Loading...
HomeMy WebLinkAbout09/21/2022 Agenda Packet M eeting L ocation: M unicipal Center 7100 147th Street West Apple Valley, M innesota 55124 The Planning C ommission meeting is both a web broadcast and on a virtual access template to allow remote public participation. The meeting is always open to the public at the Municipal C enter. September 21, 2022 PLA N N IN G C O MMISSIO N T EN TAT IVE A G EN D A 7:00 P M 1.Call to Order 2.Approve Agenda 3.Approve Consent Agenda Items Consent Agenda Items are considered routine and will be enacted with a single motion, without discussion, unless a commissioner or citizen requests to have any item separately considered. It will then be moved to the land use/action items for consideration. A.Approve Minutes of August 17, 2022 Regular Meeting 4.Public Hearings A.Apple Valley Square 7th Addition LO C AT IO N: 7575 153rd St W. A PPLIC A N T: Apple Valley Minnesota Realty LLC 5.Land Use / Action Items A.Floor and Decor 1. C onsider proposed zoning amendment to Planned Development No. 507/Zone 1 to include building materials sales as a permitted use 2. C onsider proposed zoning amendment to Planned Development No. 507/Zone 1 to increase the building coverage from 20% to 30% 3. Site Plan/Building Permit Authorization to allow for the construction of a 80,000-sq. ft. building on 6.45 acres LO C AT IO N: 15630 Cedar Avenue A PPLIC A N T: CenterPoint Integrated Solutions and A P Apple Valley Limited Partnership 6.Other Business A.Review of Upcoming Schedule and Other Updates Planning Commission - Wednesday, October 5, 2022 - 7:00 p.m. Planning Commission - Wednesday, October 19, 2022 - 7:00 p.m. C ity Council - T hursday, September 22, 2022 - 7:00 p.m. C ity Council - T hursday, October 13, 2022 - 7:00 p.m. 7.Adjourn Regular meetings are broadcast, live, on C harter C ommunications C able C hannel 180 and on the C ity's website at www.cityof applevalley.org I T E M: 3.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :September 21, 2022 S E C T I O N:Consent A genda Description: A pprove Minutes of A ugust 17, 2022 Regular Meeting S taff Contact: B reanna Vincent, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: Approve minutes of regular meeting of August 17, 2022. S UM M ARY: T he minutes of the last regular Planning Commission meeting is attached for your review and approval. B AC K G RO UND: State statute requires the creation and preservation of meeting minutes which document the official actions and proceedings of public governing bodies. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Minutes CITY OF APPLE VALLEY PLANNING COMMISSION MINUTES August 17, 2022 1.CALL TO ORDER The City of Apple Valley Planning Commission Meeting was called to order by Vice Chair Scanlan at 7:00 p.m. Members Present: Paul Scanlan, Keith Diekmann, David Schindler, Phil Mahowald Member(s) Absent: Jodi Kurtz, Becky Sandahl, and Jeff Prewitt City staff members attending: Community Develo pment Director Bruce Nordquist, City Planner Tom Lovelace, Planner Alex Sharpe, City Engineer Brandon Anderson, City Attorney Sharon Hills, and Department Assistant Breanna Vincent. 2.APPROVAL OF AGENDA Vice Chair Scanlan asked if there were any changes to the agenda. MOTION: Commissioner Schindler moved, seconded by Commissioner Diekmann, approving the agenda. Roll call vote: Ayes - 4 – Nays - 0. 3. CONSENT ITEMS MOTION: Commissioner Schindler moved, seconded by Commissioner Diekmann, approving the minutes of the meeting of August 3, 2022. Roll call vote: Ayes – 4 – Nays – 0. 4.PUBLIC HEARING A.Floor and Décor Planner Lovelace presented the staff report. Commissioner Schindler stated that the southeast corner could use additional landscaping and requested that better elevations be provided at the next meeting. Planner Lovelace stated that there are some different colors within the horizontal lines but that better images can be provided as they do not translate well to the larger screen. Commissioner Diekmann asked why the new building appears to be much larger in the plans than the current building though the square footage is similar. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 17, 2022 Page 2 of 5 Planner Lovelace stated that the current building is squarer in shape as opposed to a longer more rectangular shape. Commissioner Diekmann asked how many parking spaces are required for this use. Planner Lovelace stated that there are different requirements with this use and that it is being treated similar to a hardware operation and roughly 1 space per 800 sq. ft. is required. The demand is higher for a movie theater as opposed to this operation. Commissioner Mahowald agreed with previous comments regarding additional landscaping being added and requested that an elevation that shows the landscaping be provided at the next meeting. Commissioner Mahowald also stated he had concerns over increasing building coverage from 20% to 30%. Planner Lovelace advised that the new coverage would actually be around 28.5% and much of the lot is already covered in impervious surface. Commissioner Schindler added that they would be adding extra green space and also onsite drainage. He also agreed that the new building did seem much larger than the current. Planner Lovelace suggested providing a superimposed photo of one building over the other to get an idea of the size difference. Commissioner Diekmann asked what the lot size was and if the current coverage was already over the limit. Planner Lovelace stated he would have the information at the next meeting. Vice Chair Scanlan asked if the parking lot to the north could be used as a separate outlot for another use in the future. Planner Lovelace stated that it is a possibility. There are some cross access/cross parking agreements with Red Robin and MVTA. Vice Chair Scanlan pointed out that if the parking lot is used for another use, it would affect the parking requirement for this project. He also stated the importance of having a balanced façade and landscaping. Petitioner Alan Catchpool (Kimley Horn) was present for questions. With no further comments, Vice Chair Scanlan closed the public hearing. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 17, 2022 Page 3 of 5 B.Apple Valley Square 7th Addition The public hearing for this item is being continued to the September 21, 2022, meeting. 5.LAND USE A.Woodwinds 8th Addition Preliminary Plat Planner Sharpe presented the staff report. Petitioner Bob McNearney (McNearney Family Homes) was present for questions. There were no questions from staff or commissioners. MOTION: Commissioner Diekmann moved, seconded by Commissioner Schindler, to recommend approval of a preliminary plat to subdivide a 2.97 acre parcel into six single-family lots through Woodwinds 8th Addition preliminary plat subject to conditions 1 through 18 in the staff report. Roll call vote: Ayes – 4 – Nays – 0. 6. OTHER BUSINESS A.Orchard Place Amenity Area/North Creek Greenway Trail Concepts City Engineer Brandon Anderson presented a brief staff report. Senior Landscape Architect Karyn Luger (Short Elliott Hendrickson Inc.) provided a presentation of the four concepts being proposed for the Orchard Place Amenity Area. Commissioner Mahowald asked where parking would be located for this amenity area. City Engineer Anderson stated that the primary function is a pedestrian trail. As the retail development is built, it may include additional parking. The amenity area will be designed as a destination along the greenway trail. There is some parking available at various parks that could be utilized. Commissioner Mahowald opined that having an amphitheater may be difficult with no parking available. City Engineer Anderson stated that the term “amphitheater” is being use loosely in these concepts. It’s more of a passive use for gathering and will not be used to generate crowds CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 17, 2022 Page 4 of 5 or host concerts. Feedback from the Parks & Recreation Advisory Committee showed that most did not believe the amphitheater would be beneficial. Commissioner Mahowald advised that the amenities associated with the bike trail seem to be more beneficial to the area. Commissioner Diekmann asked what the elevation difference would be from the retail space to the amenity area. City Engineer Anderson stated it would be 15’. Commissioner Diekmann advised that concept 4 was initially ideal as it draws in people from the retail space as opposed to the other 3 concepts which are more focused on the trail, though with the lowered elevation, it likely will not be visible from the retail space. Commissioner Diekmann stated that concept 2 may be the most likely to draw in people from the retail space while still incorporating the trail focus, especially if the pergolas are high enough to be visible from the retail space. Commissioner Schindler stated that it was difficult to imagine the concepts but that concept 2 seemed to be a good fit with the gathering area. Commissioner Schindler advised that focusing on the trail amenities would be preferred. Vice Chair Scanlan opined that the amphitheater may be a nice amenity to keep some separation between those using the trail and others who may want to just have a gathering space. With the tunnel connection, there could be an increase in those who frequent Cobblestone to use the greenway and access the retail space. Commissioner Schindler asked if the only shade would be provided from trees. Senior Landscape Architect Luger stated that the plan is to incorporate some type of structure for shade. CD Director Nordquist asked what the maintenance responsibility would entail. City Engineer Anderson stated that it has not yet been determined between the City and Dakota County for this amenity area. The trail will be maintained by Dakota County. CD Director Nordquist asked if the zig-zag design for the connection point to the retail area would provide winter maintenance difficulty. City Engineer Anderson stated that the switchback trail would be difficult to maintain but the project would need to be a 12-month use. Feedback from the Parks & Recreation Advisory Committee advised the softening of the switchback to be more gradual is ideal. CITY OF APPLE VALLEY Dakota County, Minnesota Planning Commission Minutes August 17, 2022 Page 5 of 5 Commissioner Mahowald pointed out that the ballfields were recently redeveloped on the north side of Apple Valley High School and there is a significant drop in elevation from the trail to the ballfields and that it was a nice job of making it a soft transition. City Engineer Anderson stated that the greenway is graded to a singular elevation but that the challenge is the significant grade in this smaller area. B.Review of Upcoming Schedule and Other Updates The next Planning Commission meeting is Wednesday, September 7, 2022, 7:00 p.m. The next City Council meeting is Thursday, August 25, 2022, 7:00 p.m. C.Review and Comments from Bruce Nordquist, Outgoing Community Development Director CD Director Nordquist provided “Plant – Grow – Prosper” posters for commissioners. Mr. Nordquist also pointed out the invitation to the retirement event occurring at Valleywood on August 31st. 7. ADJOURNMENT Vice Chair Scanlan asked for a motion to adjourn. MOTION: Commissioner Schindler moved, seconded by Commissioner Diekmann, to adjourn the meeting at 8:25 p.m. Roll call vote: Ayes – 4 – Nays – 0. Respectfully submitted, ______________________________________ Breanna Vincent, Planning Department Assistant Approved by the Apple Valley Planning Commission on 9/21/2022 . Jodi Kurtz, Chair I T E M: 4.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :September 21, 2022 S E C T I O N:P ublic Hearings Description: A pple Valley Square 7th A ddition S taff Contact: A lex Sharpe, Planning and Economic Dev. S pec. Department / Division: Community Development Department Applicant: A pple Valley Minnesota Realty L L C P roject Number: P C22-16-B C S V Applicant Date: 7/20/2022 60 Days: 9/18/2022 120 Days: 11/17/2022 AC T I O N RE Q UE S T E D: Continue the public hearing for A pple Valley Square 7th Addition to October 19, 2022 without discussion. S UM M ARY: T he applicant has requested that the Planning C ommission consider an alternative timeline for the review of the application. T he applicant is continuing to compile essential items for the City to properly review their submission and is seeking to continue the public hearing to October 19, 2022. To date, the applicant has requested consideration of the following actions and additional actions may be forthcoming: 1. Consider subdivision by preliminary plat of Lot 2, Block 1, Apple Valley Square 4th Addition into two lots by Apple Valley Square 7th Addition. 2. Consider a site parking variance of 65 parking stalls for Lot 1, Block 1, Apple Valley Square 7th Addition. 3. Consider a conditional use permit for a Class-II restaurant with drive-through on Lot 2, Block 1, Apple Valley Square 7th Addition. 4. Consider a setback variance to allow a C lass-II restaurant within 1,000 feet of a residential use. 5. Consider a site plan and building permit authorization for a 2,347 sq. ft. Popeyes restaurant on Lot 2, Block 1, Apple Valley Square 7th Addition. B AC K G RO UND: N/A B UD G E T I M PAC T: All new lots are subject to park dedication. T he existing lot has previously paid park dedication fees but the newly created lot for Popeyes will be subject to park dedication. T his is consistent with nearby developments, including Chase Bank. I T E M: 5.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :September 21, 2022 S E C T I O N:L and Use / Action I tems Description: Floor and Decor S taff Contact: Thomas J . L ovelace, City P lanner Department / Division: Community Development Department Applicant: CenterP oint I ntegrated Solution, L L C and A P A pple Valley L imited P artnership P roject Number: P C22-08-B Z Applicant Date: 7/13/2022 60 Days: 9/10/2022 120 Days: 11/9/2022 AC T I O N RE Q UE S T E D: If the Planning C ommission concurs, staff is recommending the following actions: Recommend approval of a zoning amendment to Planned Development No. 507 to include building materials sales as a permitted use in Zone 1. Recommend approval of a zoning amendment to Planned Development No. 507 to increase the building coverage from 20% to 30% in Zone 1. Recommend approval of site plan/building permit authorization to allow for the construction of a 80,000-sq. ft. building on 6.45 acres subject to the following conditions: 1. T he building permit shall be issued to property legally described as Lot 2, Block 1, Carroll C enter Fourth Addition. 2. Issuance of a permit shall be subject to the the zoning amendments to Planned Development N o. 507 to include building material sales store as a permitted use and building coverage increase from 20% to 30% in zone 1. 3. Issuance of a permit shall be subject to the vacation of an existing public drainage and utility easement of which, a section is located under the footprint of the building. 4. Issuance of a building permit shall be subject to the establishment and recording of a 12-foot wide public drainage and utility easement over and across a portion of storm sewer pipe that will run north and south between the east side of the building and west side of Gaslight Drive. 5. Construction shall occur in conformance with the site plan dated August 29, 2022. 6. Construction shall occur in conformance with the landscape plan dated August 29, 2022, (including sodded/seeded public boulevard area up to each street curbline); subject to submission of a detailed landscape planting price list for verification of the City’s 2½% landscaping requirement at the time of building permit application. 7. Landscaping shall be installed between the west parking area and the C edar Avenue right-of-way. 8. Construction shall occur in conformance with the elevation plan dated J uly 11, 2022. All necessary mechanical protrusions visible to the exterior shall be screened or handled in accordance with Section 155.346 (3) (a) (b) of the City C ode. 9. Site grading shall occur in conformance with a N atural Resources Management Plan (N RMP) which shall include final grading plan to be submitted for review and approval by the City Engineer. 10. T he property owner shall execute a maintenance agreement or other suitable agreement to be filed with the deed that ensures the perpetual maintenance of any onsite infiltration area. 11. T he applicant shall submit a lighting plan that shows that the development will be in compliance with the C ity's lighting requirements. T he hours of illumination of any signage directly adjacent to a residential area shall be restricted. 12. A separate application and signage plan in conformance with the sign regulations must be submitted for review and approval to the City prior to the erection of any signs. 13. Construction shall be limited to the hours of 7:00 a.m. to 7:00 p.m. Monday through Friday. 14. Prior to issuance of a building permit, a construction staging and construction personnel parking plan shall be submitted and approved by the C ity. 15. Installation of a bike rack in front of the building at a location that will not impede use of any sidewalk 16. Earthmoving activities shall be limited to the hours of 7:00 a.m. to 5:30 p.m. Monday through Friday. 17. Earthmoving activities shall not occur when wind velocity exceeds thirty (30) miles per hour. Watering to control dust shall occur as needed and whenever directed by the Apple Valley Building Official or Zoning Administrator. S UM M ARY: For consideration is a request from C enterPoint Integrated Solutions and A P Apple Valley Limited Partnership to amend Planned Development No. 507 to allow for building material sales as a permitted use in Zone 1 and to increase the building coverage from 20% to 30% in that zone. T hey are also requesting site plan/building permit authorization approval that would demolish the existing multi-screen movie theater (Dakota C ounty G IS data) and construct an 80,000-sq. ft. building materials sales store. T he 6.45-acre site is located at 15630 C edar Avenue and is adjacent to the Apple Valley Transit Station, Red Robin restaurant and Holiday gas and convenience store operation to the north; the former Apple Valley Transit Station and C ortland Square senior apartments to the east; Fairview Cedar Ridge Clinic to the south; and Cedar Avenue to the west. Access to the site will be off Gaslight Drive, a local street that connects with 155th Street West to the north and 157th Street West to the south. Both 155th and 157th Street are collector streets that are designed to distribute and channel trips between local streets and arterials. No access will be allowed from C edar Avenue or 155th Street West. B AC K G RO UND: Comprehensiv e P lan: T he subject property is currently guided "C " (Commercial) on the 2040 Comprehensive Plan Land Use Map. Commercial areas include a wide variety of retail, office and service uses that vary in intensity and off-site impacts. T he City uses the zoning ordinance to regulate the intensity and characteristics of development. Lower-intensity districts include "LB" (Limited Business) and "N C C" (Neighborhood Convenience C enter). Higher-intensity districts include "G B" (General Business) and "RB" (Retail Business). Each zoning district establishes land use and performance standards such as parking, building setbacks, storm water infiltration, access and lot coverage set the parameters for development. Zoning: T he property is currently zoned "P D-507/Zone 1 (Planned Development). T he purpose of this planned development designation is to provide for an integrated mix of certain types of neighborhood convenience retail, office, medical, restaurant, commercial recreation, transit related and institutional uses. Permitted uses in Zone 1 include convenience stores, offices, daycare centers, a variety of retail uses, Class I and II restaurants, movie theaters, bowling alleys, athletic clubs, and other similar recreational uses, and on-sale liquor in conjunction with a restaurant. Conditional uses include motor fuel sales and car wash operations as part of a convenience store, and hours of operation for uses adjacent to residential uses between the hours of 1:00 a.m. and 6:00 a.m. T he planned development ordinance also requires that all deliveries and loading done in conjunction with a use shall be done during normal hours of operation. T he proposed use is not listed as a permitted or conditional use. T he applicant has requested an amendment to the planned development ordinance to allow for building materials sales a permitted use within Zone 1 of the planned development. Also, the proposed development plans indicate that the building will cover 28.5% of the site, which is 8.5% more than what is currently allowed in Zone 1 of the planned development. T he applicant is requesting an amendment to the minimum area requirements section of the planned ordinance to allow for a building coverage increase from 20% to 30%. It should be noted that Dakota County's G IS website identifies an existing 72,916-sq. ft. building on the 6.45-acre lot. Based upon the G IS information, the current building coverage is 25.95%. T he applicant has surveyed the property and has indicated that the existing footprint of the theater is 67,000 square feet, which is 23.8% building coverage. In both instances, the current building coverage exceeds the maximum allowed by the ordinance. T he proposed development would add between 2.6%-4.7% of building coverage from what currently exists. Site P lan: T he subject property is the current location of a multi-screen movie theater complex and 432-space surface parking lot. T he applicant is proposing to tear down the theater building and remove all but the most northerly 128-space parking lot. T he current building is oriented so that the front of the building is facing north. T he proposed building will be oriented so the main entrance will face west along Cedar Avenue. T here are several existing easements on the property. T hey include the typical drainage and utility easements along the perimeter of the property as well other drainage and utility easements, sidewalk, sidewalk and trail, trail and utility, access restriction, sign and sight line easements. A ny impact to the existing easements due to the redevelopment of this property will need to be addressed. T he proposed building will be built over an existing public drainage and utility easements. T he applicant is proposing to relocate the storm sewer so that it will not run under the new building. T he new storm sewer lines will be private, therefore, no new drainage and utility easement will be required. However, the existing public easement will need to be vacated as part of the proposed storm sewer relocation on the site. A hearing for the vacation of the easement is tentatively scheduled for the October 13th C ity C ouncil meeting. New storm sewer lines will be installed, of which a public draining and utility will need to be established over a section of pipe that runs north and south between the east side of the building and west side of Gaslight Drive. T he plan shows the construction of a 80,000-sq. ft. building and the addition of 113 parking spaces along the west and north side of the property. T he planned development ordinance requires that parking areas shall be screened from views of adjacent streets and residential areas through a combination of planting and berming. Vehicle access to the site will be from Gaslight Drive via an existing drive aisle and a new driveway. Delivery vehicles will access the site and the receiving docks from the new driveway. T he new driveway will also provide indirect access to the customer parking areas. No direct access from C edar Avenue and 155th Street West will be permitted. Traffic circulation patterns, and ingress and egress to the site shall be designed so as to minimize the impact on adjacent residential uses directly to the east. A traffic report has been prepared that shows existing traffic compared to proposed traffic. T he report indicates that the amount of traffic generated by the proposed building material sales store will be significantly lower than the current theater use. Bicycle rack shall be provided, but shall not impede the use of the sidewalks adjacent to the building. Motorcycle parking shall also be provided near the building entrance, but shall not encroach into the walkways. Receiving docks, a trash compactor and trash enclosure will be located in the southeast corner of the site. A ten-foot tall masonry wall will screen the docks and trash compactor. T he trash area will be located in a separate enclosure. T he exterior finish of the screen wall and trash enclosure shall be the same material used on the exterior of building. Grading: Grading will be done to prepare the site for development. T his will include the excavation of area directly north and south of the building for two storm water infiltration basins. T he Natural Resources C oordinator has reviewed the proposed grading and utility plans and has the following comments: Native seed mixes have a long establishment period (up to 3-4 years). T he applicant may wish to plant plugs or larger plants to accelerate establishment and permit closure. Permit closure requires vegetation to be established to 70% density of perennial vegetation. Perimeter controls are needed around infiltration areas. Protections from compaction and clogging are recommended. Storm water flow to the bioretention basins should cut off until permanent vegetation is sufficiently established to prevent washout of seed and coverage of the basin bottom. Establishment time may be accelerated if switching to a plug planting instead of a seeding. Privately owned storm water features will require a storm water maintenance agreement that must be recorded on the property. Site grading shall occur in conformance with a final grading plan to be submitted for review and approval prior to issuance of any C ity permits for the proposed development. Elev ation Drawings: T he building will be constructed with concrete panels having an exposed brick finish. All exterior finishes shall be integrally colored, no painted finish shall be allowed. Exterior roof-top finishes shall preclude the use of exposed or plated metal; any metal surface shall be coated or anodized with a non-reflective, glare-free finish. All exterior vertical surfaces of residential, multiple residential, commercial, industrial and institutional structures of any type shall be treated as a front and have an equally attractive or same fascia. T he color change of the exterior and pilasters, spaced approximately 30 feet apart, will provide some relief to the exterior finish. T hese treatments and finishes will help in meeting the requirement of treating all the building elevations as a front. Landscape P lan: T he landscape shows a variety of plantings for the proposed development. As stated previously, per the planned development ordinance, parking and circulation areas shall be screened from views of adjacent streets and residential areas through a combination of planting and berming. T he applicant shall add landscaping, that includes deciduous canopy trees, and berming along the areas directly adjacent to C edar Avenue and G aslight Drive. T his could be a challenge along C edar Avenue because of a number of underground utilities located between the property line and edge of the proposed parking area. T he applicant will need to meet landscape requirements within the C ity’s zoning ordinance, which requires that commercial developments install landscaping (live plant material excluding sod) that will have a minimum cost of 2.5% of the estimated building construction cost based on Means C onstruction Data. T he applicant will need to submit a detailed planting list for C ity staff review and approval prior to issuance of a building permit. Landscaped islands shall be provided in parking lots containing more than 25 parking stalls. Total area of islands shall be at least 5% of the parking lot area, except that no island shall be less than the size of a standard parking stall. Islands shall be surrounded by a concrete curb and provided with a weed retardant mesh or plastic sheeting. Islands shall be planted with a minimum 2½-inch diameter tree at the rate of one tree per 150 square feet of island area. Redevelopment of the site will result in the loss of 19 trees. Eight of those trees are in landscape islands, nine are located on the south side of the property and two are located along the east side of the building. Twenty-three trees around the property that will be disturbed will be saved as well as the trees around the most northerly parking lot and directly adjacent to the Red Robin restaurant. T he N atural Resources C oordinator has reviewed the landscape plans and has the following comments: All public existing trees around the perimeter of the site and along C edar Avenue shall remain protected throughout construction. Any tree lost due to construction damage shall be replaced on a one to one ratio. T he suggested tree species are well diversified. Incorporation of additional native plants into the planting plan in place of cultivars and native cultivars will have additional water quality and pollinator habitat benefits. Av ailability of Municipal Utilities: Sanitary sewer and watermain line to serve the building are currently available on site. C onnections will be made from the existing lines to the proposed building. Utility construction shall occur in conformance with a final utility plan to be submitted for review and approval prior to issuance of any City permits. P edestrian Access: T he site plan shows a sidewalk connections from the site to C edar Avenue and G aslight Drive. T hose sidewalk connections shall have a minimum width of six feet. Lighting P lan: In commercial and industrial areas, any light or combination of lights that cast light on any adjacent commercial or industrial property shall not exceed one foot candle as measured at the property line. Also, any lighting used to illuminate an off-street parking area or sign shall be arranged so as to deflect light away from any adjoining residential zone or from the public streets. D irect glare from floodlights or similar sources, shall not be directed into any adjoining property or public streets, and all the source of all lights shall be hooded or controlled in some manner so as not to light adjacent property. Mitigative measures shall be employed to limit glare and spill light to protect neighboring parcels and to maintain traffic safety on public roads. T hese measures shall include lenses, shields, louvers, prismatic control devices and limitations on the height and type of fixtures. Any light or combination of lights that cast light on any adjacent commercial or industrial property shall not exceed one-foot candle as measured at the property line candles at ground level. T he applicant shall submit a lighting plan that shows that the development will be in compliance with the C ity's lighting requirements. T he hours of illumination of any signage directly adjacent to a residential area shall be restricted. Signs: T he submitted plans show building signage locations on their building elevations. No signage details have been included with their submission. Approval of the site plan/building permit authorization will not constitute sign approval. A separate sign application will need to be submitted and approved prior to erecting any signs. Signage and identity structures shall be incorporated into a landscape design and shown on landscape or site plans. All signage shall be in conformance with C hapter 154 of the C ity Code and any special performance standards set forth the planned development ordinance. P ublic Hearing: T he Planning Commission held a public hearing on the proposed amendments at their August 17, 2022, meeting. T he public hearing was opened, no comments were received from the public and the hearing was closed. B UD G E T I M PAC T: N/A AT TAC HM E NT S : Applicant L etter Memo Applicant L etter L ocation Map Comp Plan Map Z oning Map F inal Plat Plan S et L andscaping Plan Site P lan Elevations Elevations Site P lan City of Apple Valley Project Narrative The below is a narrative as part of the Site Plan Review Application for the proposed demolition of existing AMC and Floor and Decor development at 15630 Cedar Ave. Apple Valley, MN 55124 (PIN:011625301020). The site is currently an AMC Theater with a Zoning Designation of PD – Future Use of C-Commercial (“Apple Valley”). Floor & Decor sells hard surface flooring products (tile, wood, stone, etc.), vanities, sinks, counter tops, and accessory products for install. Typical store hours consist of Monday- Friday: 7am-9pm, Saturday 8am-9pm, and Sunday 10am-7pm. It is anticipated that the store will have 40-50 employees with 60% of the staff being full time employees with a morning shift and evening shift. Customers will find a wide range of quality, in-stock flooring. PRO customers, who are typically installers, make up 60% of the customer base. These customer s have a dedicated PRO sales manager to help them get their jobs done. Floor & Decor also offers free design services which is typically used by non-PRO customers to assist in making product selections. The products are displayed on the sales floor and much of the inventory is stored on steel racks. Several forklifts are on-site to move pallets of products and unload the delivery trucks. Deliveries occur 5-7 days a week and up to 4 deliveries per day can be expected depending on the sales volume of the store for a total of 20-25 total deliveries per week (maximum truck size is WB-67). Due to the nature of Floor and Decors operation forklifts are necessary to move material from the trucks to the showroom floor. To avoid conflict and ensure the safety of all customers and employees Floor and Decor makes its deliveries overnight. Items are moved directly from the trucks to the showroom floor. The proposed project will demolish the AMC Theater space and construct a, 80,000 sf Floor and Decor Retail store. The proposed building includes prototypical storefront entrance and façade to match Floor and Decors corporate brand. Other site improvements include: • Loading Dock Addition to the rear of the building • New parking lot layout and construction o Building rotated to face Cedar Ave, underground retention system will be completely redone to sere the new building location • Landscape modifications to meet city code o Update all landscape buffers / parking lot landscape • Minor Site Improvements to accommodate delivery truck turning, ADA considerations, and designated tenant parking areas. • Installing Customer Pickup Area (CPU) o CPU area facilitates large quantity orders for both PRO and typical customers. The CPU area is serviced by a forklift to load and unload large quantities of orders directly into their vehicle. Floor & Decor has retained Kimley-Horn and Associates, Inc. (Kimley-Horn) to determine actual parking and trip generation rates at several of their existing stores around the country. Due to the characteristics of Floor & Decor’s products, the sizes of the stores are very large in comparison to other retail stores, typically ranging between 60,000 and 100,000 square feet. The stores are sized to accommodate the large amount of flooring inventory that is typically stored and displayed for sale within the store. Historically, in order to determine the trip generation and required parking for a proposed Floor & Decor store, municipalities have used parking and trip generation rates that are based on studies for more traditional commercial retail stores. These traditional retail rates tend to overestimate the parking spaces needed and the weekday peak hour trips generated by a Floor & Decor store. This can result in Floor & Decor incurring unnecessary costs associated with constructing under-utilized parking lots for its stores or over-assessment for off-site transportation mitigation or mobility fees. Kimley-Horn has recently conducted parking and trip generation data collection for several existing Floor & Decor stores around the country. From the data collection, actual parking and trip generation rates were determined for the existing st ores, based on the gross leasable area of the stores. This report summarizes the data collection and resulting parking and trip generation rates. Trip generation study statistic may be provided if desired. Floor and Decor looks forward to partnering with the City of Apple Valley. Should you have any questions or need any additional information please feel free to contact me at kmccoy@centerpoint-is.com or 970-749-5907. Respectfully, Kelton McCoy Floor & Decor Parking and Trip Generation Study Page 12 March 2017 Table 2: Peak Hour Trip Generation Summary Store Location and Size Date Peak Hour Inbound Trips Outbound Trips Total Trips Trip Generation Rate (Trips per 1,000 SF GLA) Inbound Trip Percentage Outbound Trip Percentage Wed, Jan 25, 2017 8:30 AM - 9:30 AM 43 38 81 0.88 53%47% Wed, Jan 25, 2017 4:00 PM - 5:00 PM 40 37 77 0.84 52%48% Thur, Jan 26, 2017 8:30 AM - 9:30 AM 10 5 15 0.17 67%33% Wed, Jan 25, 2017 5:15 PM - 6:15 PM 27 22 49 0.55 55%45% Thur, July 14, 2016 7:30 AM - 8:30 AM 13 15 28 0.37 46%54% Wed, July 13, 2016 5:00 PM - 6:00 PM 18 20 38 0.50 47%53% Tue, Jan 24, 2017 8:15 AM - 9:15 AM 18 17 35 0.48 51%49% Tue, Jan 24, 2017 4:00 PM - 5:00 PM 15 16 31 0.43 48%52% Wed, Jan 25, 2017 8:15 AM - 9:15 AM 28 26 54 0.50 52%48% Tue, Jan 24, 2017 5:30 PM - 6:30 PM 31 33 64 0.59 48%52% Wed, Jan 25, 2017 8:30 AM - 9:30 AM 17 11 28 0.37 61%39% Wed, Jan 25, 2017 5:30 PM - 6:30 PM 24 22 46 0.61 52%48% Tue, Jan 24, 2017 8:30 AM - 9:30 AM 23 11 34 0.39 68%32% Tue, Jan 24, 2017 5:45 PM - 6:45 PM 33 40 73 0.83 45%55% Average AM Peak Hour Trip Generation Rate and Inbound/Outbound Percentage 0.45 Average PM Peak Hour Trip Generation Rate and Inbound/Outbound Percentage 0.62 (57% in, 43% out) (50% in, 50% out) Floor & Decor - Boynton Beach 1974 High Ridge Road Boynton Beach, FL 33426 91,916 SF GLA Floor & Decor - North Houston 17211 North Freeway Houston, TX 77090 109,000 SF GLA Floor & Decor - Mall of Georgia 2918 Buford Drive Buford, GA 30519 87,825 SF GLA Floor & Decor - Potomac Mills 14041 Worth Avenue Woodbridge, VA 22192 76,384 SF GLA Floor & Decor - Wayne 77 Willowbrook Boulevard Wayne, NJ 07470 88,500 SF GLA Floor & Decor - Santa Ana 1801 East Dyer Road Santa Ana, CA 92705 72,914 SF GLA Floor & Decor - Arlington Heights 600 East Rand Road Arlington Heights, IL 60004 74,900 SF GLA CITY OF MEMO Public Works TO: Tom Lovelace, Planner FROM: Jodie Scheidt, PE, Civil Engineer DATE: August 10, 2022 SUBJECT: AV Floor & Decor Site Plan Review per plans dated 07/11/2022 General 1. All work and infrastructure within public easements or right of way shall be to City standards. 2. Provide a narrative of how the buildings will be constructed and any impacts. The narrative shall include the following: a. Shoring (if applicable) b. Material Storage. c. Haul routes to and from the site. d. Phasing 3. No construction work shall begin prior to a preconstruction meeting conference with a Public works and a Building Inspections representative. 4. Public Work Department (952-953-2400) shall be notified a minimum of 48 hours for any required water main shut downs and/or connections. Permits 5. Provide a copy of the executed Minnesota Department of Health, Minnesota Pollution Control Agency, Met Council, Department of Labor and any other required permits prior to construction. 6. Department of Labor and Industry (DOLI) shall review private utilities. 7. A right of way permit will be required for all work within public easements or right of way. 8. A Natural Resource Management Permit (NRMP) will be required prior to any land disturbing activity commences. 9. Since the site will be disturbing more than 1 acre and creating more than 1 acre of new impervious. The applicant will be subject to the requirements of the State NPDES Construction Storm water Permit. The applicant must provide proof of permit. 10. A Maintenance agreement for the proposed storm water management areas will be required and must be recorded. Grading & Drainage Plan 11. Final Grading Plans shall be reviewed and approved by City Engineer. 12. Provide the overall site composite Curve Number (CN) along with the impervious % on the area tabulation. 13. Provide a cross section of each proposed infiltration basin, include depth and filter media. 14. The City requires that for any new or redevelopment, at least 3 feet of freeboard between the anticipated high water elevation and the minimum building opening be maintained. Storm Sewer 15. Final Storm water Management Plan shall be reviewed and approved by City Engineer. 16. Final locations and sizes of Storm Sewer shall be reviewed with the final construction plans and approved by City Engineer. 17. Provide storm sewer calculations for storm water requirements. (Rational method including Hydraulic grade lines). 18. Submit a Storm water Management Checklist. The checklist can be found on the City’s website at https://www.cityofapplevalley.org/DocumentCenter/View/16258/Project-Submittal- Checklist_Fillable 19. Provide pretreatment device/s, such as a SAFL Baffle or approved equal and sump prior to discharging into the basins. Any sumps shall be privately maintained and routinely cleaned as the accumulated sediment will be from the private parking lots and roadways. 20. The storm sewer shows it is taking water from off-site. This would require a drainage and utility easement over all the storm sewer pipe from ST-101 to ST-105. The City will work with the applicant on an alternative design to avoid these easements. Sanitary Sewer and Water main 21. Final locations and sizes of Sanitary Sewer and Water main shall be reviewed with the final construction plans and approved by City Engineer. 22. Identify Irrigation service location(s) if applicable per SER-4. 23. Provide additional drawing showing required hydrant coverage for site. 24. Domestic water and fire service shall be split outside the existing building and the valves shall be located 1.5 times the height of the building away from the building or placed in location readily accessible per City of Apple Valley standard detail plate SER-6. Landscape and Natural Resources 25. Native seed mixes have a long establishment period (up to 3-4 years). The applicant may wish to plant plugs or larger plants to accelerate establishment and permit closure. Permit closure requires vegetation to be established to 70% density of perennial vegetation. 26. Plans do not show sufficient projection of stormwater infiltration BMPs during construction. Perimeter controls are needed around infiltration BMPs. Protections from compaction and clogging are recommended. 27. Stormwater flow to the bioretention basins should cut off until permanent vegetation is sufficiently established to prevent washout of seed and coverage of the basin bottom. Establishment time may be accelerated if switching to a plug planting instead of a seeding. kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651-645-4197 MEMORANDUM To: Jodie Scheidt, PE, Civil Engineer CC: Tom Lovelace, Planner From: Alan Catchpool, KH Project Manager, P.E. Kimley-Horn and Associates, Inc. Date: August 29, 2022 Subject: AV Floor & Decor Site Plan Review per plans dated 07/11/2022 Kimley-Horn has reviewed the comments provided by the City of Apple Valley, MN dated August 10, 2022, and has modified the plans accordingly. The comments and responses are listed below. Responses to comments are in bold italics. GENERAL 1. All work and infrastructure within public easements or right of way shall be to City standards. Noted 2. Provide a narrative of how the buildings will be constructed and any impacts. The narrative shall include the following: a) Shoring (if applicable) Not Applicable b) Material Storage. See attached Narrative c) Haul routes to and from the site. Haul routes still TBD, but only options in are from 155th or 157th to Gaslight Dr. d) Phasing Phasing still TBD, but easements/agreements require us to keep access open to Red Robin, with minimal disruption. 3. No construction work shall begin prior to a preconstruction meeting conference with a Public Works and a Building Inspections representative. Noted on Plans 4. Public Work Department (952-953-2400) shall be notified a minimum of 48 hours for any required water main shut downs and/or connections. Noted on Plans Page 2 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 PERMITS 5. Provide a copy of the executed Minnesota Department of Health, Minnesota Pollution Control Agency, Met Council, Department of Labor and any other required permits prior to construction. Noted and will provide approval letters once received. 6. Department of Labor and Industry (DOLI) shall review private utilities. Noted and will provide approval letters once received. 7. A right of way permit will be required for all work within public easements or right of way. Noted 8. A Natural Resource Management Permit (NRMP) will be required prior to any land disturbing activity commences. Noted and applied for. 9. Since the site will be disturbing more than 1 acre and creating more than 1 acre of new impervious. The applicant will be subject to the requirements of the State NPDES Construction Storm water Permit. The applicant must provide proof of permit. 10. Noted and will provide approval letters once received. 11. A Maintenance agreement for the proposed storm water management areas will be required and must be recorded. Noted GRADING AND DRAINAGE PLAN 12. Final Grading Plans shall be reviewed and approved by City Engineer. Noted 13. Provide the overall site composite Curve Number (CN) along with the impervious% on the area tabulation. Requested numbers added to C500 Plan STORM SEWER 14. Final Storm water Management Plan shall be reviewed and approved by City Engineer. Attached please find an updated Drainage Report for review and approval. 15. Final locations and sizes of Storm Sewer shall be reviewed with the final construction plans and approved by City Engineer. Noted Page 3 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 16. Provide storm sewer calculations for storm water requirements. (Rational method including Hydraulic grade lines). Attached please find an updated Drainage Report for review and approval. SANITARY SEWER AND WATER MAIN 17. Identify Irrigation service location(s) if applicable per SER-4. Irrigation will be stubbed out the SE corner of the building. Thank you for the thorough review of the layout. Please contact me with any questions regarding the responses. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Alan Catchpool, Project Manager, P.E. REV # INITIATED BY CODE REQ'D NARRATIVE C.D. REVF&D ARCH INITIAL ISSUE TO MATCH SHELL 01 R00 VERSION INDEX THIN BRICK VENEER: FELDHAUS R100DF (WHITE) THIN BRICK VENEER: FELDHAUS R800DF (GRAY) THIN BRICK VENEER: FELDHAUS R700DF (BRONZE) PAINT: (SW 2822) DOWNING SAND PAINT: (SW 7504) KEYSTONE GRAY PAINT: (SW 7674) PEPPERCORN PAINT: (SW 6868) REAL RED COPING: RED COPING: WHITE COPING: DARK GRAY STOREFRONT: DARK BRONZE FINISH LEGEND 8 7 6 5 4 3 2 19 1 FRONT ELEVATION SCALE: 1/16" = 1'-0" 2 REAR ELEVATION SCALE: 1/16" = 1'-0" 3 RIGHT ELEVATION SCALE: 1/16" = 1'-0" 4 LEFT ELEVATION SCALE: 1/16" = 1'-0" CB D FEA C BDE AF 1'-0" 87654321 9 402'-2" LEASE 50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4" 228'-4" LEASE 39'-0"46'-10"47'-6"47'-6"47'-6" B-3 B-2 B-1 B-3 B-2 B-1 B-3 B-3 B-1 227'-10" LEASE 38'-6"46'-10"47'-6"47'-6"47'-6" 50'-3 1/4"50'-3 1/4" B-3 B-2 B-1 B-3 B-2 B-1 402'-2" LEASE 50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4"50'-3 1/4" B-3 B-2 B-1 27'-9" A.F.F. T.O. CONC. PANEL 9'-0" A.F.F. B.O. ACCENT BAND/REVEAL 16'-0" A.F.F. B.O. ACCENT BAND/REVEAL 32'-3" A.F.F. T.O. CONC. PANEL 24'-7" A.F.F. T.O. TOWER 12'-6" A.F.F. B.O. CANOPY 17'-0" A.F.F. EXTERIOR LIGHTING 20'-7 3/8" A.F.F. ROOF (LOW POINT) 28'-0" A.F.F. T.O. PARAPET 32'-6" A.F.F. T.O. PARAPET 24'-4" A.F.F. T.O. CONC. PANEL 28'-7" A.F.F. T.O. CONC. PANEL 28'-10" A.F.F. T.O. TOWER 0'-0" FINISHED FLOOR 27'-9" A.F.F. T.O. CONC. PANEL 9'-0" A.F.F. B.O. ACCENT BAND/REVEAL 16'-0" A.F.F. B.O. ACCENT BAND/REVEAL 20'-7 3/8" A.F.F. ROOF (LOW POINT) 28'-0" A.F.F. T.O. PARAPET 0'-0" FINISHED FLOOR 19'-8" A.F.F. T.O. PILASTERS 27'-9" A.F.F. T.O. CONC. PANEL 9'-0" A.F.F. B.O. ACCENT BAND/REVEAL 16'-0" A.F.F. B.O. ACCENT BAND/REVEAL 17'-0" A.F.F. EXTERIOR LIGHTING 20'-7 3/8" A.F.F. ROOF (LOW POINT) 28'-0" A.F.F. T.O. PARAPET 0'-0" FINISHED FLOOR 4'-0" B.F.F. TRUCK WELL 0'-0" FINISHED FLOOR SIGNAGE LOCATION - TYP. PILASTERS - TYP. ENCLOSED TRASH COMPACTOR STOREFRONT - FRAME TO MATCH P-9 - TYP. METAL COPING - TYP. CPU BAY DOOR BEYOND - PAINT TO MATCH ADJACENT WALLS METAL COPING TO MATCH P-10 - TYP.EDGE OF DOCK LEVELER DOCK LEVELER W/ PIT METAL DOOR, PAINT TO MATCH ADJACENT WALL - TYP. ENTRANCE CANOPY TO MATCH P-10 CANOPY TO MATCH P-10 METAL COPING TO MATCH P-10 - TYP. METAL DOOR, PAINT TO MATCH ADJACENT WALL - TYP. METAL DOOR, PAINT TO MATCH ADJACENT WALL - TYP. METAL DOOR, PAINT TO MATCH ADJACENT WALL - TYP. CUSTOMER PICK-UP STOREFRONT DOOR AND CANOPY PAINT ALL RAILINGS P-10, TYP. ROOF LINE BEYOND ROOF LINE BEYOND ROOF LINE BEYOND ROOF LINE BEYONDROOF LINE BEYOND SCREEN WALL PROPANE STORAGE GAS METER RECYCLING ENCLOSURE RECYCLING ENCLOSURE BEYOND LAMBS TONGUE DRAIN - TYP. LAMBS TONGUE DRAIN - TYP. CPU CANOPY BEYOND B-3 B-2 B-1 B-3 B-2 B-1 PROPANE STORAGE 10'-0" A.F.F. SCREEN WALL 27'-9" A.F.F. T.O. CONC. PANEL 9'-0" A.F.F. B.O. ACCENT BAND/REVEAL 16'-0" A.F.F. B.O. ACCENT BAND/REVEAL 17'-0" A.F.F. EXTERIOR LIGHTING 20'-7 3/8" A.F.F. ROOF (LOW POINT) 28'-0" A.F.F. T.O. PARAPET ENTRANCE CANOPY BEYOND 0'-0" FINISHED FLOOR 19'-8" A.F.F. T.O. PILASTERS 19'-8" A.F.F. T.O. PILASTERS B-3 B-3 B-2 B-1 B-2 B-3 B-2 10'-0" A.F.F. B.O. CANOPY M-1 M-2 M-3 M-3 SIGNAGE LOCATION - TYP.M-1 METAL COPING - TYP. METAL COPING - TYP. M-1 M-1 RECYCLING ENCLOSURE ADDRESS LOCATION ENTRANCE AND STEEL PIPE BRACING BEYOND EXTERIOR ELEVATIONS RAB RMT ALL ARCHITECTURAL AND ENGINEERINGDRAWINGS ARE IN CONFIDENCE ANDDISSEMINATION MAY NOT BE MADE WITHOUTPRIOR WRITTEN CONSENT OF THE ARCHITECT.ALL COMMON LAW RIGHTS OF COPYRIGHT ANDOTHERWISE ARE HEREBY SPECIFICALLY RESERVED 15630 CEDAR AVENUE APPLE VALLEY, MN 55124 ISSUE DRAWN: CHECKED: PROJECT SHEET AREA : JOB NUMBER:2022.0302.00 77,725SF OWNER 2500 WINDY RIDGE PARKWAY, SE ATLANTA, GA 30339 PHONE:(404) 471-1634 ISSUE DATE: STORE NUMBER:T.B.D. XX/XX/XXXXAPPLEVALLEY,MINNESOTASTORE#TBDPROTOTYPE:2019 Q1 ISSUE 05/20/2022 155TH STREET WESTC.S.A.H. NO. 23 (CEDAR AVE.)OWNER: AP APPLE VALLEY, LTD. PARTNERSHIP(MOVIE THEATER)(GAS STATION)OWNER: B & S LAND DEV., LLC(PUBLIC STREET)(PUBLIC STREET) (PUBLIC STREET)(EAST-WEST ACCESS DRIVEACCESSOWNER: MAIORELLO HOLDINGS, INC.(RED ROBIN)OWNER:FAIRVIEW HOSPITAL HEALTH CARE SERVICES(MEDICAL CLINIC)(TRANSIT STATION) OWNER: APPLE VALLEY ECONOMIC AUTHORITY (APAR T M E N T S) OWN E R: D A K O T A C O U N T Y C D A ACCESSGASLIGHT DRIVE 13A A A A A A A A A A A A A A A A AA 14 14 14 A A1616 16 16 16 A A 17 17 17 17 17 17 17 17 20 20 20 20 20 20 A A A A A 2222 22 22 18 18 A A PID#01-16253-01-020 BENCHMARKS: ELEVATIONS BASED ON INFORMATION AS SHOWN ON THE MNDOT GEODETIC WEBSITE. SURVEY DISK DAKOTA RESET WITH AN ELEVATION OF 952.47 WAS USED TO ESTABLISH VERTICAL CONTROL FOR THIS SURVEY (NAVD 88) CONTACT: KIMLEY HORN ATTN: ALAN CATCHPOOL 767 Eustis Street, Suite 100 St. Paul, MN 55114 Phone: 612.414.5011 Email: alan.catchpool @kimley-horn.com VICINITY MAP LEGEND:UNDERGROUND UTILITIES NOTES: THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. GOPHER STATE ONE CALL LOCATE TICKET NUMBER(S) 220680279. SOME MAPS WERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH WE ARE UNAWARE MAY EXIST. OTHER UTILITIES MAY EXIST ON THIS SITE THAT WERE NOT MARKED UP. KH22015 SURVKH015 EXISTING CONDITIONS SURVEY COUNTY/CITY: REVISIONS: PROJECT LOCATION: LAND SURVEYING, INC. CORNERSTONE Suite #200 1970 Northwestern Ave Stillwater, MN 55082 Phone 651.275.8969 Fax 651.275.8976 dan@ cssurvey .net DATE REVISION PROJECT NO. FILE NAME 15630 CALL BEFORE YOU DIG! TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002 Gopher State One Call THERE ARE 265 VISIBLE PARKING STALLS DESIGNATED ON THIS PARCEL INCLUDING 8 HANDICAP STALL. THERE ARE MANY ADDITIONAL PARKING SPACES WHICH ARE UNMARKED DUE TO STRIPE PAINT BEING WORN OFF. EXISTING PARKING: THIS PROPERTY LIES WITHIN THE UNSHADED ZONE X, AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN, AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27037C0202E HAVING AN EFFECTIVE DATE OF 12/02/2011. FLOOD INFORMATION: LEGAL DESCRIPTION: CEDAR AVE. EASEMENT NOTES: CERTIFICATION: ZONING REPORT NOT PROVIDED ZONING AND SETBACKS: AREA: TOTAL AREA = 280,925 SQ. FT. / 6.45 ACRES To: AP Apple Valley Limited Partnership, a Texas limited partnership, and First American Title Insurance Company National Commercial Services as agent for First American Title Insurance Company and their successors and assigns: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 7(a), 7(b)(1), 7(c) 8, 9, 11(b), 14, 16, 17, 18, 19, and 21 of Table A thereof. The field work was completed on March 31, 2022. CORNERSTONE LAND SURVEYING, INC. Dated: 04-05-2022 Revised: By :____________________________ Daniel L. Thurmes Minnesota License No. 25718 CITY OF APPLE VALLEY DAKOTA COUNTY The following Legal Description is as shown on First American Title Insurance Company National Commercial Services as agent for First American Title Insurance Company Title Commitment No. NCS-1109451-CHAR, dated January 18, 2022. Lot 2, Block 1, Carroll Center Fourth Addition, Dakota County, Minnesota. Abstract Property 04-05-2022 INITIAL ISSUE 04-26-2022 EXH C/D REV 15630 CEDAR AVENUE APPLE VALLEY, MINNESOTA 0 NORTH 40 80 NOT TO SCALE NORTH SITE UNDERGROUND ELECTRIC UNDERGROUND CABLE TV UNDERGROUND FIBER OPTIC UNDERGROUND TELEPHONE OVERHEAD UTILITY UNDERGROUND GAS SANITARY SEWER STORM SEWER WATERMAIN FENCE CURB [TYPICAL] CONTOURS FOUND MONUMENT SET 1/2" IRON PIPE MARKED RLS NO. 25718 CABLE TV PEDESTAL AIR CONDITIONER ELECTRIC MANHOLE ELECTRIC METER ELECTRIC PEDESTAL ELECTRIC TRANSFORMER LIGHT POLE POWER POLE GAS MANHOLE GAS METER TELEPHONE MANHOLE TELEPHONE PEDESTAL SANITARY CLEANOUT SANITARY MANHOLE CATCH BASIN FLARED END SECTION STORM MANHOLE FIRE DEPT. CONNECTION HYDRANT CURB STOP WATER MANHOLE WATER METER POST INDICATOR VALVE WATER VALVE BOLLARD FLAG POLE MAIL BOX TRAFFIC SIGN UNKNOWN MANHOLE SOIL BORING SPOT ELEVATION TRAFFIC SIGNAL CONIFEROUS TREE DECIDUOUS TREE First American Title Insurance Company National Commercial Services as agent for First American Title Insurance Company Title Commitment No. NCS-1109451-CHAR, dated January 18, 2022.as listed on this survey was relied upon for matters of record. Other easements may exist that were not shown in this commitment and are not shown on this survey. 1. BEARINGS ARE BASED ON COORDINATES SUPPLIED BY THE DAKOTA COUNTY SURVEYORS OFFICE. BEARINGS ARE DIFFERENT THAN SHOWN ON THE RECORDED PLAT. ALL INTERIOR ANGLES MATCH THE RECORDED PLAT ANGLES 2. UNDERGROUND UTILITIES SHOWN PER GOPHER STATE ONE CALL LOCATES AND AS-BUILTS PLANS PROVIDED BY THE CITY OF APPLE VALLEY PUBLIC WORKS DEPARTMENT. 3. THERE MAY BE SOME UNDERGROUND UTILITIES; GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 4. SURVEY WAS CONDUCTED IN WINTER SNOW AND ICE CONDITIONS. ADDITIONAL IMPROVEMENTS WHICH ARE NOT SHOWN AND OF WHICH WE UNAWARE MAY EXIST. SURVEY NOTES: 8. SUBSTANTIAL FEATURES OBSERVED IN THE PROCESS OF CONDUCTING THE FIELDWORK ARE SHOWN ON THE SURVEY. 16. THERE IS NO OBSERVABLE EVIDENCE OF RECENT EARTH MOVING WORK OR BUILDING CONSTRUCTION ON THE SUBJECT PROPERTY. 17.WE ARE UNAWARE OF ANY RIGHT OF WAY CHANGES. 18. ALL APPURTENANT EASEMENTS LISTED IN TITLEWORK ARE SHOWN HEREIN. TABLE A NOTES: The following exceptions appear on the First American Title Insurance Company National Commercial Services as agent for First American Title Insurance Company Title Commitment No. NCS-1109451-CHAR, dated January 18, 2022: 9.Easement Agreement per Doc. No. 594459, also as contained in Dakota County Road of Way Map No. 64 per Doc. No. 880332 does not affect the subject property. (Right of way is entirely contained within the existing right of way of C.S.A.H. No. 23 (Cedar Avenue). 10.Roadways and Streets Easement per Doc. No. 711806 does not affect the subject property. 11.Highway Easement per Doc. No. 914787 does not affect the subject parcel as it lies entirely within the existing right of way of C.S.A.H. No. 23. 12.Final Certificate per Doc. No. 1199564 does not affect the subject parcel. 13.Drainage and utility easements as shown on the recorded plat of Carroll Center Second Addition per Doc. No. 1216391. (AS SHOWN ON SURVEY). 14.Sidewalk Easement per Doc. No. 1216394. (AS SHOWN ON SURVEY). 15.Ingress, Egress and Driveway Easement per Doc. No. 1216395 does not affect the subject property. 16.Sidewalk and Trail Easement per Doc. No. 1475680. (AS SHOWN ON SURVEY) 17.Sight Line Easement per Doc. No. 1475681. (AS SHOWN ON SURVEY) 18.Signage and Access Easement per Doc. No. 1475682. Partially released by by Doc. No. 3084116. (AS SHOWN ON SURVEY - the access portion of this easement appears to have errors, but is covered by other reciprocal access easements). 19.Terms and conditions of and easements as contained in Reciprocal Cross Parking Easement per Doc. No. 1475683. (NOT SHOWN ON SURVEY, EASEMENT COVERS ENTIRE PROPERTY). 20.Terms and conditions of Declaration of Easements and Covenants per Doc. No. 1688503. Not specifically shown - no legal descriptions are given. Current physical location of the East - West access drive over Lot 2 is shown per field location. 21.Not survey related. 22.Dakota County Road Right of Way Map No. 324, per Doc. No. 2725922. As affected by Land Surveyor’s Certificate of Correction to Map per Doc. No. 3212135. Easements as contained in Final Certificate per Doc. No. 3281486 (AS SHOWN GRAPHICALLY). 23-26. Not survey related. A NOT SHOWN IN TITLE COMMITMENT. DRAINAGE AND UTILITY EASEMENTS/RESTRICTED ACCESS PER PLAT OF CARROLL CENTER 4TH ADDITION 13 14 18 20 17 16 22 A I T E M: 6.A. P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :September 21, 2022 S E C T I O N:Other Business Description: Review of Upcoming S chedule and Other Updates S taff Contact: B reanna Vincent, Department Assistant Department / Division: Community Development Department AC T I O N RE Q UE S T E D: N/A S UM M ARY: Next P lanning Commission Meetings: Wednesday, October 5, 2022 - 7:00 p.m. Public hearing applications due by 9:00 a.m. on Wednesday, September 7, 2022. Site plan, variance applications due by 9:00 a.m. on Wednesday, September 21, 2022. Wednesday, October 19, 2022 - 7:00 p.m. Public hearing applications due by 9:00 a.m. on Wednesday, September 21, 2022. Site plan, variance applications due by 9:00 a.m. on Wednesday, October 5, 2022. Next City Council Meetings: T hursday, September 22, 2022 - 7:00 p.m. T hursday, October 13, 2022 - 7:00 p.m. B AC K G RO UND: N/A B UD G E T I M PAC T: N/A