HomeMy WebLinkAbout07/17/2013•
00
00
City of Apple
Valley
This agenda is subject to change by deletion or addition to items until approved by the Planning
Commission on the date of the meeting.
1. CALL TO ORDER
2. APPROVAL OF AGENDA
3. APPROVAL OF MINUTES OF JUNE 19, 2013
4. CONSENT ITEMS
--NONE--
5. PUBLIC HEARINGS
A. Quarry Ponds — Public hearing to consider rezoning of 46 acres from "SG" (Sand and Gravel)
to "PD" (Planned Development) and subdivision of 56 acres into 107 single-family lots and four
(4) outlots continued. (PC13-27-ZS)
LOCATION: North side of CSAH 46 approximately 1/4-mile west of Pilot Knob Road
PETITIONER: Arcon Land II, LLC and Fischer Sand and Aggregate, LLP
6. LAND USE/ACTION ITEMS
8. ADJOURNMENT
Meeting Location: Municipal Center
7100 147th Street West
Apple Valley, Minnesota 55124
7. OTHER BUSINESS
JULY 17, 2013
PLANNING COMMISSION TENTATIVE AGENDA
7:00 P.M.
A. Dalseth Accessory Building Setback Variance — Consideration of a variance to reduce side
yard setback from 20' to 5' for a 24' x 16' accessory building. (PC13-23-V)
LOCATION: 4869 Dominica Way
PETITIONER: Jennifer and Pascal Dalseth
A. Hunter Woods Sketch Plan — Review of a sketch plan that proposes rezoning from "R-1"
(Single family, 40,000 min lot) to "R-3" (Single family, 11,000 min lot) and preliminary plat to
create 13 single family lots, located at 12842 and 12866 Galaxie Avenue, by Hunter Emerson,
LLC.
B. Review of upcoming schedule and other updates.
NEXT PLANNING COMMISSION MEETINGS
Wednesday, August 7, 2013
Regular Scheduled Meeting
-Public hearing applications due by 9:00 a.m. on Wednesday, July 10, 2013
-Site plan, variance applications due by 9:00 a.m. on Monday, July 29, 2013
Wednesday, August 21, 2013
Regular Scheduled Meeting
-Public hearing applications due by 9:00 a.m. on Wednesday, July 24, 2013
-Site plan, variance applications due by 9:00 a.m. on Monday, August 12, 2013
NEXT CITY COUNCIL MEETINGS
7:00 P.M.
7:00 P.M.
Thursday, July 25, 2013
Regular Scheduled Meeting 7:00 P.M.
Thursday, August 8, 2013
Regular Scheduled Meeting 7:00 P.M.
Regular meetings are broadcast live on Charter Communications Cable, Channel 16. Agendas are also
available on the City's Internet Web Site http://www.cityofapplevalley.org.
1. CALL TO ORDER
The City of Apple Valley Planning Commission meeting was called to order by Chair Melander at
7:00 p.m.
Members Present: Tom Melander, Ken Alwin, Tim Burke, Keith Diekmann, Paul Scanlan, David
Schindler and Brian Wasserman.
Members Absent: none
Staff Present: City Attorney Sharon Hills, Community Development Bruce Nordquist, City Planner
Tom Lovelace, Planner Kathy Bodmer, Assistant City Engineer David Bennett and Department
Assistant Joan Murphy.
2. APPROVAL OF AGENDA
Chair Melander asked if there were any changes to the agenda. Hearing none he called for a
motion.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Diekmann, approving
the agenda. Ayes - 6 - Nays - 0.
3. APPROVAL OF MINUTES MAY 15, 2013.
Chair Melander asked if there were any changes to the minutes. Hearing none he called for a
motion.
MOTION: Commissioner Burke moved, seconded by Commissioner Alwin, approving the
minutes of the meeting of May 15, 2013. Ayes - 5 - Nays — 0. Abstain — 1
(Wasserman).
4. CONSENT ITEMS
--NONE--
5. PUBLIC HEARINGS
CITY OF APPLE VALLEY
PLANNING COMMISSION MINUTES
JUNE 19, 2013
A. Quarry Ponds — Public hearing to consider rezoning of 46 acres from "SG" (Sand and
Gravel) to "PD" (Planned Development) and subdivision of 56 acres into 107 single-family lots
and four (4) outlots. (PC13-27-ZS)
LOCATION: North side of CSAH 46 approximately 1/4-mile west of Pilot Knob Road
PETITIONER: Arcon Land II, LLC and Fischer Sand and Aggregate, LLP
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 19, 2013
Page 2 of 5
Chair Melander opened the public hearing at 7:02 p.m.
City Attorney Sharon Hills stated two letters were received by the City today and the Planning
Commission should accept those letters on record. She said the Attorney's office needs time to
respond to the letters and recommended the public hearing be continued to the next meeting.
MOTION: Commissioner Diekman moved, seconded by Commissioner Burke, continuing the
public hearing until the meeting of July 17, 2013. Ayes - 6 - Nays — 0.
Commissioner Schindler arrived at 7:04 p.m.
6. LAND USE/ACTION ITEMS
A. Dalseth Accessory Building Setback Variance — Consideration of a 49' variance from the
75' "SH" (Shoreland) setback and a 15 variance from the 20' side yard setback to construct a 24'
x 16' (384 sq. ft.) accessory building with a 245 sq. ft. wrap around deck. (PC13-23-V)
LOCATION: 4869 Dominica Way
PETITIONER: Jennifer and Pascal Dalseth
Planner Kathy Bodmer presented the request from the petitioner for two variances that would allow
the construction of a 24' x 16' (384 sq. ft.) accessory building with a 7' x 23' and 7' x 12' (245 sq. ft.)
wrap-around deck at 4869 Dominica Way West:
• A variance from the 75' "SH" (Shoreland) setback to locate the building 26' from the
ordinary high water level of Farquar Lake (899.2' elevation).
• A variance from the 20' side yard setback to locate the building 5' from the side property
line.
She stated the petitioners requested the variances to construct an accessory structure for storage of
watercraft, including a boat, personal watercraft, and other sporting equipment. The plans show
that a seven foot (7') wrap-around deck would be constructed on the north and east sides of the
building. The subject property abuts Farquar Lake and lies within the "SH" (Shoreland) zoning
district.
The City of Apple Valley's SH zoning district is more restrictive than the State rules and does not
include an exception for water-oriented accessory buildings for boat and equipment storage. As a
result, the Dalseth variances would need to be considered in light of whether the petitioner has met
the "practical difficulties" test, not the State Shoreland Management Rules.
The size and shape of the property along with the placement and angles of the home limits the
potential locations for an accessory building on the property. The location the petitioners selected
for the building is a flat area that is part of a tiered landscape area on the west side of the property.
Discussion followed.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 19, 2013
Page 3 of 5
Pascal Dalseth provided additional information.
Motion: Commissioner Diekmann moved, seconded by Commissioner Alwin, recommending
approval allowing the construction of a 24' x 16' 384 sq. ft. accessory building at
4869 Dominica Way West, subject to compliance with all City Codes and the
conditions as listed. Ayes - 6 - Nays — 1 — (Wasserman).
Additional discussion followed.
Ms. Hills suggested a motion be made to withdraw the first motion because the application was for
a setback variance. The building structure itself would follow building permit requirements and
would be followed up by the Inspection Department during construction.
Motion: Commissioner Diekmann moved, second by Commissioner Burke, withdrawing the
first motion. Ayes - 7 - Nays - 0.
Motion: Commissioner Diekmann moved, second by Commissioner Alwin, recommending
approval of a 49' variance from the 75 "SH" (Shoreland) setback to locate the
building 26' from the ordinary high water level of Farquar Lake (899.2' elevation)
with the conditions of the variance with the findings of the topography, the layout of
the land and the existing structure as previously discussed. No deck shall be added.
Ayes - 6 - Nays — 1 — (Wasserman).
Motion: Commissioner Diekmann moved, second by Commissioner Alwin, recommending
approval of a 15' variance from the 20' side yard setback to locate the building 5'
from the side property line. Ayes - 1 - Nays — 6 — (Alwin, Burke, Diekmann,
Melander, Scanlan, and Wasserman). Motion failed.
7. OTHER BUSINESS
A. Enterprise Rent-A-Car Parking Lot Setback Variance Sketch Plan — Discussion of
proposed amendments to PD-254 for parking lot expansion located at 15136 Galaxie
Avenue.
Planner Kathy Bodmer introduced the request from Enterprise Rent-a-Car, 15136 Galaxie Avenue,
that they would like to expand the parking lot in order to provide additional customer drop-off
parking spaces in the front of its building. Currently, customers park on the west side of the site
which has a limited number of parking spaces.
She stated the petitioner would like to extend the southern curb of the drive entrance to align with
the existing southern curb line of the outdoor storage area. This would expand the parking area by
about 880 sq. ft. and provide approximately five additional parking spaces. The petitioner would
have to obtain a code amendment in order to reduce the setback requirement due to the property
being located within a Planned Development zoning district. Variances cannot be issued for
properties zoned PD.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 19, 2013
Page 4 of 5
She stated no official action is requested and that the petitioner is considering applying for the
necessary code amendment and would like to discuss the project with the Planning Commission.
Ben Bonde, Enterprise, provided additional information.
Discussion followed.
B. USAgain Clothing Boxes — Discussion on whether to amend City Code to allow for the
placement of clothing recycling bins within the City.
City Planner Tom Lovelace provided for review and discussion the request from USAgain
regarding possible changes to the City's zoning code to allow for the placement of recycling
collection bins in the City. USAgain is a for profit clothing recycling business that collects
unwanted textiles and resells them in the U.S. and abroad. The company would offer a small
compensation to business/property owners who allow the bins on their property, which is about 1-2
cents per pound for the clothing. They distribute some of the clothing to secondhand clothing
outlets such as thrift stores; some stays in the United States and some are sent overseas. Any non-
reusable clothing is recycled into insulation or wiping rags or broken down into reclaimed fiber.
The company is headquartered in Chicago with 11 division offices and operates over 10,000
collection bins in 15 states.
He stated no official action is needed and that the applicant is seeking input from the Planning
Commission.
Brad Berg, USAgain, provided additional information.
Discussion followed.
C. Review of upcoming schedule and other updates.
Community Development Director Bruce Nordquist stated that the next Planning Commission
meeting would take place Wednesday, July 17, 2013, at 7:00 p.m.
8. ADJOURNMENT
Hearing no further comments from the Planning Staff or Planning Commission, Chair Melander
asked for a motion to adjourn.
MOTION: Commissioner Alwin moved, seconded by Commissioner Diekmann to adjourn the
meeting at 8:49 p.m. Ayes - 6 - Nays - 0.
ctfully Submitted,
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 19, 2013
Page 5 of 5
Joan Murphy, Planning Department Assistant
Approved by the Apple Valley Planning Commission on
APPLE VALLEY PROJECT SUMMARY
QUARRY PONDS
Case Number: PC13-27-ZS
Staff Reviewer: Thomas
Lovelace
and
Applicant: A,rcon Land II, LLC
Aggregate, L..LP
22, 2013
Application Date: May
Meeting Date: July 17, 2013
Petition for:
Purpose:
• Rezoning
• Subdivision
The applicant is requesting a rezoning of approximately 46 acres of land from "SG" (Sand and
Gravel) to "PD" (Planned Development) and the subdivision by plat of 56.64 acres of land into 107
single-family residential lots and four (4) outlots. Subdivision also will include the dedication of
right-of-way for local streets to serve the individual lots within the proposed plat; and the right-of-
way for Johnny Cake Ridge Road, the south half of 157 Street West, and the north half of CSAH
46 (County State Aid Highway) right-of-way, all of which will abut the development. The project
site is located along the north side of CSAH 46, approximately 1 /4-mile west of Pilot Knob Road.
Summary of The applicant submitted a request for an amendment to the 2030 Land Use Map to re-designate the
Issues: property east of Johnny Cake Ridge Road from "MD" subject property "LD" (Low Density
Residential/2-6 units per acre). The Metropolitan Council has reviewed and approved the proposed
amendment to the 2030 Land Use Map. The next step is the adoption of the proposed amendment
by the City Council.
The applicant is requesting a rezoning of the 46 acres from "SG" to a "PD" (Planned Development)
designation that will include establishing the uses, area requirements, and performance standards
for the planned development district, consistent with the proposed development. The planned
development ordinance will address such things as a minimum lot size of 8440 sq. ft. and lot width
of 65 feet. This is different than our typical "R-3" zoning district which has minimum lot area of
11,000 sq. ft. and lot width of 80 feet.
A conditional use permit (C.U.P.) has been approved for the "SG" zoned property within the
proposed development, which allows sand and gravel mining. This proposal will end the ability
of Fischer Sand and Aggregate, the current owner, to mine the property. Therefore, the owner
will need to release the sand and gravel mining C.U.P. on the subject property. Staff will work
with the developer and property with the amendment of the C.U.P.
Mining operations will continue north of the proposed development, which could result in
potential conflicts. This will need to be addressed through the zoning code regulations that
establish setbacks between residential property and mining operations, operating hours, and
screening.
157 Street should be extended from the Regatta Development through to Pilot Knob Road.
Because this corridor will house sewer, water and storm sewer utilities, dedication of full right-of-
way along the corridor shall be required. Also, a gap of land, 15-19 feet wide, exists between the
proposed development and the Regatta development to the west. Ownership of this property is
currently in dispute, which may need to be addressed during the final platting of the subject
property.
Johnny Cake Ridge Road will be extended from CSAH 46 to the northern extent of the plat. Left
and right turn lanes from CSAH 46 to Johnny Cake Ridge Road will be required. Design and
construction of the turn lanes will require coordinated with Dakota County.
Storm sewer pipes will be installed to collect water from lots in the subdivision and transport it to
the storm water ponding area in Outlots A and B. Water quality provisions will be identified and
incorporated into the reconfiguration of the pond.
Summary
of Issues: Outlot A, an area identified as "City of Apple Valley" on the preliminary plat is the location of an
existing storm water pond located on approximately 9.88 acres. A portion of the ponding area
will be filled to accommodate for the construction of Johnny Cake Ridge Road. This will require
the ponding area to be re-configured and extended east into Outlot B. Design calculations have
not been presented that assures that the new design will be sufficient to meet the City's storm
water ponding needs.
Outlot C, a thirteen-foot wide strip of land located between Lot 11, Block 2 and Lot 1, Block 7 is
proposed to be the location of a trail that will connect to the existing trail in the Quarry Point Park
to the east of the plat. It will also be the location of a storm water sewer line.
Outlot D is a small piece of property sandwiched between future Johnny Cake Ridge Road, Street
A and the City-owned property. The applicant would like the City to consider the incorporation
of the northeast corner of the City-owned property with Outlot D, which would create three
additional lots. If the platting of the three additional lots does not occur, Outlot D should be
incorporated into Outlot B.
No drainage and utility easements have been identified on the preliminary plat. Utility and
drainage easements abutting public street rights-of-way and centered on rear or side lot lines
shall be at least ten feet wide or wider as may be required by the City. Drainage and utility
easements should also be established over Outlots A, B, and C.
Recommended
Action: Continue the public hearing, receive comments and close the public hearing. It is the policy
of the Planning Commission not to act on a public hearing item the night of the public
hearing.
The applicant has submitted a letter requesting that the Planning Commission act on their
proposed rezoning and subdivision request on July 17. Staff continues to meet with the
applicant to iron out issues related to street and utility improvements for the project. If
these issues are resolved and no further questions or concerns are raised during the public
hearing that require additional information, staff will be prepared to present a
recommendation on 17th.
Property Location:
Legal Description:
Comprehensive Plan
Designation
Zoning Classification
Existing Platting
Current Land Use
Size:
Topography:
Existing Vegetation
Other Significant
Natural Features
Adjacent
Properties/Land Uses
Located along the north side of 160 Street West (CSAH 46), west of Pilot Knob Road
Part of the Southwest 'A of the Southeast 1 /4 of Section 35
"MD"(Medium Density Residentia1/6-12 units per acre)
"SG" (Sand and Gravel) AND "P" (Institutional)
Unplatted
Farmland and storm water ponding area
56.64 acres
Flat
No significant vegetation, the property is used for crop production storm water storage
None
NORTH
SOUTH
EAST
WEST
QUARRY PONDS
PROJECT REVIEW
Existing Conditions
Fischer Sand and Aggregate Mining Operation
Comprehensive Plan
Zoning/Land Use
Single-Family Residential in Lakeville
Comprehensive Plan
Zoning/Land Use
Quarry Point Park
Comprehensive Plan
Zoning/Land Use
Regatta Residential Development
Comprehensive Plan
Zoning/Land Use
"HD" (High Density Residential> 12 units per acre
"SG" (Sand and Gravel)
Low Density Residential - < 3 units per acre
"RS-3" (Single-Family Residential)
"P" (Parks and Open Space
"P" (Institutional)
Development Project Review
"LD" ( Low Density Residential/2-6 units per acre
"PD-632" (Planned Development)
Comprehensive Plan: The property is currently guided "MD" (Medium Density Residential/6-12 units per acre).
"MD" land uses include townhomes, other attached single-family dwellings, and low-rise apartments and
condominiums at densities that range between six to twelve units per acre. This designation fits with the "M-4", "M-
5", "M-6" (Multi-Family) and "PD" (Planned Development) zoning districts.
The applicant submitted a request for an amendment to the 2030 Land Use Map to re-designate the property east of
Johnny Cake Ridge Road from "MD" subject property "LD" (Low Density Residential/2-6 units per acre). A public
hearing regarding this amendment was held on April 17, 2013, at which time the Planning Commission voted to
recommend approval of the proposed amendment. The City Council reviewed the request at their meeting of April
25, 2013 and authorized submittal of the amendment to the Metropolitan Council. The Metropolitan Council has
reviewed and approved the proposed amendment to the 2030 Land Use Map. The next step will be the adoption of the
proposed amendment by the City Council.
Livable Communities Impact: The proposal will add 107 market-rate single family dwelling units to the City's
existing housing stock, which is consistent with the Livable Communities Act.
Zoning: Approximately 46 acres of the subject property is currently zoned "SG" (Sand and Gravel), which allows
limited agricultural pursuits, including crop and plant production and commercial greenhouses and nurseries as
permitted uses, and sand and gravel mining as a conditional use. No mining has occurred on this property with the
exception of some stockpiling and processing of black dirt in the northeast corner. The remainder of the site has been
used for raising crops. The remainder of the site is zoned "P" (Institutional) and is the location of a storm water
ponding area.
The applicant is requesting a rezoning of the 46 acres from "SG" to a "PD" (Planned Development) designation that
will include establishing the uses, area requirements, and performance standards for the planned development district,
consistent with the proposed development. The City code defines a planned development as "an urban development
often having two or more principal uses and having specialized performance standards relating to an overall approved
development plan to provide for optimal land use relationship". The criteria for approval are as follows:
• The proposed development is in conformance with the comprehensive guide plan of the City and
encompasses an area of not less than 20 acres.
• The proposed development plan is designed in a manner so as to form a desirable and unified environment
within its own boundaries.
• The planned development will not create an excessive burden on parks, schools, streets and other public
facilities and utilities which serve or are proposed to serve the planned development.
The planned development ordinance will address such things as a minimum lot size of 8440 sq. ft. and lot width of 65
feet. This is different than our typical "R-3" zoning district which has minimum lot area of 11,000 sq. ft. and lot width
of 80 feet.
A conditional use permit (C.U.P.) has been approved for the "SG" zoned property within the proposed
development, which allows sand and gravel mining. This proposal will end the ability of Fischer Sand and
Aggregate, the current owner, to mine the property. Therefore, the owner will need to release the sand and gravel
mining C.U.P. on the subject property. Staff will work with the developer and property with the amendment of the
C.U.P.
Mining operations will continue north of the proposed development, which could result in potential conflicts. This
will need to be addressed through the zoning code regulations that establish setbacks between residential property
and mining operations, operating hours, and screening.
Preliminary Plat: The preliminary plat indicates that the subject property will be subdivided into 107 single-family
lots and four (4) outlots. Included in this subdivision will be the dedication of local streets that will directly serve the
individual lots within the development, as well as the dedication of the necessary right-of-way for Johnny Cake Ridge
Road and the south half of 157 Street West, two collector streets, and the north half of the right-of-way for the
existing CSAH 46.
157 Street will be extended from the Regatta Development through to Pilot Knob Road. This right-of-way corridor
will also house sanitary sewer, water and storm sewer utilities. This will require dedication of full right-of-way along
the corridor.
Also, a gap of land, 15-19 feet wide, exists between the proposed development and the Regatta development to the
west. Ownership of this property is currently in dispute. This may be an issue during the final platting of the
subject property. However, the City Attorney has stated in an attached memorandum, that the Planning
Commission may proceed with the review of the development request and make a recommendation to the City
Council.
Johnny Cake Ridge Road will be extended from CSAH 46 to the northern extent of the plat. Left and right turn lanes
from CSAH 46 to Johnny Cake Ridge Road will be required. Design and construction of the turn lanes will require
coordination with the developer, City and Dakota County.
2
Out lot A, an area identified as "City of Apple Valley" on the preliminary plat is the location of an existing storm water
pond located on approximately 9.88 acres. A portion of the ponding area will be filled to accommodate for the
construction of Johnny Cake Ridge Road. This will require the ponding area to be re-configured and extended east
into Outlot B. Design calculations have not been presented that assures that the new design will be sufficient to meet
the City's storm water ponding needs.
Outlot C, a thirteen-foot wide strip of land located between Lot 11, Block 2 and Lot 1, Block 7 is proposed to be the
location of a trail that will connect to the existing trail in the Quarry Point Park to the east of the plat. It will also be
the location of a storm water sewer line.
Outlot D is a small piece of property sandwiched between future Johnny Cake Ridge Road, Street A and the City-
owned property. The applicant would like the City to consider the incorporation of the northeast corner of Outlot A
with Outlot D, which would create three additional lots. If the platting of the three additional lots does not occur,
Outlot D should be incorporated into Outlot B.
The preliminary plat also shows the addition of a small portion of the City's property being incorporated into Lots 13
and 14 of Block 1.
On July 11, the City Council will consider a resolution that will allow the City to continue its review of the
preliminary plat with the City-owned property included. Staff will present the Council's decision to the Commission
on July 17.
No drainage and utility easements have been identified on the preliminary plat. Utility and drainage easements
abutting public street rights-of-way and centered on rear or side lot lines shall be at least ten feet wide or wider as
may be required by the City. Drainage and utility easements should also be established over Outlots A, B, and C.
The proposed plat will abut CSAH 46, a road that is classified as an arterial street. Three lots will directly abut the
right-of-way. The subdivision code requires that where a plat is located along a freeway, major arterial or other
area which generates high volumes of noise, the subdivider shall be required to prepare a plan to provide noise
abatement. The plan shall provide for the construction of earth berms, dense vegetation, walls or the combination
thereof or similar means which shall be reviewed and approved by the City and required to be constructed by the
subdivider as a part of the development of the plat.
Staging Plan: The applicant is proposing to develop the property in two phases. The first phase will be the south
55 lots and the ponding area. The second phase will include the remaining lots. Staff has concern regarding access
to several lots within the first phase east of Johnny Cake Ridge Road, and would suggest that Lots 1-9, block 5 and
Lots 2-11, Block 6 be incorporated into the second phase. An alternative would be to incorporate Lot 1, Block 6
into the first phase and construct Street D all the way to 157 Street West. Staff would also like to see Lot 5, Block
1 incorporated into the second phase. This would avoid the need for a temporary turnaround at the end of Street F.
Staff has left Lot 1, Block 3 and Lots 7 and 8, Block 4 in the first phase of the staging plan. However, orientation
of the dwelling units on these lots will dictate their phasing. If access is from Street A they will be able to remain
in the first phase. If access is from Streets B and C, they will need to be in the second phase.
Availability of Municipal Utilities: Extensions of existing utilities will be needed to serve this proposed
development. Watermain will likely be extended to the west from Pilot Knob Road and be located in the 157 Street
West right-of-way. Sanitary sewer will come from an existing line located along the north side of CSAH 46, which
will be extended north along Johnny Cake Ridge Road.
Storm sewer infrastructure will be installed to serve the site. Storm sewer pipes will be installed to collect water from
lots in the subdivision and transport it to the storm water ponding area in Outlots A and B. Water quality provisions
will be identified and incorporated into the reconfiguration of the pond.
3
The City Engineer continues to work with the developer's engineer with the design and layout of street and utility
related infrastructure. Staff expects to have the infrastructure design issues resolved prior to July 17.
Pedestrian Access: Sidewalks, trails or pathways shall be provided in each plat in accordance with provisions of
the City's pedestrian circulation plan. Sidewalks will be required along both sides of local streets within the
development and pathways will be installed on both sides of future Johnny Cake Ridge Road and 157 Street West. A
13-foot wide area has been identified in the southeast comer where a pathway will be installed that will connect with
an existing pathway in Quarry Point Park.
This development is in an area where Dakota County is proposing to construct a section of the North Creek
Greenway. This trail will connect the Vermillion River in Empire Township with the Minnesota Zoo and Lebanon
Hills Regional Park. City staff met with Dakota County representatives to discuss the trail's alignment. It appears
that an understanding has been reached that will take the trail west and north through Quarry Point Park and will
cross 157 Street West east of the Quarry Ponds development. This proposed alignment was presented to the Apple
Valley Parks and Recreation Advisory Committee and they voted to recommend the Quarry Point Park alignment as
proposed by staff.
As part of the North Creek Greenway, an underpass crossing 157 Street is anticipated north of Quarry Point Park.
The necessary easements for the underpass along with installation of the underpass will be required to be incorporated
into the construction of 157 Street.
Recreation Issues: The City's subdivision regulations provide for dedication of land or easements for the purpose of
offsetting the need created by new development for new parks or storm water holding ponds. The regulations also
provide for a cash-in-lieu of land dedication and is based on a "benchmark" land valuation for raw land. The plans do
not propose any land dedication, therefore it will be expected that the developer will be proposing the cash option to
meet their park dedication requirement. This proposal was reviewed by the Parks and Recreation Advisory
Committee and they recommended the acceptance of a cash-in-lieu of land dedication with this plat.
Dakota County Review: Because the proposed development is located adjacent to a County road, it is subject to
review by the Dakota County Plat Commission. This preliminary plat was reviewed by the Plat Commission at their
June 3, 2013, meeting. Attached is a letter from the Commission with their findings.
Public Hearing Comments: Continue the public hearing, receive comments and close the public hearing. It is the
policy of the Planning Commission not to act on an item the night of its public hearing.
The public hearing was originally scheduled for the June 19, 2013 Planning Commission. Circumstances arose that
caused the Commission to not take any testimony on the 19 and to continue the hearing to the next meeting. Because
of that delay, the applicant has requested that the Planning Commission act on the night of the public hearing.
Attachments:
City Attorney's Memo
Applicant's Letter
Plat Commission Letter
Location Map
Comprehensive Plan
Zoning Map
Preliminary Plat
Preliminary Utility Plan
4
Preliminary Grading Plan
Developer' s Staging Plan
Staffs Staging Plan
D Dougherty, Molenda, Softest, Hills & Bauer P.A.
OUGHERTY MOLENDA
Attorneys 1 Advisors
MEMORANDUM
To: Bruce Nordquist, City of Apple Valley
Cc: Tom Lawell, City of Apple Valley
From: Michael Dougherty
Date: 7/10/2013
Re: Applications for Development of Arcon Development/Quarry Ponds
7300 West 147th Street
Suite 600
Apple Valley, MN 55124
(952) 432-3136 Phone
(952) 432-3780 Fax
www.dmshb.com
City Staff, Planning Commission Members and our office have received multiple
communications from Mr. Gene Rechtzigel and his attorney concerning the City's consideration
of Arcon's applications. While these communications address various issues, it is our opinion
that the substance of the communications do not preclude the City from its responsibility to act
on the applications.
Arcon is pursuing a rezoning of 46 acres from Sand and Gravel to Planned Development and a
subdivision of the same acreage into 107 single family lots.
A city acts in its legislative capacity when it adopts or amends a zoning ordinance. The
consideration of a rezoning is not dependent upon ownership to the property in question. Under
State Statute, the City has express authority to rezone property following the requisite notice and
hearing.
In conjunction with the notice of the public hearing, Mr. Rechtzigel expressed concern about his
opportunity to attend a public hearing wherein others may be present whom have obtained a
restraining order against Mr. Rechtzigel. Upon our advice, the Planning Commission continued
the hearing for one month. While the City has no obligation to accommodate the needs of Mr.
Rechtzigel, the one month delay afforded Mr. Rechtzigel sufficient opportunity to seek court
protection to attend the public hearing. We have notified the City Police Department to assist in
efforts to accommodate Mr. Rechtzigel, as well as the neighbors, should any or all desire to
attend the public hearing. Finally, Mr. Rechtzigel may submit any and all concerns, comments
or questions he may have and request that such communication be made part of the public record
for consideration by the Planning Commission and Council.
In reviewing any application for subdivision, the City is determining whether the applicable
standards and criteria contained in the zoning and subdivision regulations are being met. Though
ownership of the subject property is germane to the final approval and platting of the property,
the adjudication of ownership is not a prerequisite to holding a public hearing or granting
preliminary approval. Nevertheless, in order to obtain final approval for a plat, the applicant will
need to provide the Dakota County Surveyor with evidence of ownership of the land subject to
July 10, 2013
Page 2 of 2
the final plat. Moreover, while Mr. Rechtzigel may have an issue with the establishment of the
proposed western boundary line of Arcon's proposal, there is little question that the majority of
the proposed subdivision remains unaffected by Mr. Rechtzigel's claims.
It is our opinion that the Planning Commission may and should proceed as necessary under
Minn. Stat. § 15.99 to consider and make a recommendation to the City Council. Additionally,
the City Council should likewise act upon Arcon's applications when presented for Council
action.
If you have any questions, please feel free to be in contact with me.
www.dmshb.com
Dougherty, Molenda, SoifeA, Hills 8, 1:31i,Jer A.
D OUGHERTY MOLENDA
Attorneys 1 Advisors
July 1, 2013
Mr. Tom Melander, Chair
Apple Valley Planning Commission
7100 — 147 Street West
Apple Valley, MN 55124
Re: Quarry Ponds Rezoning and Preliminary Plat
Dear Mr. Melander,
Arcon Land II, LLC respectfully requests that the Apple Valley Planning
Commission make its recommendation to the City Council at the July 17, 2013 meeting.
According to City Attorney Mike Dougherty, in a meeting on Monday June 24 our
proposal was continued to the next meeting of July 17 not because of any need related
to the rezoning or preliminary plat, but because of an Order for Protection against Mr.
Gene Rechtzigel and the concerns over how he might legally attend the meeting. The two
letters sent to the City of Apple Valley by Mr. Rechtzigel and his attorney were dated
June 19 the very day of the Planning Commission meeting, and delivered to the City
only that afternoon. Because of public notices not only for the rezoning but previously for
the land use change, for which individual notices were sent to surrounding property
owners, including Mr. Rechtzigel, he was aware of the coming proceedings long before
June 19 and had ample time to either have the Order for Protection amended or to make
accommodations with the City to attend the meetings. Instead he chose to wait until the
very last minute to raise this issue so the City had almost no time to react. Obviously the
intent was to delay the commissions business of acting on our proposal.
City Attorney Mike Dougherty has determined that it is both legal and proper that
the Planning Commission act on the request for rezoning and preliminary plat for the
entirety of the submission regardless of Mr. Rechtzigel's allegations or claims. Mr.
Dougherty stated that any issues relating to these allegations or claims will be properly
handled at the time of final platting. If not resolved by that time, the westerly area
involved will simply be left out of final platting so as to be left in a state suitable for any
adjudication.
Because there is only one planning Commission meeting in July, if the Planning
Commission does not make its recommendation on July 17 , Arcon will be delayed from
starting the project until almost September, which will put the project in peril due to not
being able to complete the improvements this year. This would be a major financial loss
for Arcon Land due to an issue that has nothing to do with Arcon Land or the rezoning
and preliminary plat (Mr. Rechtzigel being subject to an order for protection due to his
actions).
Due to the fact of the mitigating issues, the transparent attempt by Mr. Rechtzigel
to interfere with our submission combined with the Planning Commission only having
one meeting in July, and the fact that the public hearing was opened at the meeting of
June 19 the Planning Commission has ample justification to make its recommendation
at the July 17 meeting. Also, this project was the subject of a prior Planning
Commission public meeting for the land use change, where virtually the same
information was discussed. Arcon Land would be unfairly and unjustly damaged if not
allowed to complete the Quarry Ponds project this year because of Mr. Rechtzigel's
questionable actions and behavior resulting in a court of law issuing an Order for
Protection against him and his intentional last minute unjustified manipulations designed
to cause innocent parties harm to further his personal interest.
Thank you, and the Planning Commission members, for your consideration.
Sincerely,
Scott Johnson
President
Arcon Land II, LLC
June 6, 2013
City of Apple Valley
7100 147 Street West
Apple Valley, MN 55124
Re: QUARRY PONDS
The Dakota County Plat Commission met on June 3, 2013, to consider the preliminary plan of the above
referenced plat. The plat is adjacent to CSAH 46, and is therefore subject to the Dakota County
Contiguous Plat Ordinance.
The plat includes 107 single-family lots and two outlots. The needs are 200 feet of full right
of way width for a future six-lane roadway. The plat shows 90 feet of right of way dedication on the
proposed site. The plat needs to show an additional 27 feet of dedication (117 feet total) of dedication
to meet the future needs. Restricted access should be shown along all of CSAH 46 except
for the one access opening for Johnny Cake Ridge Road.
The Plat Commission has a the preliminary plat provided that the described conditions are met
The Ordinance requires submittal of a final plat for review by the Plat Commission before a
recommendation is made to the County Board of Commissioners.
Traffic volumes on CSAH 46 are 24,100 and are anticipated to be 42,600 ADT by the year 2030. These
traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded
for the proposed plat. Residential developments along County highways commonly result in noise
complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential
units, substantial building setbacks, buffer areas, and other noise mitigation elements should be
incorporated into this development.
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder's Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. The Plat Commission highly
recommends early contact with the Transportation Department to discuss the permitting process that
reviews the design and may require construction of highway improvements, including, but not limited
to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact
Gordon McConnell regarding permitting questions at (9 891'7115 or Todd Tollefson regarding Plat
Commission or Plat Ordinance questions at (952) 891'7070.
Sincerely,
Todd B. Tollefson
Secretary, Plat Commission
Dakota County Surveyor's Office
Western Service Center • 1*955 Galaxie Avenue suite # 335 • Apple Valley, MN 55124
v r
QUARRY PONDS
LOCATION MAP
, . 7 • it 4
i . re
ii I* OfiratN 4*
A. % 01 vfili
OP ibib 711 .1_ 0. A
, op MA 1 a i II 17 14
VA I IIIIL rat
1 VI I I FM IP I rin En eitriL
r
14 /11L r
ijaMili
ra i4. imiliiii441
;la fr ajIMPTIMP RIIMM OVIR M
M .gaiNdena a ft_
pA
i 0 ,4% OA
I Ti
7
I mis,
QUARRY PONDS
EXISTING COMP PLAN
DESIGNATION
"LD" (Low Density Residential)
"MD" (Medium Density Residential)
"PI" (Parks/Open Space)
l i.
co„WLIIIII4L40"girEll . m k ar: , _ . ,
killY li.10-71-1440-0,
wkit --4:fflip-Z>fi ht, -
pormvalm .-A. , ./m 6 dL .-„,
..1511110.1 4P/1•574v,
0 iganktic......44..pmet,
•=9N r-
i.00 , 7 ,..... = ,..—Lmmis
taskiler-Arrn
_,.......„.....„ ,....,,,,,,_
IV n wavaitoiro
4rdialroijat
caii
1-2
PD -632
4
SG
1'
SITE
rK/fA
B
QUARRY PONDS
ZONING MAP
"SG" (Sand and Gravel)
"P" ilnstitutional)
s
11 N0 d01�
0
6'00€ L'£B
0'19
11 0'02 0'9Y
3 12axss
U aauis ..
'99 0'02
0'99 0''OB
00091
.1,1 1
0.9041,1,
91•U1S�S
EnN2AF N322I
MI 1
[}111111 hr 91311;Y11. 1.19 111,
U13 100 11111111 /11111199191191.0111111IP'
, § 1111 u1A71sii: ; :LNaN HCrv„1)�lin>
0
z
0
C�
c.�oa-av
o �co �e'ro
>q,:lVd 1 I AEI Vf
A 11VA 31c1c1V JO A.1.10
0.
a9 eaCt
UJ
- Et
\< - a_
> 1_
� - 0
CL
0
Ct
0
0
E — Z_
W
F W
h
m
Z O
W
W
O O Z
� � Z
W Y W
v
W Z Z =
O ® p >-
z cn—�m
0
z
w
0
z
0
0 H CD
0
CD
w
z
0
0
wz
�- o
0
a.a
O <
O 0
o z
.... ........ ...
Iaa xoisTToxZ
�nu�ne Naaam VI
N.
9r
S
•
)*dVd lNIOd m,pdVflO
.1311VA 31ddV 3O kLIn
O
0
s
h W
h
W�
to ®W W L W
� MQL.p
Q h
CuJ n
r
W�l�®
u) -2 2
9v6
r ours ,m o bbs o . � o sas o E4s P o'z4 ;; 011Im777,— o gas � za +� o o 4s g , o oas � A OMflj �� OMHj ��. OMBj ` OMBj , OMHj u OMB k .: OMej 1 OMe+ v OMBj qY OM9j $ �j i' M � $ 0O lS6 „ 'Lb6 0'8x6 ���M141 zs +e . 00' +6 EOS a8bb•���. 0p•
$ 6 ; b�b6 0 01
-. O'ES6 0'£S6 ' O'ZS6 ! O'ZS6 '' O'LS6 OOS6 O6b6 S8b6 �'+ N �i � _` ` �
b
OMHj �'; OMflj • OM9j �r OMe� /� OMHj � NJO /1 MlO �' NJO `o rn � a ,
O'sas C. o's; o'aas :: o'aa6 $3 oE4s +� o's4s 1 oaas /\ sE4s 1- � m `�
�
� o OMe�
Thi---ii m li All
1 � L• 00*5.✓ 00 +4 ��� OO+E p OO Z �Og "° _ f
' ""'"'"'"
r
Z
F— O _
Z
O <
®p
• z
O N
C H
W
H
Z
a. O
o
0
0
Z
W
BW
0
iA
CI 0
CL-
Ct
Ct
Q.
z
r
Q wands
z
W
Z
06
Z
(f)
)12:IVd INIOd A �12 ivno
AD11VA 31ddV JO A113
Ocn
oval snoNimila a r e
I— O
Z
❑
0 N
a rimanV NaSZIO?llV
z
z
❑
VJ
0
ct
CY
t v� - y
® I
}
3
•
LU
o
>reNci 110
31IVA aiddki AO ADO
/
i ---------f
,
* \
..,-- . ..:„..._,..<„,...
Lr
1.1
0 C)
00
w
ERICK G. KAARDAL
Via U.S. Mail
City of Apple Valley Planning Commission
7100 147 St. W.
Apple Valley, Minnesota 55124
Attention: Chairman Tom Melander
MOHRMAN &
111,
ATTORNEYS AND COUNSELORS AT LAW
33 SOUTH SIXTH STREET
SUITE 4100
MINNEAPOLIS, MINNESOTA 55402
July 15, 2013
Re: Public Hearing on Proposed Rezoning of Planned Development
Boundaries Disputed and Presently In Litigation
Proceeding Instituted by Arcon Land II, LLC, et al.
Dear Mr. Melander and Planning Commission Members:
EGKImg
RDAL, P.A.
Very truly yours,
Erick G. Kaardal
TELEPHONE: 612/341-1074
FACSIMILE: 612/341-1076
WRITER'S E-MAIL: KAARDAL@MKLAW.COM
This letter is a supplement to my June 19, 2013 letter. Since that letter, Peter Fischer has
not acted constructively in resolving the historical boundary issue — location of the Minn. Stat. §
344.02 statutory fence line -- between his property and the Rechtzigel property. At a July 9
settlement conference before Dakota County District Court Judge King, Mr. Fischer offered no
money to purchase the Rechtzigel family property interests to resolve all boundary issues —
despite the fact Mr. Fischer stands to make millions on the development he is proposing to the
Apple Valley Planning Commission. Mr. Fischer isn't taking the boundary issue serious enough.
This type of conduct should not be rewarded by the Planning Commission. The Planning
Commission should instruct Mr. Fischer that it is necessary to resolve the boundary issue prior to
moving forward on the proposed rezoning
Meanwhile, the Rechtzigels request that the City of Apple Valley adopt the Rechtzigel
December 17, 2012 survey as its determination for the historical boundary between the
properties.
3. A. motion to recommend' a
subject to the following:
QUARRY PONDS
PROPOSED RECOMMENDATIONS
Recommended Actions: If the Planning Commission concurs, staff is recommending the
following:
1. A motion to recommend approval of the rezoning of the, Southwest Quarter of
Section 35, with the exception of the southwest 9.88 acres, from "SG" (Sand and
Gravel) to "PD" (Planned Development).
2. A motion to have the City Council direct staff to prepare planned development
ordinance that includes permitted, conditional, and accessory uses; and area
requirements and special performance standards consistent with the proposed
development plans, including but not limited: to the following:
• Establishing buffer arfd requirements for Iotslocated directly` adjacent
CSAH 46, Johnny Cake Madge Road and 157 Street West.
• A landscape plan shall be prepared that proles screening from arterial
and collector streets.
PONDS preliminary plat,
• The plat may be' configured to have up to 110 lots and three (3) outlots.
the development:is done u twophases as proposed, the first phase shall
nclude development of Outlots A, =. and C; Lots 9 -14, Block 1; lots 15 -20,
Block 2; and Lips J -17, Bl ick 7 only.
Dedication on the final plat >8f the necessary right -of -way for 157 Street
West:;
• Dedication, a ten foot (10') wide easement for drainage, utility, street,
sidewalk, `street fights, and tree plantings along the entire perimeter of lots
within the plat wherever abutting public road right -of -ways.
• Dedication of a five foot (5') wide drainage and utility easement along all
common lot lines.
• Dedication of one foot (1') wide easements which restrict direct driveway
access to Johnny Cake Ridge Road and 157 Street West.
• 157 Street West shall be constructed from Pilot Knob Road to its existing
roadway section located in the Regatta development within two years after
approval of the fmal plat.
• Johnny Cake Ridge Road shall be constructed from Street A to 157 Street
West within two years after approval of the final plat.
• Park dedication shall be satisfied by a cash -in -lieu of land contribution.
• Installation of municipal sanitary sewer, water, storm sewer, and street
improvements as necessary to serve the plat, constructed in accordance with
adopted City standards, including the acquisition of any necessary
easements within and/or outside the boundaries of the plat which are
needed to install connections to said necessary improvements. The
Developer shall enter into an agreement with the City for payment of the
design of said municipal improvements.
• Installation of left and right turn lanes w'ifti n the "CSAH 46 right -of -way, at
Ridge the Johnny Cake in accordance with the City of
Apple Valley and Dakota Countystandards.
• Dedication of the storm water ponding areas in the form gfeasements or
land necessary to serve the plat per ahe apli dyed City of Apple Valley
Surface Water Management Plan, and subjec to availability of land that
may be necessary to accomvpdate surface tter storage volume that will
satisfy discharge rate requerements into the city'of akeville.
• Drainage and utility easemnts
established;: high yater Le vel :a
determned ?by the City Engineer.
• Installation of pedestrian improvements in accordance with the City's
ado ptcd and glides, to consist of six foot (6') wide concrete
ong both sides o at re sidential streets within the plat and eight
foot (8') wide numinous pathways along both sides of Johnny Cake Ridge
oad and 157`° street West.
• Ai sght foot (8') %%ide bituminous pathway shall be constructed within
Outlot C that will extend and connect with the existing pathway in Quarry
Point Park.
• Dedication
Outlot C.
tted based upon the
overflow elevation as
ay easement and drainage and utility easement over
QUARRY PONDS
APPLE VALLEY PLANNING COMMISSION
PRESENTATION
JULY 17,2013
Request for:
1. A rezoning from "SG" (Sand and Gravel) to "PD" (Planned
Development).
2. The subdivision by plat that will create 107 single - family
residential lots and four (4) outlots.
This proposal also includes a previous comprehensive plan
amendment request for the re- designation of 27 acres of the
site from "MD" (Medium Density Residential) to "LD" (Low
Density Residential).
7/18/2013
1
7/18/2013
2
7/18/2013
3
•
7/18/2013
4
R
F
2
P
POSED STAGING PLAN
STAGING & LAND USE PLAN
7/18/2013
5
R P, , Y rRI R T T VYWRYMNT S
Quart Pond Area Street Network
OUA PONQ RRAINAGF � IPROVEMgNT
[MY f r,�tm Ilk g� kn�Ern, i
DRAINEGE DISTRIQTS
7/18/2013
6
SRECOM TON
1. A motion to recommend approval of the rezoning of the Southwest Quarter of
Section 35, with the exception of the southwest 9.88 acres, from "SG" (Sand and
Gravel) to "PD" (Planned Development).
2. A motion to have the City Council direct staff to prepare planned development
ordinance that includes permitted, conditional, and accessory uses; and area
requirements and special performance standards consistent with the proposed
development plans, including but not limited to the following
• Establishing buffer area requirements for lots located directly adjacent CSAH
46, Johnny Cake Ridge Road and 157th Street West.
• A landscape plan shall be prepared that provides screening from arterial and
collector streets.
MENDATION
3. A motion to recommend approval of the QUARRY PONDS preliminary plat, subject to
the following:
• The plat may be configured to have up to 110 lots and three (3) outlots.
If the development is done in two phases as proposed, the first phase shall
include development of Outlets A, B and C; Lots 9 -14, Block 1; lots 15 -20,
Block 2; and Lots 1 -17, Block 7 only.
• Dedication on the final plat of the necessary right-of-way for 157th Street West
Dedication a ten. foot (10') wide easement for drainage, utility, street, sidewalk,
street lights, and tree plantings along the entire perimeter of lots within the
plat wherever abutting public road right-of-ways.
7/18/2013
7
S OM s DATION
flan
Dedication of a five foot (5') wide drainage and utility easement a long all
common lot lines.
Dedication of one foot (1') wide easements which restrict direct driveway
access to Johnny Cake Ridge Road and 157 Street West.
157th Street West shall be constructed from Pilot Knob Road to its existing
roadway section located in the Regatta development within two years after
approval of the final plat.
Johnny Cake Ridge Road shall be constructed from Street A to 157 Street
West within two years after approval of the final plat.
• Park dedication shall be satisfied by a cash -in -lieu of land contribution.
S RECOUMENDST sN
Installation of municipal sanitary sewer, water, storm sewer, and street
improvements as necessary to serve the plat, constructed in accordance with
adopted Citystandards, including the acquisition of any necessary easements
within and /or outside the boundaries of the plat which are needed to install
connections to said necessary improvements. The Developer shall enter into
an agreement with the City for payment of the design of said municipal
improvements.
Installation of left and right turn lanes within the CSAH 46 right -of -way, at the
Johnny Cake Ridge Road intersection, in accordance with the City of Apple
Valley and Dakota County standards. •
Dedication of the storm water pondingareas in the form of easements or land
necessary to serve the plat per the approved City of Apple Valley Surface Water
Management Plan, and subject to availability of land that may be necessary to
accommodate surface water storage volume that will satisfy discharge rate
requirements into the city of Lakeville.
7/18/2013
8
ECOMMENDAT
• , . . . •
&tFYt
BI
Drainage and utility easements shall be dedicated based upon the established
high water level and emergency overflow elevation as determined by the City
Engineer.
Installation of pedestrian improvements in accordance with the City's adopted
Trail and Sidewalk Policies, to consist of six foot (6') wide concrete sidewalks
along both sides of all residential streets within the plat and eight foot (8')
wide bituminous pathways along both sides of Johnny Cake Ridge Road and
157th Street West.
An eight foot (8') wide bituminous pathway shall be constructed within Outlot C
that will extend and connect with the existing pathway in Quarry Point Park.
Dedication of pathway easement and drainage and utility easement over
Outlot C.
7/18/2013
9
7/18/2013
10
NORTH CREEK GREEN AY
7/18/2013
11
Agenda Item: 6A
Case Number:
Staff Reviewer: Kathy Bodmer
CITY OF APPLE VALLEY PROJECT
PC13-23-V
MMARY
Dalseth Accessory Building Variance
Applicant: Jennifer and Pascal Dalseth
Application Date: April 30, 2013
Meeting Date: June 27, 2013
Petition for:
Summary of
Issues:
Planning
Commission and
City Council
Actions:
At its June 27, 2013, meeting, the Apple Valley City Council voted to approve a variance reducing the
"SH" (Shoreland) setback variance from the OHWL of Farquar Lake from 75' to 26' for a 24' x 16'
(384 sq. ft.) accessory building at 4869 Dominica Way West. However, the City Council received new
information concerning the side yard setback variance at the council meeting and asked that the
Planning Commission review the side yard variance request again in light of the new information. The
petitioners are requesting the Planning Commission consider the following variance:
A variance reducing the 20' side yard setback to locate a 24' x 16' accessory building 5' from
the side property line.
The petitioners, Jennifer and Pascal Dalseth, 4869 Dominica Way West, request the side yard variance
to construct a 24' x 16' accessory structure for storage of watercraft and other sporting equipment, 5'
from the side property line. The side yard setback in the "R-1" (Single family, 40,000 min. lot) is 20'.
After the Planning Commission meeting of June 19, 2013, the Dalseths painted the footprint of the
accessory building on their property 5' and 20' from the side property line and asked that staff visit the
site and discuss the practical difficulties. The petitioners asked that the City consider the following
factors related to the side yard setback variance:
• Locating the building 5' from the side property line would better screen the building from
adjacent property to the west and as viewed from Farquar Lake. There is a drop in elevation
from the property to the west and the Dalseth property. In addition, there is a grouping of
mature trees on the northwest corner of the property and a line of white oak trees along the
west property line that will help to screen the building.
If the building is constructed 20' from the side property line and 26' from the OHWL of
Farquar Lake, it will be located close to a mature red oak tree which will likely damage the
tree. Locating the building 5' from the west property line will help avoid impacts to the tree.
A terraced garden is located along the west property line that serves as a rain garden. slowing
drainage to the lake and providing infiltration and filtering of stormwater. Locating the
building 20' from the side property line would require removal of a large portion of the
established rain garden, while locating the building 5' from the side property line results in
less disruption to the established garden area.
At its June 19, 2013, meeting, the Planning Commission voted 1 to 6 to recommend approval of the
side yard setback variance, effectively recommending denial of the side yard setback variance. The
Planning Commission did not find a practical difficulty that would justify the variance and that
reasonable alternatives were available to the applicants.
At its June 27, 2013, meeting, the Apple Valley City Council voted to table consideration of the side
yard setback variance until further consideration by the Planning Commission based on new
information presented the night of the City Council meeting.
Recommended The Staff reviews variance applications based strictly upon the requirements of the State Statutes and
Actions: the City Code that require that the petitioner establish that there are "practical difficulties" in
complying with the provisions of the chapter in order for a variance to be granted, and that logical
alternatives are not available to the applicant.
Staff finds that a variance reducing the side yard setback from 20' to 5' will result in the least impacts
to adjacent properties and help to screen views from the lake. Thus, staff makes the following findings:
L Locating the building 5' from the side property line will better screen the building from the
adjacent property to the west and as viewed from Farquar Lake.
2. Locating the building 5' from the west property line will help to protect a mature oak tree.
3. Locating the building 5' from the side property line results in less disruption to an established
rain garden along the west property line.
Based on the findings listed above, Staff recommends that the Planning Commission recommend
approval of a variance as follows:
Recommend approval of a variance reducing the side yard setback for a 24' x 16' accessory
building from 20' to 5' at 4869 Dominica Way West, subject to compliance with all City
Code requirements.
2
Existing
Conditions
Property Location:
Legal Description:
Comp Plan Designation
Zoning Classification
Existing Platting
Current Land Use
Size:
Topography:
Existing Vegetation
Other Significant
Natural Features
Adjacent
Properties/Land Uses
Development
Project Review
4869 Dominica Way West
Lot 1, Block 1, HESLI ADDITION
LD-Low Density Residential (0-6 units/acre
R-1 Single Family 40,000
Platted Lot
Single family residential
32,570 sq. ft. (0.75 Acres)
Gently sloping rear yard down to lake.
Landscaped urban lawn.
Property abuts Farquar Lake and is located within the "SH" (Shore land Overlay) zoning
district.
NORTH
SOUTH
EAST
WEST
Definition of "Practical difficulties":
PROJECT REVIEW
Farquar Lake
Comprehensive Plan
Zoning/Land Use
Lot 6, Block 2, FARQUAR LAKE ADDITION
Comprehensive Plan
Zoning/Land Use
Lot 2, Block 1, HESLI ADDITION
Comprehensive Plan
Zoning/Land Use
Comprehensive Plan
Zoning/Land Use
3
Water/Pond
Lake/Pond
LD-Low Density Residential (0-6 units/acre
R-1 Single Family 40,000 s.f.
LD-Low Density Residential (0-6 units/acre
R-1 Single Family 40,000 s.f.
Lot 8, Block 1, FARQUAR LAKE ADDITION
LD-Low Density Residential (0-6 units/acre
R-1 Single Family 40,000
Introduction: Jennifer and Pascal Dalseth, 4869 Dominica Way West, request a variance from the 20' foot side yard
setback to construct a 24' x 16' (384 sq. ft.) accessory building 5' from the side property line. The initial application
included a wrap-around deck which was later removed from the project. The petitioners wish to construct a "water-
oriented" accessory structure which would be used to store watercraft and water-oriented sporting equipment.
100-Year Flood Elevation: In addition to the OHWL elevation established by the DNR, the property also contains
an easement for the 100-year flood elevation of 901.4' that is established by the City to allow for stormwater storage.
Structures must be constructed with a minimum of three feet of "freeboard" to the lowest opening to prevent flooding.
In other words, the lowest opening of the building would need to be set at a minimum of 904.4'.
Variance Considerations: In order to grant a variance, the City considers the following factors to determine whether
the applicant established that there are practical difficulties in complying with the provision(s) of this Chapter:
1. Special conditions apply to the structure or land in question that are particular to the property and do not
apply generally to other land or structures in the district or vicinity in which the land is located;
2. The granting of the proposed variance will not be contrary to the intent of this chapter;
3. The special conditions or circumstances do not result from the actions of the owner/applicant;
4. The granting of the variance will not merely serve as a convenience to the applicant, but is necessary to
alleviate practical difficulties in complying with the zoning provisions of this Code; and
5. The variance requested is the minimum variance necessary to alleviate the practical difficulty.
• The applicant proposes to use the property in a reasonable manner not permitted by the zoning provisions of
the code;
• The plight of the applicant is due to circumstances unique to the property not created by the applicant; and
• The variance, if granted, will not alter the essential character of the locality.
• Economic considerations alone do not constitute practical difficulties.
The Staff reviews variance applications based strictly upon the requirements of the state statutes and the City Code
which require that the applicant establish that there are practical difficulties present in order for a variance to be
granted, and that logical alternatives are not available.
Attachments: 6. Site Plan
1. June 27, 2013 City Council Meeting Minutes 7. Building Elevations and Floor Plan
2. Petitioner Letter 8. Site Photos
3. Neighbor Letter (Rabe, 4877 Dominica Way West) 9. Pictometry Photos
4. Location Map 10. Staff Sketch — Relocated Buildings
5. Zoning Map 11. Resolution 2013-103 Approving "SH" Variance
4
CITY OF APPLE VALLEY
Dakota County, Minnesota
June 27, 2013
Page 4
Courts, Inc., d/b/a Sport Court MN, the lowest responsible bidder, in the total
amount of $106,713.00. Ayes - 4 - Nays - 0.
MOTION: of Grendahl, seconded by Hooppaw, accepting AV Project 2013-131, 2013 Sealing
of Decorative Concrete and Block Retaining Walls, as complete and authorizing
final payment on the agreement with Budget Sandblasting & Painting, Inc., in the
amount of $8,080.00. Ayes - 4 - Nays - 0.
MOTION: of Grendahl, seconded by Hooppaw, accepting AV Project 2013-123, 2013 Farquar
Lake Weed Harvesting, as complete and authorizing final payment on the
Agreement with Midwest Weed Harvesting, Inc., in the amount of $12,379.20, as
described in the Natural Resources Coordinator's memo dated June 27, 2013. Ayes
-4- Nays -0.
MOTION: of Grendahl, seconded by Hooppaw, approving hiring the seasonal employee and
promotion of employee, as listed in the Personnel Report dated June 27, 2013.
Ayes - 4 - Nays - 0
ACCESSORY BUILDING VARIANCE
Ms. Bodmer reviewed the petitioner's request for a 49 ft. "SH" (Shoreland) setback variance and a
15 ft. side yard setback variance to construct a 24 ft. x 16 ft. water-oriented accessory building at
4869 Dominica Way W., adjacent to Farquar Lake. She also recapped discussion held by the
Planning Commission.
Discussion followed.
Councilmember Bergman stated additional facts have been discovered since the Planning
Commission's review.
Councilmember Grendahl suggested the Planning Commission revisit the matter if there is new
information.
Mr. Pascal Dalseth, 4869 Dominca Way W., presented pictures of the site. He stated that without
the side yard variance, a mature oak tree and an established raingarden would be negatively
impacted.
Discussion continued.
END CONSENT AGENDA
MOTION: of Bergman, seconded by Grendahl, tabling the Resolution regarding a 15 ft. side
yard setback variance on Lot 1, Block 1, Hesli Addition (4869 Dominica Way W.)
to allow construction of a 24 ft. x 16 ft. water-oriented accessory building, until
further consideration by the Planning Commission. Ayes - 4 - Nays - 0.
CITY OF APPLE VALLEY
Dakota County, Minnesota
June 27, 2013
Page 5
MOTION: of Grendahl, seconded by Hooppaw, adopting Resolution No. 2013-103 approving
a 49 ft. "SH" (Shore land) setback variance on Lot 1, Block 1, Hes li Addition (4869
Dominica Way W.) to allow construction of a 24 ft. x 16 ft. water-oriented
accessory building, with conditions as recommended by the Planning Commission.
Ayes - 4 - Nays - 0.
STAFF COMMUNICATION
Mr. Lawell announced the annual Drinking Water Report is now available on the City's website.
Mr. Blomstrom gave an update on various road construction projects.
CALENDAR OF UPCOMING EVENTS
MOTION: of Grendahl, seconded by Hooppaw, approving the calendar of upcoming events as
included in the City Clerk's memo dated June 24, 2013, and noting that each event
listed is hereby deemed a Special Meeting of the City Council. Ayes - 4 - Nays - 0.
CLAIMS AND BILLS
MOTION: of Bergman, seconded by Grendahl, to pay the claims and bills, check registers
dated June 20, 2013, in the amount of $2,048,154.31; and June 27, 2013 in the
amount of $892,072.14. Ayes - 4 - Nays - 0.
MOTION: of Grendahl, seconded by Hooppaw, to adjourn. Ayes - 4 - Nays - 0.
The meeting was adjourned at 7:41 o'clock p.m.
Respectfully Submitted,
icr
Pamela J. GaOkstetter, City Clerk
worf
Approved by the Apple Valley City Council on
May 31st, 2013
Community Development Department
City of Apple Valley
Dear Planning Committee,
use variance.
Practical Difficulties Test:
4869 Dominica Way* Apple Valley, MN 55124
Phone: 952-4234856 E-Mail: jeml_pascal@yahooscQm
We would like to request a variance to construct a water accessory structure wi in
the 75 ft setback from the 100-year high water mark. We are also requesting that
the structure sit 5 ft from the property line as is typical for an accessory building
less than 120 square feet. The following will highlight project details and address
how the proposed structure falls within the standards of the three-factor practical
difficulties test; the test used to determine if a property owner qualifies for a non-
1. Owner proposes to use the property in a reasonable manner. The
intended use of the structure is to provide additional storage space for a
boat/trailer, personal watercraft and other water-oriented sporting
equipment. It will occupy an area of 400 square feet and 16 ft will be
parallel to the shoreline. The plan meets the guidelines set forth by the
DNR's shore land management rules. We also believe that storing these
materials in a building is a better alternative to storing the equipment in the
back yard or driveway.
2. The landowner's problem is due to circumstances unique to the
property not caused by the landowner. The 75-foot setback is the
location of our home. The lot is a pie shape getting substantially narrower as
you approach the street from the lake. The boathouse would not be able to
be placed at the setback because it would then encroach on the 5-foot
setback from the property line and obstruct walkways.
3. The variance, if granted, will not alter the essential character of the
locality. The structure will not be out of scale, out of place, or
otherwise inconsistent with the surrounding area. As the plan has
noted, the accessory structure will be respectful of the architecture of our
home. The boathouse design and location was a collaboration between the
homeowners, a landscape architect, and a residential architect. We wanted
to ensure that the building met the following criteria:
In summary, the proposed structure and placement will enhance the aesthetic of
both our property and the adjacent property with the material, location and
architectural thoughtfulness. Thank you for your time and consideration. Have a
wonderful day.
Sincerely,
Jennifer and Pascal Dalseth
2
a. The design of the building looks as if it belongs on the site by
using high quality materials that come from the land.
b. The structure was placed in the least obtrusive location from our
view, the neighbor's and any individual viewing from the lake. We
chose this particular location because of the topography of the
land. The building will be nestled behind several bushes, 3 large
oaks, and several silver maples. The adjacent lot sits much higher
and will allow the neighbors to look over the building versus at the
building. If it sits 20 feet from the property, all views: lake,
neighbors and homeowners will be affected.
c. Improve and screen the views from our home to the neighboring
property. It will serve as a screen from the adjacent properties
aesthetic impact on our property. It is a barrier between the 30-
foot RV, garbage and 4 inoperable/abandoned vehicles that sit
directly on the property line.
Page 2
f #a
0 6 `: oc ; #3f Ss d. ,x .r•
8
•••,.
DALSETH ACCESSORY
BUILDING VARIANCE
W
AREA MAP
FARQUAR
LAKE
DALSETH ACCESSORY
BUILDING VARIANCE
ZONING MAP
Sh r l nd District
1
1
1
1
A
/
1
1
1
1
1
1
1
a v
I j1
.. 1 SSIT'ZZZ'ZS6 XI, 1 tlro 43,A
zisaw 1,3
44
ritAl '/■ - 14`k4\7
i\vm v7INAlo<
30N3C1IS31-1 HI3S1Va
,71 lt-4-0,21ro
. :,:tiiii ,
cAl ., .„... ....
flv 1:1011 •
0 101
0 101
0 101
D 1
- TS
\
4
4
4
4
„ 0 ,
SL
NOLLOnaLSNO0 Elad Dsn ION 00
A1NO SOdE111.1 M]lAai CINV ONICI018 ElOd
N9IS3a AtIVNIIA11138d
_1
4
West side of property tiered landscape area.
Building site area looking west.
•
I!
Front of home.
view
view
S 'eennV,::
x 000.0 Denotes existing elev.
(000.0) Denotes proposed elev.
DEMARS—GABRIEL
LAND SURVEYORS, INC.
6875 WASHINGTON AVE. SO.
SUITE 209
Edirro, MN 55439
Phone:(763) 559-0908
Fox: (763) 559-0479
David E. Crook
Date: October 27. 2012
PDF created with pdfFactory trial version www.odffactory,com
Benchmark: Top Nut Hydrant os shown
Elevotion.915.67
File No.
I hereby certify thotthis survey, plan or repo, was prepared by me
or under my direct supervision ond that 1 om a duly Registered Land 14044 C
Surveyor under the Laws of the Stote of Minnesota.
Minn. Reg. No. 224,
Book—Poge
433/41
Scale
PREPARED FOR:
STAFF SKETCH
RELOCATED BUILDING
LEGAL DESCRIPTION:
Lot 1, Stock 1, HESL/ ADD/170N
AREA:
32,570 SQ. FT.
0.75 ACRES
CITY OF APPLE VALLEY
RESOLUTION NO. 2013-103
A RESOLUTION APPROVING A SHORELAND SETBACK VARIANCE
FOR ACCESSORY BUILDING
AND ATTACHING CONDITIONS THERETO
WHEREAS, pursuant to Minnesota Statutes 462.357 the City of Apple Valley has adopted,
as Title XV of the City Code of Ordinances, zoning regulations to control land uses throughout the
City; and
WHEREAS, pursuant to the City's said regulations, a "Variance" is an exception granted
by the City Council from the literal provisions of the zoning regulations where a practical
difficulty exists which do not apply to the area in general; and
WHEREAS, an application for a variance hereinafter referred to as the PROJECT was
submitted by Pascal and Jennifer Dalseth, hereinafter referred to as APPLICANTS, for the
property hereinafter referred to as the PREMISES, addressed as 4869 Dominica Way West and
legally described as Lot 1, Block 1, HESLI ADDITION; and
WHEREAS, the proposal for this PROJECT entailed a request for a variance from the
setback in the "SH" (Shoreland) of 75' in order to construct a 24' x 16' (3 84 sq. ft.) water-oriented
accessory building 26' feet from the ordinary high water level of Farquar Lake (899.2' elevation);
and
WHEREAS, the Apple Valley Planning Commission reviewed the PROJECT at its public
meetings held on May 15, 2013, and June 19, 2013, at which City Staff, and representatives of the
APPLICANT were present to give testimony and answer questions concerning the project, as
documented in the official minutes of said proceedings and made the following determination:
1. The size of the lot, topography, shape of the lot and location of the existing home
limit the locations available for a water-oriented accessory building, rendering a
practical difficulty for the APPLICANTS to meet the 75' shoreland setback.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Apple
Valley, Dakota County, Minnesota, that the Apple Valley Planning Commission's findings of
practical difficulty are hereby adopted.
BE IT FURTHER RESOLVED by the City Council of the City of Apple Valley, Dakota
County, Minnesota, that a variance from the 75' "SH" (Shoreland) setback requirement to
construct a 24' x 16' (384 sq. ft.) water-oriented accessory building 26' from the ordinary high
water level of Farquar Lake (899.2' elevation) is hereby approved, subject to all applicable City
Codes and standards, and the following conditions:
1. If the Building Permit is not paid for and issued within one (1) year of the date of
approval, the variance approval shall lapse.
2. The variance shall be applicable to property identified as Lot 1, Block 1, HESLI
ADDITION (4869 Dominica Way West ).
3. The variance is approved due to the findings as presented by the Planning
Commission at their June 19, 2013, meeting.
The structure shall be limited to 24' x 16' (384 sq. ft.) and shall not include a deck.
5. The structure shall be located to meet the 20' setback from the side property line.
6. The maximum height of the accessory building shall be 10'.
7. The structure or facility shall be treated to reduce visibility as viewed from
public waters and adjacent shorelands by vegetation, topography, increased
setbacks, color or other means acceptable to the City, assuming summer, leaf-
on conditions.
8. The accessory building shall not be used for human habitation and shall not
contain water supply or sewage treatment facilities.
9. The accessory building shall be used exclusively as a water-oriented accessory
storage structure for watercraft storage, including storage of related boating
and water-oriented sporting equipment.
10. The accessory building shall not exceed a maximum width of 20' as measured
parallel to the configuration of the shoreline.
11. Any other accessory structures or facilities which may be allowed by City
Code must meet or exceed structure setback standards for the R-1 and SH
zoning districts.
12. The accessory building shall be located completely outside of the 100-year flood
elevation easement area.
13. No building permit shall be issued until a certified survey has been filed with the
City depicting the 100-year flood elevation drainage & utility easement and the
location of the accessory building on the site and its distance from the easement.
14. The property owners shall stake the boundaries of the 100-year flood elevation
easement and maintain the stakes prior to and until construction of the accessory
building has been completed.
15. The accessory building shall be constructed at a minimum elevation that provides a
minimum of three feet of free board from the lowest opening of the building to the
100-year flood elevation.
16. Any site grading shall occur in conformance with a Natural Resources Management
Plan (N " P) which shall include final grading plan to be submitted for review and
approval by the City Engineer.
ATTEST:
Pamela J. Gackst
17. Construction shall be limited to the hours of 7:00 a.m. to 7:00 p.m. Monday
through Friday. Weekend construction hours shall be limited to Saturdays,
8:00 a.m. to 5:00 p.m.
18. Earthmoving activities shall not occur when wind velocity exceeds thirty (30) miles
per hour. Watering to control dust shall occur as needed and whenever directed by
the Apple Valley Building Official or Zoning Administrator.
19. Issuance of a Building Permit and approval of the final inspection is contingent
upon the project being constructed in conformance with all the preceding conditions
as well as all applicable performance standards of the current zoning regulations.
20. The ongoing use and occupancy of the premises is predicated on the ongoing
maintenance of the structure and all required site improvements as listed in the
preceding. No alteration, removal, or change to the preceding building plans or
required site improvements shall occur without the express authorization of the
City. Site improvements which have deteriorated due to age or wear shall be
repaired or replaced in a timely fashion.
BE IT FURTHER RESOLVED that such issuance is subject to a finding of compliance of
the construction plans with the Minnesota State Building Code, as determined by the Apple Valley
Building Official, and with the Minnesota State Uniform Fire Code, as determined by the Apple
Valley Fire Marshal.
ADOPTED this 27th day of June, 2013.
er, City Clerk
CERTIFICATE
I, Pamela Gackstetter, City Clerk, hereby certify that the above resolution is a true and
correct copy of a resolution adopted by the City Council of the City of Apple Valley, Dakota
County, Minnesota, on the 27th day of June, 2013.
3
Thomas Goodwin, Acting Mayor
Pamela J. Gackstetter, City Clerk
Dalseth Accessory
Building Variance
Apple Valley Planning Commission Meeting
July 17, 2013
Requested Actions
Variance to reduce side yard setback from
20' to 5' for construction of a 24' x 16' (384
sq. ft.) accessory building.
7/18/2013
1
Planning Commission
Recommendations
At its June 19, 2013, meeting, the Planning Commission
considered two variance(s) to allow the construction of a
24' x 16' (384 sq. ft.) accessory building at 4869 Dominica
Way West:
• A variance reducing the "SH" (Shoreland) setback from 75' to
26' from the OHWL of Farquar Lake (899.2' elevation), finding
that the size of the lot, topography, shape of the lot and
location of the existing home constitute a practical difficulty,
subject to the conditions listed in the staff report. Motion
approved 6 -1.
• A variance from the side yard setback of 20' to locate the
building 5' from the side property line. Motion failed 1 to 6.
Additional Considerations
Side Yard Setback Variance
• Locating the building 5' from the side property line
will better screen the building from the adjacent
property to the west and as viewed from Farquar
Lake.
• Locating the building 5' from the west property line
will help to protect a mature oak tree.
• Locating the building 5' from the side property line
results in less disruption to an established rain
garden along the west property line.
7/18/2013
2
City Council Actions
City Council reviewed the variance at their June
27, 2013, meeting.
• Approved variance to reduce "SH" Shoreland
setback from 75' to 26' to construct 384 sq. ft.
accessory building with several conditions as
recommended by the Planning Commission.
• Asked Planning Commission to re- consider side
yard setback variance in light of new
information.
Site Plan
Proposed.;
c Bldg:'
7/18/2013
3
7/18/2013
4
Recommended Actions
Recommend approval of a variance reducing the side
yard setback from 20' to 5' (15' variance) for a 24' x
16' accessory building at 4869 Dominica Way West,
subject to compliance with all City Code requirements,
based upon the three following findings:
1. Locating the building 5' from the side property line will
better screen the building from the adjacent property to the
west and as viewed from Farquar Lake.
2. Locating the building 5' from the west property line will help
to protect a mature oak tree.
3. Locating the building 5' from the side property line results in
less disruption to an established rain garden along the west
property line.
7/18/2013
5
Location Map
4869 Dominica Way West
7/18/2013
6
Zoning Map
"R-1" (Single Family, 40,000) and "SH" (Shoreland)
4RQUAR
LAKE
■
N 1'
7/18/2013
7
Practical Difficulties
Definition of "Practical difficulties ":
• The applicant proposes to use the property in a
reasonable manner not permitted by the zoning
provisions of the code;
• The plight of the applicant is due to circumstances
unique to the property not created by the applicant; and
• The variance, if granted, will not alter the essential
character of the locality.
• Economic considerations alone do not constitute
practical difficulties.
7/18/2013
8
Practical Difficulties
Factors to determine "Practical Difficulties ":
• Special conditions apply to the structure or land in question that
are particular to the property and do not apply generally to other
land or structures in the district or vicinity in which the land is
located;
• The granting of the proposed variance will not be contrary to the
intent of this chapter;
• The special conditions or circumstances do not result from the
actions of the owner /applicant;
• The granting of the variance will not merely serve as a convenience
to the applicant, but is necessary to alleviate practical difficulties in
complying with the zoning provisions of this Code; and
• The variance requested is the minimum variance necessary to
alleviate the practical difficulty.
7/18/2013
9
7/18/2013
10
Floor Plan - Original App
w /Deck
Conditions of Approval
• The structure shall be limited to 24' x 16' (384 sq. ft.) and
shall not include a deck.
• The structure shall be located to meet the 20' setback
from the side property line.
• The maximum height of the accessory building shall be
10'.
•, The structure or facility shall be treated to reduce
visibility as viewed from public waters and adjacent
shorelands by vegetation, topography, increased
setbacks, color or other means acceptable to the City,
assuming summer, leaf -on conditions.
7/18/2013
11
Conditions of Approval
• The accessory building shall not be used for human
habitation and shall not contain water supply or sewage
treatment facilities.
• The accessory building shall be used exclusively as a
water - oriented accessory storage structure for watercraft
storage, including storage of related boating and water -
oriented sporting equipment.
• The accessory building shall not exceed a maximum
width of 20' as measured parallel to the configuration of
the shoreline.
Conditions of Approval
• Any other accessory structures or facilities which may be
allowed by City Code must meet or exceed structure
setback standards for the R -1 and SH zoning districts.
• The accessory building shall be located completely
outside of the 100 -year flood elevation easement area.
• No building permit shall be issued until a certified survey
has been filed with the City depicting the 100 -year flood
elevation drainage & utility easement and the location of
the accessory building on the site and its distance from
the easement.
7/18/2013
12
Conditions of Approval
• The property owners shall stake the boundaries of the
100 -year flood elevation easement and maintain the
stakes prior to and until construction of the accessory
building has been completed.
• The accessory building shall be constructed at a
minimum elevation that provides a minimum of three
feet of free board from the lowest opening of the
building to the 100 -year flood elevation.
7/18/2013
13
7/18/2013
14
Agenda Item: 7A
Case
Number: XX
Staff Reviewer: Kathy Bodmer
Petition for:
Summary of
Issues:
Hunter Woods Sketch Plan
Applicant: Hunter Emerson, LLC
Application
Meeting Date: July 17, 2013
Sketch plan review of Hunter Woods, a 13-lot single family subdivision. When formal
application is made, the petitioners will be requesting consideration of the following
actions:
• Rezoning from "R-1" (Single family, 40,000 minimum lot) to "R-3" (Single
family, 11,000 minimum lot)
• Subdivision by preliminary plat to create 13 lots for single family development.
The petitioners wish to develop two large rural estate parcels located on the east side of
Galaxie Avenue south of the Dahle Oaks development which is immediately south of the
MN Zoo. The two parcels total approximately 5.6 acres in size after right-of-way is
dedicated for Galaxie Avenue. The following is a quick summary of some of the important
issues related to the project:
• The properties are heavily wooded, so a tree inventory and tree mitigation plan
will be required in connection with the development.
• There is a low area on the site which appears to be a wetland. The petitioner has
had a preliminary wetland assessment conducted which will need to be evaluated
by the City's Natural Resources Management staff to determine whether wetlands
are present on the site. If there are wetlands, they will need to be delineated and
any potential impacts evaluated.
• The site has mature trees, varied topography, and a possible wetland. The City
will need to evaluate whether the "R-3" zoning is the most appropriate zoning for
the parcels.
• Storm ponding and infiltration will need to be evaluated in light of whether or not
there is a wetland on the site. If there is a wetland, there will be pretreatment
requirements in addition to infiltration requirements.
• Sidewalk will be required on one side of the street to connect with the existing
sidewalk on the south side of Frost Point Way. The petitioner will be required to
dedicate an escrow for the future construction of trail along Galaxie Avenue in
accordance with the City's Sidewalk and Trail Policy.
1 The proposed development does not include the 1.6-acre Taylor property to the
south. The development layout limits the Taylors' options for subdividing their
property in the future.
Recommended No official action is necessary. The petitioners wish to discuss the proposed development
Actions: with the Planning Commission and receive feedback before they make formal application.
Existing
Conditions
Property Location:
Legal Description:
Comprehensive Plan
Designation
Zoning
Classification
Existing Platting
Current Land Use
Size:
Topography:
Existing Vegetation
Other Significant
Natural Features
Adjacent
Properties/Land
Uses
Heavily wooded.
NORTH
SOUTH
EAST
WEST
HUNTER WOODS SKETCH PLAN
12842 and 12866 Galaxie Avenue
Broden: 01-01500-80-020
Berg: 01-01500-80-030
LD-Low Density Residential (0-6 units/acre)
PROJECT REVIEW
R-1, Single family, 40,000 sq. ft. minimum lot
Both parcels are unplatted.
Large lot single family.
6.32 (not including right-of-way dedication
Varying topography.
Low areas need to be analyzed to determine whether or not they are wetlands.
Dahle Oaks
Comprehensive Plan
Zoning/Land Use
Taylor Property
Comprehensive Plan
Zoning/Land Use
Nordic Woods 5 Addition
Comprehensive Plan
Zoning/Land Use
Comprehensive Plan
Zoning/Land Use
2
LD-Low Density Residential (2-6 units/acre
R-2 Single Family 18,000 s.f.
LD-Low Density Residential (2-6 units/acre
R-1 Single Family 40,000 s.f.
Eastwood Ridge r Addition & Acorn Hill
LD-Low Density Residential (2-6 units/acre)
PD-138, Zone 6 (Single family 11,000 s.f.)
LD-Low Density Residential (2-6 units/acre)
R-2 Single Family 18,000 s.f. and R-3 Single family
11,000 s.f.
Development
Project Review
Comprehensive Plan: The comprehensive plan guides the development of the two parcels for single family development with
a density of 2-6 units an acre. The comprehensive plan notes that in some instances, densities of less than three units per acre
may be needed:
... The City recognizes that in some cases of infill development when there are severe slopes, mature trees, lakes,
wetlands, or existing adjacent residential neighborhoods, densities of less than three units per acre may be needed.
The proposed development area includes two parcels that have varying topography, mature trees, and possibly a wetland. When
the City reviewed the Dahle Oaks development in 2003, a determination was made that based on the natural features of the area,
a zoning of "R-2" (Single family 18,000 sq. ft. min. lot) was the most appropriate zoning designation. The Hunter Woods
parcels have similar characteristics as the Dahle Oaks development to the north.
Zoning: The property is currently zoned "R-1" (Single family 40,000 sq. ft. min. lot). The petitioners wish to rezone the
property to "R-3" (Single family, 11,000 sq. ft. min. lot). The petitioners state that the zoning is consistent with the
comprehensive plan designation and consistent with the zoning of the properties to the east and west which have a minimum lot
size of 11,000 sq. ft. The City Council approved a rezoning of "R-2" (Single family 18,000 sq. ft. min. lot) for the Dahle Oaks
development on the east side of Galaxie Avenue in 2003 and the Eastwood Ridge 2 Addition development on the west side of
Cedar Avenue in 2005. The City Council noted that the topography of the parcels, mature trees and wetlands were all
considerations for the R-2 zoning.
Preliminary Plat: The preliminary plat subdivides the Broden and Berg properties into 13 lots for single family development.
Right-of-way is dedicated for the extension of Frost Point Way, a local public street, south and west out to Galaxie Avenue. The
subdivision does not include the approximately 1.6-acre Taylor parcel south of the Berg property. The proposed Hunter Woods
development would limit opportunities for further development of the Taylor property.
Site Plan: Not required for a single family development proposal.
Engineering Issues:
Grading Plan: Not included in the sketch plan materials, but will be required as part of a formal application.
Municipal Utilities: The City Engineer reviewed the development and stated that sanitary sewer is readily available
to the site. Water will need to be looped from Dahle Oaks and connected to the trunk line on the west side of Galaxie
Avenue.
Storm ponding/infiltration or filtration will have to be provided on the development. The engineering staff will
determine what will be required after the determination is made whether there is a wetland on the site.
Street Classifications/Accesses/Circulation: The City Engineer notes that the alignment of the new intersection of
extended Frost Point Way and Galaxie Avenue will need to be reviewed in light of the access points on the west side of
Galaxie Avenue. In addition, the curve of the internal street will need to be reviewed to ensure it meets the City design
standards.
Natural Resources Management Issues:
Landscape Plan: Not required for a single family development proposal. The subdivision ordinance requires a
minimum of one front yard tree per lot. The developer would also need to mitigate for tree removal as required by the
City's Natural Resources Management Ordinance.
Tree Inventory/Mitigation: The two properties are heavily wooded, so a tree inventory and tree mitigation plan will be
required in connection with this development proposal.
Wetland Delineation: The low area in the proposed development is being reviewed to determine whether there is a
wetland on the site. The City's Water Resources Specialist, Jane Byron, will review the petitioner's engineer's findings
and make a final determination.
Elevation Drawings: Not required for a single family development proposal.
Pedestrian Access: The City's trail and sidewalk policy would normally require the construction of sidewalk along both sides
of Frost Point Way. However, when the Dahle Oaks development was considered, the City required sidewalk on only the south
side of Frost Point Way to reduce the right-of-way width to help save trees in the development. Dedication of escrow for future
trail along Galaxie Avenue will also be required.
Public Safety Issues: None identified at this time.
Recreation Issues: Cedar Knolls Park is located across Galaxie Avenue from the subject property. Cedar Knolls Park is
classified as a neighborhood park and contains playground equipment, tennis courts, a natural area and pathways. A cash-in-
lieu-of-land park dedication will be required for this development.
Signs: No sign approvals are given at this time. A separate sign permit must be obtained prior to the installation of any signs.
Public Hearing Comments: To be taken.
Attachments: 5. Zoning Map
1. Petitioner Letter 6. Concept Layout #1
2. Location Map 7. Concept Layout #2
3. Area Map 8. Preliminary Sketch Plan
LL Comp Plan Map
3
Date: June 25, 2013
To: KathyBodmer
City Planner
City of Apple Valley
Re: Hunter Woods
Thank you for offering a sketch plan review for the properties located at 12842 and 12866 Galaxie
Avenue. We understand this process will include review by both city staff and the Advisory Planning
Commission.
The subject properties will be combined to provide a 13 lot, single family home development on
approximately 5.6 acres. The two properties are currently zoned R -1 and comp. guide LD. Hunter
Emerson is requesting to rezone the parcels to R-3. The current land use designation and R-3 zoning are
compatible with the adjacent properties: R-3 to the east, R-1 to the south and R-2 to the north.
The development will continue to take access from Galaxie Avenue with additional access provided by
the connection to Frost Point Way.
The parcels are relatively flat and wooded. In effort to minimize grading and unnecessary removal of
mature trees that buffer the surrounding residents, Hunter Emerson intends to provide custom home
pads.
We have provided sketch plans with and without ponding located at the low point of the site. Given
that mature tree are located within this area this may not be considered a wetland, but rather the
natural flow for run off and short term water storage during larger events. We will await the City's
feedback to whether ponding is suggested on lots 12 and 13 and welcome possible alternatives such
as rain gardens.
Please contact me should you require any further information to complete this review. Again, we
appreciate your preliminary feedback to our proposal.
Regards,
Peggy Carlson
Consultant, Hunter Emerson, LLC
651'307-2626
location map
LA T NO. 19-19 130TH ST
HUNTER WOODS
AREA MAP
MN. DEPT. OF TRANS. PLAT NO. 19 -20 & 19-24*
■.■
a dal
/7 C --- ---6]
/ / -----,-,_.;
_ ,----) [- •
----
D
c —s /
... \
i 1 ''\., Fij ...,, , _
,...4,
, s.r % i„
' tri
I
1 la
,,Lo, ,./ ,
/ ,
it -<-1
.
o,
r-- \ \ i\ I
\-p..., \
,:-..,, \
1 tu
----_,
ii.4) ,, 1 ." if -----
CD \ Ln ,----::, -,..
-- ia ,--
,
MCANDREWS RD
P
Eii)1 j:1
HUNTER WOODS
COMPREHENSIVE
PLAN MAP
,
1 29TH 8T W
\
r GABLELN
<
F-
1 /—
o
N
FOLIAGE CT
II —\
orip44_4
Ice
LITT
•
M-BC
n.
3 j
E
r
M-7C1
Ntqc #4L-
„
hilqC
...._, 1 /
j i
T
9
1 ECU
1
P
a
MCANDREWS RD
HUNTER WOODS
ZONING MAP
1 28th Street Ct
N
/
Galaxie P1
This Siie4 lit to itilat3 atirban n7 rk.cniltd pupce
Mit ILO rnop is subject io ctoorwiineat natio
Frot Point Way_ -------
evelopment
,// ,/
/ i I
I q)
aieleareee.
PI NEERengineering
1 25th Street Ct
N
City Park
frost Point Way
This site Map 4s an artists rendition and Z. intended for Mustra$,e purposes only.
Thi5 pte map is ski We'd to change without not,.
H unter Woods AppleValley, Minnesota
Manley Development
P1 NEERe vineering
_J V
cn
LLJ
Ch
0 1
< 1 Ch
co cr
Lci 6
z
2 0
LiJ
CL 0
Ct) F - O
0 (1) 0
5
CD w Cl_
•
0
_J
z
_J
a_
LL1
0
0
a_
0
0
Ji1N3AV
\
LLJ
0
0
Ch
0
z
271
_J
0
0 0 0
0 - o
0
bc
0
0
co
0 0 0
z
0
000
_J _J
LL.,
0
0
<
0
F-
2
1.1_1
0 1--
c <
LIJ
00 z z
0 E
Lii
0 0
(4 :
0 1--- < Ch --
__I U) 0 0 rh z
Z LU
I_LJ
0 Li 0 -, 0
LiJ 0 < 0 .., Cf)
V) _J -- 0 0
00 a_ z <
D_ Li_ LLJ __J
00 L_LJ I—
Cr C) F 0 0 1-1-J
0 0 (n z z
—
•
LL
NM-
H
z
LIJ
LIJ
0
¢
.1■11.91.
H
0
,
Q Q
cri
w
0
0
bD
Q)
co
- a
c
ro
s_.
4—
c
w
0
0
0
ro
cu
w
o
0
0
Hunter Woods
Sketch Plan
Apple Valley Planning Commission Meeting
July 17, 2013
Requested Actions
Sketch Plan Review of Hunter Woods:
• Rezoning from "R -1" (Single family, 40,000 sq. ft.
min. lot) to "R -3" (Single family, 11,000 sq. ft.
min. lot)
• Subdivision by preliminary plat to create 13 lots
for single family development.
7/18/2013
1
Location Map
12842 and 12866 Galaxie Avenue
7/18/2013
2
Comp Plan Map
"LD" (Low Density Residential 2 -6 units /acre)
7/18/2013
3
Zoning
"R -1" (Single family 40,000 sq. ft. min. lot)
7/18/2013
4
7/18/2013
5
Issues
• Site heavily wooded — tree inventory and tree
mitigation plan needed.
• Low area — confirmed not a wetland.
• Rezoning to R -3 consistent with other recent
rezoning in area?
• Storm ponding and infiltration requirements
will need to be determined.
• Sidewalk will need to be extended from Dahle
Oaks development.
• Taylor property?
7/18/2013
6