HomeMy WebLinkAbout06/06/20121. CALL TO ORDER
CITY OF APPLE VALLEY
PLANNING COMMISSION MINUTES
JUNE 6, 2012
The City of Apple Valley Planning Commission meeting was called to order by Vice-Chair Burke
at 7:00 p.m.
Members Present: Ken Alwin, Tim Burke, Keith Diekmann, Paul Scanlan, and David Schindler.
Members Absent: Tom Melander, Brian Wasserman
Staff Present: Community Development Director Bruce Nordquist, Associate Planner Kathy
Bodmer, City Attorney Sharon Hills, Assistant City Engineer David Bennett and Department
Assistant Joan Murphy.
2. APPROVAL OF AGENDA
Vice-Chair Burke asked if there were any changes to the agenda.
MOTION: Commissioner Schindler moved, seconded by Commissioner Scanlan, approving the
agenda. Ayes - 5 - Nays - 0.
3. APPROVAL OF MINUTES OF May 16, 2012.
Vice-Chair Burke asked if there were any changes to the minutes. Hearing none he called for a
motion.
MOTION: Commissioner Alwin moved, seconded by Commissioner Scanlan, approving the
minutes of the meeting of May 16, 2012, as written. Ayes - 4 - Nays - 0 - Abstained
- 1 (Diekmann)
4. CONSENT ITEMS
A. Finding of Consistency with Comprehensive Plan for Property Acquisition
MOTION: Commissioner Burke moved, seconded by Commissioner Scanlan,
1) Find the acquisition of the following parcels by the City for park purposes to be
consistent with the Comprehensive Plan:
• Lot 2, Block 6, The Legacy of Apple Valley North Addition
• Lot 1, Block 6, The Legacy of Apple Valley North Addition
• Lot 1, Block 5, The Legacy of Apple Valley North Addition
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 6, 2012
Page 2 of 6
• Lot 1, Block 4, The Legacy of Apple Valley North Addition
2) Find the acquisition of Lot 1, Block 3, The Legacy of Apple Valley North
Addition by the Apple Valley Economic Development Authority (EDA) for future
mixed use development to be consistent with the Comprehensive Plan.
3) Comprehensive Plan amendments consistent with the motion would be finalized
at time of plan review.
Ayes 5 — Nays — O.
5. PUBLIC HEARINGS
--NONE--
6. LAND USE/ACTION ITEMS
A. 140 Street Transit Station - Consideration of site plan review/building permit
authorization to construct two 160-sq. ft. enclosed walk-up transit station buildings. (PC12-08-
Misc.)
Community Development Director Bruce Nordquist provided an overview of the policy background
and stated that both the Economic Development Authority and the Apple Valley City Council had
both reviewed the design for the planned station stops at 140th Street and 147th Street. He shared
information that had been discussed on a policy level so the Planning Commission would be fully
informed.
Associate Planner Kathy Bodmer summarized the project for the 140th Street Station. She stated
the Metropolitan Council requested Site Plan Review/Building Permit Authorization to construct
two 20' x 8' (160 sf) enclosed transit station buildings on the west side (southbound) and east side
(northbound) of Cedar Avenue at Upper 139th Street.
The transit station buildings would be located behind a bus pull-off lane that would be constructed
on the east and west sides of Cedar Avenue in connection with Dakota County's Cedar Avenue
construction project. The station buildings would be fully enclosed and would have a 17' x 10'
covered platform area.
The 140th Street Transit Station buildings are intended to be temporary and modular, which will
allow them to be disassembled and relocated in the future. The Minnesota Valley Transit Authority
(MVTA), the City's transit provider, would be conducting a study of park and ride needs in northern
Apple Valley in the near future. Once that study is concluded, a permanent transit station building
would be constructed at the 140th Street station stop.
The 140th Street Transit Station would be a walk-up station; no off-street parking would be
provided. Transit riders would be expected to access the station on foot, by bicycle, or by being
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 6, 2012
Page 3 of 6
dropped off Screening and colored renderings of building elevations were provided as well as
landscape plans.
Ms. Bodmer stated staff is recommending approval of the site plan/building permit authorization
with conditions for the 140th Street Transit Station. She presented the petitioner's request for the
147th Street station and planned to take questions for both transit stations at the end of her
presentation.
B. 147 Street Transit Station — Consideration of site plan review/building permit
authorization to construct two 410-sq. ft. enclosed walk-up transit station buildings. (PC12-09-
Misc.)
Ms. Bodmer stated the Metropolitan Council requested Site Plan Review/Building Permit
Authorization to construct two 34 x 12' (approx. 410 sf) enclosed transit station buildings on the
west side (southbound) and east side (northbound) of Cedar Avenue approximately 630' north of
147th Street West,
The transit station buildings are proposed to be constructed in two phases with the first phase
consisting of a 410 sf enclosed building area and a covered platform. Phase II would include an
addition of 462 sf on the main floor, a second level addition of 324 sf, installation of a skyway,
stairs and an elevator in each building.
On April 12, 2012, the Apple Valley City Council unanimously adopted Resolution No. 2012-80
related to the construction of the 140th Street and 147th Street Transit Stations. The resolution
supported the planning and construction of the transit facilities and contained the following points
related to the City's economic development objectives:
1. Fully enclosed facilities at the 140th Street and 147th Street station stops and an integrated
skyway at the 147th Street station stop that complies with all applicable City Codes and
standards should be installed as part of facility planning and construction in 2012.
2. When sizing transit station facilities and planning safe crossing at station stops the
objectives to be achieved in this order include minimizing business disruption, future
development potential, bike and pedestrian connection and safety service level and transfer
opportunities, roadway traffic management impacts and ridership.
3. The City of Apple Valley Cedar Corridor partners including the Dakota County Regional
Rail Authority, the Minnesota Valley Transit Authority, Dakota County and the
Metropolitan Council are requested to work cooperatively in achieving the objective of a
model Bus Rapid Transit system for the Twin Cities Region.
Proceeding with the Phase II portion of the 147th Street Transit Station as requested by the City
Council was not supported by Dakota County and the Met Council because they state that ridership
is not projected to be high enough at this time to warrant a skyway and there is a lack of funding
available.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 6, 2012
Page 4 of 6
Like the 140th Street Stations, the 147th Street Transit Stations will be walk-up stations; no off-
street parking is provided. Transit riders are expected to access the station on foot, by bicycle, or by
being dropped off. Businesses adjacent to Cedar Avenue have raised concerns that transit riders
may park in their parking lots or on nearby public streets and cross through their property to access
the transit stations.
Lindsay Sheppard, Metro Transit, Division of the Metropolitan Council, provided a brief
presentation of 140th/147th Street Stations, as well as a timeline overview if the project meets
approval.
Commissioner Diekmann questioned if both sides of the 147th Street Station facility would need to
be closed to construct Phase II if the skyway would be put in at a later date rather than constructing
it all at once.
Ms. Sheppard answered that it is her understanding the station stop could be constructed in such a
way that the entire facility would not need to be closed. It could be constructed in phases.
Bill Hickey, Collaborative Design Group, Inc., stated the advantage to the rather long platform is
that they would be able to move operations to one end of it during construction. Other than the
closing of Cedar Avenue one night for the installation of the actual skyway, the service for the
station would remain open.
Commissioner Alwin, referring to the stop at 140th Street, stated he has no issues with the walk-up
concept but believes it is set up for failure in terms of walk-up due to the fact that from that location
there is no place to walk-up from or to. The only access to that station is from Cedar Avenue itself.
He does not know how the riders are going to get to that station. Parking on residential streets
would irritate those neighborhoods.
Kristine Elwood, Dakota County, stated the County led a study on the implementation plan that
identified those locations. She said the City of Apple Valley was involved in that process to
determine those locations. Based on that study they moved forward with the design. It was the plan
to continue to forward working through with the City. They did look at the full radius of a station
and based on the study, people would walk up to a half mile. The study indicated that people in that
area would walk that distance and get to that location.
Commissioner Scanlan expressed concern with the 140th Street Station and how to differentiate
these station stops from regular bus stops and that these stops are true rapid transit to mimic light
rail. He inquired to the design if the 140th Street Station could be disassembled and moved to
another location. He thought if there would be more architectural enhancements and if it did not
look like just another bus stop, possibly it would attract people to the bus rapid transit.
Mr. Hickey stated the design was very much on their minds and the intent was to make it so the
station stops are part of a family of station stops up Cedar Avenue. The materials would be the
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 6, 2012
Page 5 of 6
same as the design at 155th Street Station Stop. The 140th Street Station was necessarily scaled
down due to ridership but it still would have a presence.
Commissioner Scanlan questioned if there was a time element that defined temporary.
Mr. Hickey answered that in terms of the construction to anybody walking up the 140th Street
Station would look as permanent as need be and could stay forever. What makes the station
temporary is that they laid out the structure with the thought to picking it up and moving it. He said
from a building technology standpoint the station could be moved.
Mr. Nordquist stated each station stop is unique in itself. The 140th Street Station is a housing
station, 147th Street Station is a business station and the 155th Street Station is a mixed use station.
He said the design presented this evening is part of the policy discussion and the evolution that has
occurred over the last three to four months.
Ms. Sheppard added that the 140th Street Stations are sized to the projected ridership for 2030, for
the max accumulation at one point and beyond the 2030 ridership and thinks there are a couple
things to consider for when it moves and one would be the potential for a park and ride and then if
they saw the ridership exceeding their projection then they would be looking to relocate the station
sooner.
MOTION: Commissioner Schindler moved, seconded by Commissioner Diekmann, to table
consideration of site plan review/building permit authorization for the 140th Street
Transit Station and 147th Street Transit Station until the next meeting. Ayes - 5 -
Nays - 0.
7. OTHER BUSINESS
A. Dalseth Playhouse Sketch Plan - Sketch plan review of a proposed 16' x 18' (288 sq. ft.)
playhouse.
Associate Planner Kathy Bodmer presented the request of petitioners Jennifer and Pascal Dalseth
for a proposed variance for a playhouse at 4869 Dominica Way. The property abuts Farquar Lake
and is therefore within the "SH" (Shoreland Overlay) zoning district. The Dalseths wish to
construct a 16' x 18' (288 se playhouse which will be located approximately 30 from the Ordinary
High Water Level (OHWL) of Farquar Lake (899.2' elevation). The petitioners wish to use the
building for a children's playhouse in the summer and a warming house in the winter. The
minimum setback from the OHWL in the SH zoning district is 75'.
The shoreland overlay zoning district has setback requirements for buildings but makes no
distinction between primary structures, accessory structures, and play or recreational structures. In
a typical residential zoning district, the zoning code allows recreational equipment including
playhouses to encroach into the rear yard setback. The SH zoning district requires all buildings to
meet the shoreland setback requirement.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 6, 2012
Page 6 of 6
Mr. Pascal Dalseth provided an overview of what his intent of the playhouse/warming house would
be used for and why he was asking for a variance. He stated they are more comfortable going
through the proper channels with the City.
B. Review of upcoming schedule and other updates.
Mr. Nordquist stated that the next Planning Commission meeting will take place Wednesday, June
20, 2012, at 7:00 p.m.
8. ADJOURNMENT
Hearing no further comments from the Planning Staff or Planning Commission, Vice-Chair Burke
asked for a motion to adjourn.
MOTION: Commissioner Alwin moved, seconded by Commissioner Scanlan, to adjourn the
meeting at 8:14 p.m. Ayes - 5 - Nays - 0.
Respectfully Submitted,
Joa urphy, Planning D p tment
Approved by the Apple Valley Planning Commission on