southbound right-turn lane along Flagstaff Avenue at the main access location in both site plan scenarios. This is determined to be safety benefit for the peak entering volumes. 13. The other proposed geometrics appear to be adequate with the updated traffic analysis information. i. For Option B1, adequate No Turn and Do Not Enter signing will be necessary to prohibit motorists from entering the site at both access driveways. However, a median may not be feasible to allow for vehicles to exit the driveway via left-turns. Additionally, Option B1 would likely require exiting vehicles to exit through the newly developed northbound left- turn lane, which can present safety issues. 14. The turn lane design along Flagstaff Avenue information appears to be accurate based on the 95th percentile queueing results and the LRRB Turn Lane Design Criteria presented in the report. 15. The internal queues (max 95th queue identified was approximately 150 feet) as a result of the proposed development should be noted to prohibit access from drive aisles during peak exiting times. This could be further resolved within the future operations plan for the Church. SS>>>>>>>>>>>>>>>>>>>>>>>>>>S>SS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>S>> >DD>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>DDDDDDl l l l l llllllllllllll l lllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllll l l l lllll l l l Flagstaff Avenue 147th StreetFlorence Tra i l 150'48' (8:1)129'50' (8:1)439'H:\APVA\0N1125555\CAD\C3D\MISC-2021-147-Proposed Flagstaff.dwg 9/29/2021 1:48:20 PMR 2021-147: Eagle Brook Church City of Apple Valley Flagstaff Avenue Improvements September 2021 RFEETSCALE 0 40 80 HORZ. SS>>>>>>>>>>>>>>>>>>>>>>>>>>S>SS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>S>> >DD>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>DDDDDDl l l l l llllllllllllll l lllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllll l l l lllll l l l Flagstaff Avenue 147th StreetFlorence Tra i l 150'48' (8:1)129'50' (8:1)439'H:\APVA\0N1125555\CAD\C3D\MISC-2021-147-Proposed Flagstaff.dwg 9/29/2021 1:50:00 PMR 2021-147: Eagle Brook Church City of Apple Valley Flagstaff Avenue Improvements September 2021 RFEETSCALE 0 40 80 HORZ. File #227703971 July 23, 2021 Prepared by: Stantec Consulting Services Inc. 1800 Pioneer Creek Center Maple Plain, MN 55359 Phone: 7963-479-4200 Fax: 763-479-4242 Prepared for: Eagle Brook Church 7015 20th Avenue Centerville, MN 55038 Traffic Impact Study for Eagle Brook Church in Apple Valley, MN July 2021 i Table of Contents TABLE OF CONTENTS ..................................................................................... I 1.0 EXECUTIVE SUMMARY ...................................................................... 1-1 2.0 PURPOSE AND BACKGROUND ........................................................... 2-1 3.0 EXISTING SITE CONDITIONS ............................................................ 3-1 4.0 CHURCH OPERATIONAL CHARACTERISTICS ...................................... 4-1 5.0 TRAFFIC FORECASTS ........................................................................ 5-1 6.0 TRAFFIC ANALYSIS ........................................................................... 6-1 7.0 CONCLUSIONS AND RECOMMENDATIONS ......................................... 7-1 8.0 APPENDIX ........................................................................................ 8-1 FIGURES FIGURE 1 PROJECT LOCATION .................................................................. 2-2 FIGURE 2 SITE PLAN – OPTION A1 ............................................................ 2-3 FIGURE 3 SITE PLAN – OPTION B1 ............................................................ 2-4 FIGURE 4 EXISTING CONDITIONS ............................................................. 3-3 I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. __________________________________ DATE: July 23, 2021 Edward F. Terhaar License No. 24441 July 2021 1-1 1.0 Executive Summary The purpose of this Traffic Impact Study is to evaluate the traffic impacts of the proposed Eagle Brook Church project in Apple Valley, MN. The project site is located west of Flagstaff Avenue between 147th Street W. and Florence Trail. The proposed project location is currently occupied by a vacant building which previously housed a Menards store . This study examined Sunday peak hour traffic impacts of the proposed project at the following intersections: • CR 42/Flagstaff Avenue • Flagstaff Avenue/Florence Trail • 147th Street/Flagstaff Avenue • 147th Street/Foliage Avenue • 147th Street/Galaxie Avenue • Florence Trail/Foliage Avenue • CR 46/Flagstaff Avenue Church services are held at 9 a.m. and 11 a.m. on Sunday and 4 p.m. and 6 p.m. on Saturday. The Sunday services are expected to have the highest attendance and therefore are the most critical from a traffic operations perspective. Wednesday night Student Ministry takes place from 6 p.m.-9 p.m. which is outside of the peak hour of traffic on the surrounding street system. The Sunday peak hours of 8:15 – 9:15 a.m., 10:00 – 11:00 a.m., and 12:00 – 1:00 p.m. were analyzed to coincide with peak church traffic during those time periods. In addition to the church project, the traffic impact of the former 160,000 square foot Menards store were also reviewed for comparison to the church impacts. The proposed project will involve remodeling the existing vacant building into a 1,000 seat church facility. On Sundays, the church plans to hold services at 9:00 a.m. and 11:00 a.m. Two options have been developed for the site layout of the church. The options are described below: • Option A1 – The main access for the church is on the south side of the building. Full access for the site is provided on Florence Trail at Flanders Path and on Flagstaff Avenue approximately 400 feet south of 147th Street. Approximately 725 parking spaces are provided in this option. • Option B2 - The main access for the church is on the east side of the building. Full access for the site is provided on Florence Trail at Flanders Path and on Flagstaff Avenue. The access on Flagstaff is divided into an entrance location and an exit location which are separated by approximately 300 feet. The entrance access is located approximately 400 feet south of 147th Street. Approximately 650 parking spaces are provided in this option. The project is expected to be completed by the end of 20 22. July 2021 1-2 The conclusions drawn from the information and analyses presented in this report are as follows: • The proposed project is expected to generate 457 trips during the Sunday 815-915 a.m. hour, 995 trips during the Sunday 1000-1100 a.m. hour, and 537 trips during the Sunday 1200-100 p.m. hour. • The Menards use generates 338 trips during the Sunday 815-915 a.m. hour, 790 trips during the Sunday 1000-1100 a.m. hour, and 1,128 trips during the Sunday 1200-100 p.m. hour. • All movements and intersections operate at acceptable levels of service during 2021 conditions. • Under the 2023 No Build scenario, the westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F during the 12:00 -1:00 p.m. time period. All other movements and intersections operate at acceptable levels of service during all three time periods. • During the 815-915 a.m. time period under the 2023 Build scenario, all movements and all intersections operate at acceptable levels of service for the Menar ds and Church land use scenarios. • During the 1000-1100 a.m. time period under 2023 Build scenario, all movements and all intersections operate at acceptable levels of service for the Menards and Church Option B1 scenarios. • Under the 2023 Build scenario with the Church Option A1, the following issue was observed during the 10:00-11:00 a.m. time period: o The eastbound left turn at the Flagstaff/access intersection operates at LOS E. • Under the 2023 Build scenario with the Menards land use, the following issues were observed during the 12:00-1:00 p.m. time period: o The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. o The eastbound left turn at the Flagstaff Avenue/Florence Trail intersection operates at LOS F. • Under the 2023 Build scenario with either Church option, the following issues were observed during the 12:00-1:00 p.m. time period: o The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. • Vehicle queuing analysis indicates queues are not expected to impact traffic operations at any intersection along Flagstaff Avenue. Under Church Option A1, the 400 foot spacing between 147th Street and the proposed Church access adequately accommodates all queues without impacting operations at either intersection. Under Church Option B1, the 300 foot spacing between Church access points adequately accommodates all queues without impacting traffic operations. July 2021 1-3 • For Church Option A1, the following lane geometrics are recommended for the proposed access on Flagstaff Avenue: o Provide a northbound left turn lane o Provide a southbound right turn lane o Provide two exiting lanes (left turn and right turn) o Provide one entering lane • For Church Option B1, the following lane geometrics are recommended for the proposed access points on Flagstaff Avenue: o North access (enter only) ▪ Provide a northbound left turn lane ▪ Provide a southbound right turn lane ▪ Provide one entering lane o South access (exit only) ▪ Provide two exiting lanes (left turn and right turn) • The following turn lane and taper lengths are recommended at the north access intersection on Flagstaff Avenue: o Northbound left turn lane – 210 foot turn lane with 60 foot taper o Southbound right turn lane – 65 foot turn lane with 60 foot taper • The exact location of new access points on Flagstaff Avenue must be coordinated with City staff to determine the preferred location relative to turn lane requirem ents. • We recommend that Church staff develop a detailed traffic operations plan tailored for the proposed site to ensure efficient traffic and parking operations. This plan will include coordination with the existing Sam’s Club store to determine the amount of control needed at the drive aisle connection points within the parking lot. July 2021 2-1 2.0 Purpose and Background The purpose of this Traffic Impact Study is to evaluate the traffic impacts of the proposed Eagle Brook Church project in Apple Valley, MN. The project site is located west of Flagstaff Avenue between 147th Street W. and Florence Trail. The proposed project location is currently occupied by a vacant building which previously housed a Menards store. The project location is shown in Figure 1. This study examined Sunday peak hour traffic impacts of the proposed project at the following intersections: • CR 42/Flagstaff Avenue • Flagstaff Avenue/Florence Trail • 147th Street/Flagstaff Avenue • 147th Street/Foliage Avenue • 147th Street/Galaxie Avenue • Florence Trail/Foliage Avenue • CR 46/Flagstaff Avenue Church services are held at 9 a.m. and 11 a.m. on Sunday and 4 p.m. and 6 p.m. on Saturday. The Sunday services are expected to have the highest attendance and therefore are the most critical from a traffic operations perspective. Wednesday night Student Ministry takes place from 6 p.m.-9 p.m. which is outside of the peak hour of traffic on the surrounding street system. The Sunday peak hours of 8:15 – 9:15 a.m., 10:00 – 11:00 a.m., and 12:00 – 1:00 p.m. were analyzed to coincide with peak church traffic during those time periods. In addition to the church project, the traffic impact of the former 160,000 square foot Menards store were also reviewed for comparison to the church impacts. Proposed Development Characteristics The proposed project will involve remodeling the existing vacant building into a 1,000 seat church facility. On Sundays, the church plans to hold services at 9:00 a.m. and 11:00 a.m. Two options have been developed for the site layout of the church. The options are described below: • Option A1 – The main access for the church is on the south side of the building. Full access for the site is provided on Florence Trail at Flanders Path and on Flagstaff Avenue approximately 400 feet south of 147th Street. Approximately 725 parking spaces are provided in this option. • Option B2 - The main access for the church is on the east side of the building. Full access for the site is provided on Florence Trail at Flanders Path and on Flagstaff Avenue. The access on Flagstaff is divided into an entrance location and an exit location which are separated by approximately 300 feet. The entrance access is located approximately 400 feet south of 147th Street. Approximately 650 parking spaces are provided in this option. The current site plans are shown in Figures 2 and 3. The project is expected to be completed by the end of 2022. July 2021 2-2 July 2021 2-3 July 2021 2-4 July 2021 3-1 3.0 Existing Site Conditions The proposed site is currently a vacant building. The site is bounded by 147th Street on the north, Flagstaff Avenue on the east, Florence Trail on the south, and a Sam’s Club store and parking lot on the west. Near the site location, Flagstaff Avenue is a two lane roadway with at major intersections. Flagstaff Avenue expands to a four-lane divided roadway south of Florence Trail. 147th Street, Florence Trail, and Foliage Avenue are three-lane roadways. CR 42, CR 46, and Galaxie Avenue are four-lane divided roadways with turn lanes and traffic signal control at major intersections. Cutters Lane is a two lane roadway. Existing site conditions are shown in Figure 3 and described below. 147th Street/Galaxie Avenue (traffic signal control) This intersection has four approaches and is controlled with a traffic signal. All approaches provide one left turn lane, one through lane, and one through/right turn lane. 147th Street/Foliage Avenue (minor street stop control) This intersection has four approaches and is controlled with stop signs on the Foliage Avenue approaches. All approaches provide one left turn lane and one through/right turn lane. 147th Street/Flagstaff Avenue (all-way stop sign control) This intersection has four approaches and is controlled with stop signs on all approaches. The eastbound and northbound approaches provide one left turn lane and one through/right turn lane. The westbound and southbound approaches provide one left turn lane, one through lane, and one right turn lane. Florence Trail/Foliage Avenue (minor street stop control) This intersection has four approaches and is controlled with stop signs on the Florence Trail approaches. All approaches provide one left turn lane and one through/right turn lane. Flagstaff Avenue/Florence Trail (minor street stop control) This intersection has three approaches and is controlled with a stop sign on the Florence Trail approach. The eastbound approach provides one left turn lane and one right turn lane. The northbound approach provides one left turn lane and two through lanes. The southbound approach provides one through lane and one through/right turn lane. CR 42/Flagstaff Avenue (traffic signal control) This intersection has four approaches and is controlled with a traffic signal. The eastbound and westbound approaches provide one left turn lane, two through lanes, and one right turn lane. The northbound and southbound approaches provide one left turn lane, one through lane, and one through/right turn lane. July 2021 3-2 CR 46/Flagstaff Avenue (traffic signal control) This intersection has four approaches and is controlled with a traffic signal. The eastbound and westbound approaches provide one left turn lane, two through lanes, and one right turn lane. The southbound approach provides one left turn lane, one through lane, and one right turn lane. The northbound approach provides one left turn lane and one through/right turn lane. Traffic Volume Data Sunday turn movement volumes were recorded from 8:00 a.m. – 1:00 p.m. in May 2021. Traffic volumes recorded at the MnDOT Automatic Traffic Recording (ATR) station located on CSAH 42 west of Portland Avenue were reviewed to determine if traffic volumes in the area have returned to normal levels experienced before reductions due to the COVID-19 pandemic. Data at this location indicate that Sunday traffic volumes recorded in May 2021 were greater than Sunday volumes recorded in May 2019. Therefore, no adjustments were made the traffic volumes collected for this study. July 2021 3-3 July 2021 4-1 4.0 Church Operational Characteristics Information and detailed observations completed at an existing Eagle Brook Church location in Blaine, MN were used to gain an understanding of church traffic and parking operations. Operations were observed for both the 9:00 a.m. and 11:00 a.m. church services. Turn movement volumes at the access point on 95th Avenue NE were recorded before and after each service, giving us a clear understanding of the access operations and arrival and exit times. Parking usage and on-site operations were recorded, including the amount of time it took for the lot to empty after each service. Throughout all entering and exiting periods, volunteers were stationed throughout the site to assist with on-site operations. This detailed information gave us detailed information on the traffic operation characteristics expected at the proposed location. The percentage of parishioners entering and exiting by time period was determined from the turn movement data. The resulting percentages are shown in Table 4-1. Table 4-1 Entering and Exiting Percentages at Existing Eagle Brook Church in Blaine, MN Time Period Percent Entering Percent Exiting 815-830 a.m. 3.7 0 830-845 a.m. 19.9 0 845-900 a.m. 54.3 0 900-915 a.m. 22.1 0 1000-1015 a.m. 6.0 46.1 1015-1030 a.m. 22.2 43.8 1030-1045 a.m. 54.9 7.3 1045-1100 a.m. 16.9 2.8 1200-1215 p.m. 0 36.1 1215-1230 p.m. 0 52.0 1230-1245 p.m. 0 8.6 1245-100 p.m. 0 3.3 As shown in the table, all traffic was entering the site prior to the 9:00 a.m. service. After the 9:00 a.m. service and before the 11:00 a.m. service, there was a combination of entering and exiting traffic from both services. As shown, the majority of the exiting traffic occurs during the first half hour, while the majority of the entering traffic occurs during the last half hour. After the 11:00 a.m. service, all traffic was exiting the site. Even though the Blaine site experienced high attendance on the observa tion date, parishioners were able to enter and exit the site with minimal delays. Eagle Brook staff understands the importance of effective on-site operations and strive to provide a positive experience when entering and exiting the site. Church staff an d volunteers follow a detailed traffic operations plan to ensure efficient traffic and parking operations. July 2021 5-1 5.0 Traffic Forecasts Traffic Forecast Scenarios To adequately address the impacts of the proposed project, forecasts and analyses were completed for the year 2023. As described earlier, traffic forecasts were developed for the Options A1 and B1 for the church layout. Specifically, traffic forecasts for the Sunday peak hours of 8:15 – 9:15 a.m., 10:00 – 11:00 a.m., and 12:00 – 1:00 p.m. were completed for the following scenarios: • 2021 Existing. Turn movement volumes collected in May 2021 were used for existing conditions. The existing volume inform ation includes trips generated by uses near the project site. • 2023 No-Build. Existing volumes at the subject intersections were increased to account for background growth generated by other development within the area. Based on historic traffic counts in the area, a growth rate of 2.0% per year was applied to the 2021 volumes to develop the 2023 No-Build volumes. • 2023 Build. Trips generated by the proposed use were added to the 2023 No-Build volumes to determine 2023 Build volumes. In addition to the church project, the traffic impact of the former 160,000 square foot Menards store were also reviewed for comparison to the church impacts. Trip Generation for the Church Use The expected development trips were determined from detailed attendance information provided by Eagle Brook Church. Attendance information from other existing church locations was analyzed to establish the expected attendance at the proposed location. Based on this data and growth estimates for this area, an attendance of 800 persons is projected for the 9:00 a.m. service and 940 persons at the 11:00 a.m. service. Based on vehicle occupancy data from the existing church locations, this equates to 457 vehicles for the 9:00 a.m. service and 537 vehicles for the 11:00 a.m. service. The entering and exiting percentages presented in Table 3-1 were applied to the forecasted vehicle counts, resulting in the trip generation information in Table 5-1. July 2021 5-2 Table 5-1 Sunday Trip Generation for Proposed Church Time Period Trips In Out 815-830 a.m. 17 0 830-845 a.m. 91 0 845-900 a.m. 248 0 900-915 a.m. 101 0 1000-1015 a.m. 33 211 1015-1030 a.m. 119 200 1030-1045 a.m. 295 33 1045-1100 a.m. 91 13 1200-1215 p.m. 0 194 1215-1230 p.m. 0 279 1230-1245 p.m. 0 46 1245-100 p.m. 0 18 Trip Generation for Menards Use Sunday trip generation estimates for the Menards store were calculated based on data for the Home Improvement Superstore presented in the tenth edition of Trip Generation, published by the Institute of Transportation Engineers (ITE). The ITE data indicates the Sunday peak hour occurs in the early afternoon, which aligns with the 12:00-1:00 p.m. period used in this study. Traffic data from the surrounding streets was used to estimate the percentage of trips that would occur during the other analysis hours. The data indicated the 8:15-9:15 a.m. hour is approximately 30 percent of the peak hour and the 10:00-11:00 a.m. hour is approximately 70 percent of the peak hour. The resultant trip generation estimates are shown in Table 5-2. Table 5-2 Sunday Trip Generation for Menards Land Use Size 815-915 AM 1000-1100 AM 1200-100 PM In Out Total In Out Total In Out Total Menards store 160,000 SF 176 162 338 411 379 790 587 541 1128 Note: SF=square feet Trip Generation Comparison Trip generated by the Church use and the Menards use are shown in Table 5-3 for comparison purposes. Table 5-3 Sunday Trip Generation for Menards Land Use 815-915 AM 1000-1100 AM 1200-100 PM In Out Total In Out Total In Out Total Menards store 176 162 338 411 379 790 587 541 1128 Eagle Brook Church 457 0 457 538 457 995 0 537 537 July 2021 5-3 Trip Distribution Percentages for Church Use Trip distribution percentages for the subject project trips were established based on detailed analysis of existing and future parishioners that are expected to visit to the new site. The distribution percentages for new trips generated by the proposed development are as follows: • 25 percent to/from the south on CSAH 23 via CSAH 42 • 8 percent to/from the west on CSAH 42 • 5 percent to/from the north on CSAH 23 via 147th Street • 3 percent to/from the west on 147th Street • 7 percent to/from the north on Galaxie Avenue • 2 percent to/from the north on Foliage Avenue • 5 percent to/from the north on Flagstaff Avenue • 10 percent to/from the east on 147th Street • 10 percent to/from the east on CSAH 42 • 25 percent to/from the south on Flagstaff Avenue Trip Distribution Percentages for Menards Use Trip distribution percentages for the Menards trips were established based on the nearby roadway network, existing traffic patterns, location of the subject development in relation to major attractions and population concentrations, and previous studies completed in the area. The distribution percentages for trips generated by the Menards use are as follows: • 30 percent to/from the west on CSAH 42 • 5 percent to/from the west on 147th Street • 5 percent to/from the north on Galaxie Avenue • 5 percent to/from the north on Foliage Avenue • 10 percent to/from the north on Flagstaff Avenue • 15 percent to/from the east on 147th Street • 20 percent to/from the east on CSAH 42 • 10 percent to/from the south on Flagstaff Avenue Traffic Volumes Project trips were assigned to the surrounding roadway network using the preceding trip distribution percentages. Traffic volumes were established during the 8:15 – 9:15 a.m., 10:00 – 11:00 a.m., and 12:00 – 1:00 p.m. hours for the following forecasting scenarios: The resultant traffic volumes are presented in the Appendix. July 2021 6-1 6.0 Traffic Analysis Level of Service Analysis Traffic analyses were completed for the subject intersection for all scenarios described earlier during the weekday a.m. and p.m. peak hours using Synchro/SimTraffic software. Initial analysis was completed using existing geometrics and intersection control. Capacity analysis results are presented in terms of level of service (LOS), which is defined in terms of traffic delay at the intersection. LOS ranges from A to F. LOS A represents the best operation, with little delay for each vehicle using the intersection. LOS F represents the worst operation with excessive delay. The following is a detailed description of the conditions described by each LOS designation: • Level of service A corresponds to a condition with motorists virtually unaffected by the intersection control mechanism. For a signalized or an unsignalized intersection, the average delay per vehicle would be approximately 10 seconds or less. • Level of service B represents a condition with a high degree of freedom, but with some influence from the intersection control device and the traffic volumes. For a signalized intersection, the average delay ranges from 10 to 20 seconds. An unsignalized intersection would have delays ranging from 10 to 15 seconds for this level. • Level of service C depicts a condition which remains stable, but with significant influence from the intersection control device and the traffic volumes. The general level of comfort and convenience changes noticeably at this level. The delay ranges from 20 to 35 seconds for a signalized intersection and from 15 to 25 seconds for an unsignalized intersection at this level. • Level of service D corresponds to a condition in which speed and freedom are significantly restricted. Though traffic flow remains stable, reductions in comfort and convenience are experienced. The control delay for this level is 35 to 55 seconds for a signalized intersection and 25 to 35 seconds for an unsignalized intersection. • Level of service E represents a condition with traffic at or near the capacity of the intersection with poor levels of comfort and convenience. The delay ranges from 55 to 80 seconds for a signalized intersection and from 35 to 50 seconds for an unsignalized intersection at this level. • Level of service F represents a condition in which the volume of traffic approaching the intersection exceeds the volume that can be served. Chara cteristics often experienced include long queues, stop-and-go waves, poor travel times, low comfort and convenience, and increased accident exposure. Delays over 80 seconds for a signalized intersection and over 50 seconds for an unsignalized intersection correspond to this level of service. July 2021 6-2 The LOS results for the study intersections are described below and are shown in the Appendix. All LOS worksheets are included in the Appendix for further detail. Menards Scenario Menards Scenario – 815-915 a.m. During the 815-915 a.m. time period under 2021, 2023 No-Build, and 2023 Build scenarios, all movements and all intersections operate at acceptable levels of service. Menards Scenario – 1000-1100 a.m. During the 1000-1100 a.m. time period under 2021, 2023 No-Build, and 2023 Build scenarios, all movements and all intersections operate at acceptable levels of service. Menards Scenario – 1200-100 p.m. During the 1200-100 p.m. time period under the 2021 scenario, all movements and all intersections operate at acceptable levels of service. Under the 2023 No-Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. Under the 2023 Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. • The eastbound left turn at the Flagstaff Avenue/Florence Trail intersection operates at LOS F. Church Option A1 Scenario Church Option A1 Scenario – 815-915 a.m. During the 815-915 a.m. time period under 2021, 2023 No-Build, and 2023 Build scenarios, all movements and all intersections operate at acceptable levels of service. Church Option A1 Scenario – 1000-1100 a.m. During the 1000-1100 a.m. time period under 2021and 2023 No-Build scenarios, all movements and all intersections operate at acceptable levels of service. Under the 2023 Build scenario, the following issue was observed: • The eastbound left turn at the Flagstaff/access intersection operates at LOS E. Church Option A1 Scenario – 1200-100 p.m. During the 1200-100 p.m. time period under the 2021 scenario, all movements and all intersections operate at acceptable levels of service. July 2021 6-3 Under the 2023 No-Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. Under the 2023 Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. Church Option B1 Scenario Church Option B1 Scenario – 815-915 a.m. During the 815-915 a.m. time period under 2021, 2023 No-Build, and 2023 Build scenarios, all movements and all intersections operate at acceptable levels of service. Church Option B1 Scenario – 1000-1100 a.m. During the 1000-1100 a.m. time period under 2021, 2023 No-Build, and 2023 Build scenarios, all movements and all intersections operate at acceptable levels of service. Church Option B1 Scenario – 1200-100 p.m. During the 1200-100 p.m. time period under the 2021 scenario, all movements and all intersections operate at acceptable levels of service. Under the 2023 No-Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. Under the 2023 Build scenario, the following issues were observed: • The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. Overall Traffic Impacts The 815-915 a.m. time period operates at acceptable levels under all scenarios. During the 10:00-11:00 a.m. time period the only issue observed was LOS E for the eastbound left turn at the Flagstaff Avenue/access intersection under Church Option A1. This condition does not occur under Church Option B1. This issue is not expected to have a significant impact on the intersection operations and does not impact the entering movements. The 1200-100 p.m. hour is the critical time period due to amount of background traffic present in the area from other retail uses. Under all land use scenarios, the westbound left turn at the Florence Trail/Foliage Avenue operates at LOS F under both the No-Build and Build scenarios. This indicates the level of service issue exists even without any additional development under 2023 conditions. July 2021 6-4 Under the 2023 Build scenario with the Menards store, the eastbound left turn at the Flagstaff Avenue/Florence Trail intersection operates at LOS F. This does not occur under the 2023 No-Build scenario, which indicates poor level of service is cau sed by the Menards store traffic. Vehicle Queueing Impacts for the Church Scenarios Vehicle queue length impacts on Flagstaff Avenue were reviewed for the Church scenarios using SimTraffic software. The queue length information was developed based on detailed 15 minute volumes developed for each scenario. The queueing summary sheets are included in the Appendix. The SimTraffic simulations were carefully reviewed for all scenarios to determine if any vehicle queues significantly impact traffic operations on Flagstaff Avenue related to the proposed Church access locations. As described earlier, the proposed access locations for each Church scenarios are: • Option A1 – One full access point on Flagstaff Avenue located 400 feet south of 147 th Street. • Option B1 – One entrance only access on Flagstaff located 400 feet south on 147th Street. One exit only access located 300 feet south of the entrance access. The 95th percentile maximum queue lengths at each intersection on Flagstaff Avenue are shown in Tables 6-1 and 6-2. Table 6-1 Church Option A1 - 95th Percentile Queue Lengths (in feet) Intersection 815-915 a.m. 1000-1100 a.m. 1200-100 a.m. 147th St/Flagstaff Ave – northbound approach 52 63 81 Flagstaff Ave/Church access – southbound approach 38 27 0 Flagstaff Avenue/Church access – northbound approach 81 104 0 Flagstaff Ave/Florence Tr – southbound approach 0 10 7 CSAH 42/Flagstaff Ave – southbound approach 37 146 217 Table 6-2 Church Option B1 - 95th Percentile Queue Lengths (in feet) Intersection 815-915 a.m. 1000-1100 a.m. 1200-100 a.m. 147th St/Flagstaff Ave – northbound approach 51 78 83 Flagstaff Ave/Church north access – southbound approach 18 28 0 Flagstaff Avenue/Church north access – northbound approach 93 83 0 Flagstaff Ave/Florence Tr – southbound approach 0 0 0 CSAH 42/Flagstaff Ave – southbound approach 41 176 191 July 2021 6-5 The analysis results indicate vehicle queue are not expected to impact traffic operations at any intersections along Flagstaff Avenue. Under Option A1, the 400 foot spacing between 147th Street and the proposed Church access adequately accommodates all queues without impacting operations at either intersection. Under Option B1, the 300 foot spacing between Church access points adequately accommodates all queues without impacting traffic operations. Recommended Flagstaff Avenue Access Lane Geometrics The following lane geometrics are recommended for the Flagstaff Avenue access intersections: • For Church Option A1, the following lane geometrics are recommended for the proposed access on Flagstaff Avenue: o Provide a northbound left turn lane o Provide a southbound right turn lane o Provide two exiting lanes (left turn and right turn) o Provide one entering lane • For Church Option B1, the following lane geometrics are recommended for the proposed access points on Flagstaff Avenue: o North access (enter only) ▪ Provide a northbound left turn lane ▪ Provide a southbound right turn lane ▪ Provide one entering lane o South access (exit only) ▪ Provide two exiting lanes (left turn and right turn) Flagstaff Avenue Turn Lane Recommendations The MnDOT publication “Design of Turn Lane Guidelines” was used to determine the recommended length of the northbound left turn and southbound right turn lanes at the proposed access. The methodology presented in this publication, which was developed through the Minnesota Local Road Research Board (LRRB), accounts for specific roadway characteristics such as speed, traffic volume, and facility type when determining turn lane lengths. Based on the methodology presented in this publication, the following turn lane and taper lengths are recommended: • Northbound left turn lane – 210 foot turn lane with 60 foot taper • Southbound right turn lane – 65 foot turn lane with 60 foot taper The corresponding calculation worksheets are included in the Appendix. Internal Site Operations Eagle Brook staff understands the importance of effective on-site operations and strive to provide a positive experience when entering and exiting the site. We recommend that Church staff develop a detailed traffic operations plan tailored for the proposed site to ensure efficient traffic and parking operations. This plan will include coordination with the existing Sam’s Club store to determine the amount of control needed at the drive aisle connection points within the parking lot. July 2021 6-6 Church staff and trained volunteers will be utilized to direct entering and exiting traffic in order to fill and empty the parking lot efficiently. July 2021 7-1 7.0 Conclusions and Recommendations The conclusions drawn from the information and analyses presented in this report are as follows: • The proposed project is expected to generate 457 trips during the Sunday 815-915 a.m. hour, 995 trips during the Sunday 1000-1100 a.m. hour, and 537 trips during the Sunday 1200-100 p.m. hour. • The Menards use generates 338 trips during the Sunday 815-915 a.m. hour, 790 trips during the Sunday 1000-1100 a.m. hour, and 1,128 trips during the Sunday 1200-100 p.m. hour. • All movements and intersections operate at acceptable levels of service during 2021 conditions. • Under the 2023 No Build scenario, the westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F during the 12:00 -1:00 p.m. time period. All other movements and intersections operate at acceptable levels of service during all three time periods. • During the 815-915 a.m. time period under the 2023 Build scenario, all movements and all intersections operate at acceptable levels of service for the Menar ds and Church land use scenarios. • During the 1000-1100 a.m. time period under 2023 Build scenario, all movements and all intersections operate at acceptable levels of service for the Menards and Church Option B1 scenarios. • Under the 2023 Build scenario with the Church Option A1, the following issue was observed during the 10:00-11:00 a.m. time period: o The eastbound left turn at the Flagstaff/access intersection operates at LOS E. • Under the 2023 Build scenario with the Menards land use, the following issues were observed during the 12:00-1:00 p.m. time period: o The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. o The eastbound left turn at the Flagstaff Avenue/Florence Trail intersection operates at LOS F. • Under the 2023 Build scenario with either Church option, the following issues were observed during the 12:00-1:00 p.m. time period: o The westbound left turn at the Florence Trail/Foliage Avenue intersection operates at LOS F. July 2021 7-2 • Vehicle queuing analysis indicates queues are not expected to impact traffic operations at any intersection along Flagstaff Avenue. Under Church Option A1, the 400 foot spacing between 147th Street and the proposed Church access adequately accommodates all queues without impacting operations at either intersection. Under Church Option B1, the 300 foot spacing between Church access points adequately accommodates all queues without impacting traffic operations. • For Church Option A1, the following lane geometrics are recommended for the proposed access on Flagstaff Avenue: o Provide a northbound left turn lane o Provide a southbound right turn lane o Provide two exiting lanes (left turn and right turn) o Provide one entering lane • For Church Option B1, the following lane geometrics are recommended for the proposed access points on Flagstaff Avenue: o North access (enter only) ▪ Provide a northbound left turn lane ▪ Provide a southbound right turn lane ▪ Provide one entering lane o South access (exit only) ▪ Provide two exiting lanes (left turn and right turn) • The following turn lane and taper lengths are recommended at the north access intersection on Flagstaff Avenue: o Northbound left turn lane – 210 foot turn lane with 60 foot taper o Southbound right turn lane – 65 foot turn lane with 60 foot taper • The exact location of new access points on Flagstaff Avenue must be coordinated with City staff to determine the preferred location relative to turn lane requirem ents. • We recommend that Church staff develop a detailed traffic operations plan tailored for the proposed site to ensure efficient traffic and parking operations. This plan will include coordination with the existing Sam’s Club store to determine the amount of control needed at the drive aisle connection points within the parking lot. I T E M: 5.B. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:L and Use / Action I tems Description: W haley Detached Garage Variances - P C21-26-V 1. Consider height variance to increase the height of a detached garage from a maximum of 16' to 21' (5' variance). 2. Consider side yard setback variance to reduce the side yard setback for a detached garage from 20' to 11' (9' variance). S taff Contact: K athy Bodmer, A I C P, Planner Department / Division: Community Development Department Applicant: Matt W haley P roject Number: P C21-26-V Applicant Date: 9/22/2021 60 Days: 11/21/2021 120 Days: 1/20/2022 AC T I O N RE Q UE S T E D: Staff finds that the subject property is heavily wooded, with varied topography, which limits the buildable locations for a detached garage. T hus staff recommends approval of the variances to construct a 21' tall detached accessory garage 11' from the side property line based on the following findings: Findings: 1. T he site is heavily wooded and has significant changes in topography. 2. T he site is 1.33 acres (57,737 sq. ft.). 3. T he home is 28' tall; the proposed detached garage would be 21' tall. 4. T he design of the detached garage will complement the design of the home with an eyebrow roof overhang, lap siding and similar roof pitch. 5. T he construction site selected will minimize tree removal and site grading. 6. T he site selected will be screened from the view of the street and neighboring properties. 7. Resulting impervious coverage will be 11.6%, well below the required maximum coverage. 8. T he taller roof allows for a rafter system with additional storage. Storage is increased while retaining the maximum footprint allowed for a detached accessory building. Recommended Action: If the Planning C ommission concurs, the following actions are recommended. 1. Recommend approval of the variance to increase the maximum height of a detached garage from 16' to 21' subject to compliance with all City C odes, construction standards and the conditions listed below: 2. Recommend approval of the variance to decrease the side yard setback from 20' to 11' for a detached garage subject to compliance with all C ity C odes, construction standards and the conditions listed below: Conditions of Approval: 1. T he existing 246 sq. ft. detached accessory building shall be removed prior to the issuance of the building permit. 2. No tree removal, site work or any other land-disturbing activity shall occur until the Natural Resources Management Permit (N RMP) is issued. 3. Site grading is subject to final review and approval by the City Engineer. 4. No part of the structure, including roof overhangs, may encroach into an easement of record. 5. T he floor drain shall be addressed in accordance with the building code requirements. S UM M ARY: Matt Whaley, 12724 Denmark Ave, requests consideration of two variances to construct a 750 sq. ft. detached garage on his property. He seeks a height variance to increase the height of the building from 16' to 21' (5' variance) and a side yard setback variance reducing the side yard from 20' to 11' (9' variance). T he Whaley property is 1.33 acres, heavily wooded with varying topography. T he property is located in T HE WO O D S subdivision on the northeast side of the City and is zoned "R-1" (Single family residential, minimum lot size 40,000 sq. ft.). T he petitioner requests the variances to construct the building in the location shown to minimize grading and tree removal. He states that the area he has selected to construct the garage will require no tree removal and does not exceed 2' of topographic change. Mr. Whaley points out that his house is currently 28' tall, so the building will not loom above or look out of scale with the existing home. In addition, he plans to construct the exterior of the building with lap siding and will incorporate an "eyebrow" roof overhang to mimic the design of the house. T he pitch of the garage roof will match the pitch of the home's roof. By placing the garage forward of the front of the house, he will be able to use the existing driveway, minimizing impervious surface coverage. B AC K G RO UND: Definition of “Practical difficulties”: T he applicant proposes to use the property in a reasonable manner not permitted by the zoning provisions of the code; T he plight of the applicant is due to circumstances unique to the property not created by the applicant; and T he variance, if granted, will not alter the essential character of the locality. Economic considerations alone do not constitute practical difficulties. In order to grant a variance, the C ity considers the following factors to determine whether the applicant established that there are practical difficulties in complying with the provision(s) of this C hapter: 1. Special conditions apply to the structure or land in question that are particular to the property and do not apply generally to other land or structures in the district or vicinity in which the land is located; 2. T he granting of the proposed variance will not be contrary to the intent of this chapter; 3. T he special conditions or circumstances do not result from the actions of the owner/applicant; 4. T he granting of the variance will not merely serve as a convenience to the applicant, but is necessary to alleviate practical difficulties in complying with the zoning provisions of this Code; and 5. T he variance requested is the minimum variance necessary to alleviate the practical difficulty. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Background Material Map Plan S et Memo PROJECT REVIEW WHALEY GARAGE HEIGHT VARIANCE Existing Conditions Property Location: 12724 Denmark Ave Legal Description: Lot 2, Block 1 THE WOODS Comprehensive Plan Designation LD-Low Density Residential, 3 – 6 units/acre Zoning Classification R-1, Single family residential, minimum lot size 40,000 sq. ft. Existing Platting Platted lot. Current Land Use Single family residential. Size: 57,737 sq. ft. (1.33 acres) Topography: Rolling Existing Vegetation Wooded single family home site. Other Significant Natural Features None. djacent Properties/Land Uses NORTH 12674 Denmark Ave (Lot 1, Block 1, THE WOODS) Comprehensive Plan LD-Low Density Residential (0-6 units/acre) Zoning/Land Use R-1 Single Family 40,000 s.f. EAST 12775 Deepwoods Court, Rosemount Comprehensive Plan Zoning/Land Use SOUTH 12756 Denmark Ave (Lot 3, Block 1, THE WOODS) Comprehensive Plan LD-Low Density Residential (0-6 units/acre) Zoning/Land Use R-1 Single Family 40,000 s.f. WEST 12737 Denmark Ave (Lot 1, Block 3, THE WOODS) Comprehensive Plan LD-Low Density Residential (0-6 units/acre) Zoning/Land Use R-1 Single Family 40,000 s.f. SITE APPLE VALLEYROSEMOUNTDOVER DR DIAMOND PATH DORY AVE129TH ST W DENMARK AVEDORCHESTERTRLDRIFTWOOD LN128TH ST W D U R H A M W A YDURANGO PLWHALEY GARAGEVARIANCES µ LOCATION MAP ^ SITE Apple ValleyRosemountA P R-1 R-3 R-5 R-3 R-3R-3 PD- R-3 R-3 R-3 R-3 R-1 R-1 R-3 R-1 R-3 R-3 R-1 R-3 M-4C M-7C M-7C M-7C M-7C M-7C M-4C M-2C PD-681PILOT KNOB RDMCANDREWS RD DIAMOND PATH DOVER DR D O R CHESTERTRLDORY AVE129TH ST W 127T HST W ECHO LN DRIFTWOOD LN 128TH ST W D U R H A M WAYCAMPSACACCESSRDELDERBERRYCTEDEN CTµ WHALEY GARAGEVARIANCES ZONING MAP ^ FARQUARLAKE  12724 Denmark Ave Aerial Photo  Detached Garage Approximate Location  12724 Denmark Ave Oblique Aerial Denmark Ave To: City of Apple Valley Planning Commission 7100 147th St. W. Apple Valley, MN 55124 From: Matt Whaley 12724 Denmark Ave. Apple Valley, MN 55124 -- Re: Variance Request Submission All, This letter and the accompanying material relate to plans I have submitted to the building inspector regarding building an accessory building at the above listed address. My goal is to obtain a variance to locate the structure in front of the current house as well as to exceed the 16’ maximum height. My goal in this process is twofold: 1-To maintain the character of the property. The main house peak is ~28 feet tall. (See photo of house on page 2) This accessory building roof would be ~21 feet tall at the peak. Shorter so as to not dominate the look of the property, but tall enough to match the existing structure so the pair align well aesthetically. The accessory building would have lap siding and asphalt shingles and look more like a ‘detached addition’ rather than an outbuilding. (See similar examples on page 3) 2-To maintain the character of the neighborhood. Large mature trees dominate the lots in our area, and the location in front of the house is the only practical location. By placing it in front of the house, we will not have to remove any trees, or endanger any root systems as would be necessary for other locations on the lot. The grade on the lot is a challenge as well. The proposed location is minimally sloped (~2’ maximum elevation change) while all other locations would require large amounts of fill , and alterations to current grading to level off a suitable location. An additional positive of this location is minimizing impervious paved surface needed to reach the building. Thank you all for your consideration in this matter, I look forward to speaking with you in the near future. Matt 12724 Denmark Ave 5230 132nd St. W. 13105 132nd St. W. City of MEMO Building Inspections TO: Kathy Bodmer, Planner FROM: Chris Andrejka, Building Inspector DATE: 10/1/2021 SUBJECT: 12724 Denmark Ave- Whaley Garage Height Variance • Construction shall comply with the 2020 Minnesota Residential Code. • Braced wall panels must either be designed from the 2020 Minnesota Residential Code or a MN Licensed Engineer. • A signed engineered plan is required for any walls constructed that are over 12’ in height. 12’ high walls are beyond the scope of the 2020 Minnesota Residential Code referenced in table R602.10.5. • Engineered truss specifications for light, medium or heavy storage are required based on the use. • Thickened slab on grade footings require rebar to be installed per figure R403.1.3 and comply with section R403.1.3.3 of the 2020 Minnesota Residential Code. • When possible, floor drains for residential garages shall be connected to the sanitary building drain. If connection to the sanitary is technically infeasible, such floor drains may be allowed to exit the building to daylight if doing so can be done in such a way as to not create a nuisance for neighboring properties or City storm sewers. I T E M: 6.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E:October 6, 2021 S E C T I O N:Other Business Description: Review of Upcoming S chedule and Other Updates S taff Contact: Carol Kovacic, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: N/A S UM M ARY: Next P lanning Commission Meetings: Wednesday, October 20, 2021 - 7:00 p.m. Wednesday, November 3, 2021 - 7:00 p.m. Public hearing applications due by 9:00 a.m. on Wednesday, October 6, 2021. Site plan, variance applications due by 9:00 a.m. on Wednesday, October 20, 2021. Next City Council Meetings: T hursday, October 14, 2021 - 7:00 p.m. T hursday, October 28, 2021 - 7:00 p.m. B AC K G RO UND: N/A B UD G E T I M PAC T: N/A