HomeMy WebLinkAbout06/21/2023 Agenda Packet
M eeting L ocation: M unicipal Center
7100 147th Street West
Apple Valley, M innesota 55124
June 21, 2023
PLA N N IN G C O MMISSIO N T EN TAT IVE A G EN D A
7:00 P M
1.Call to Order
2.Approve Agenda
3.Approve Consent Agenda Items
Consent Agenda Items are considered routine and will be enacted with a
single motion, without discussion, unless a commissioner or citizen requests
to have any item separately considered. It will then be moved to the land
use/action items for consideration.
A.Approve Minutes of J une 7, 2023 Regular Meeting
4.Public Hearings
5.Land Use / Action Items
A.Higher Ground Daycare Conditional Use Permit and Site Plan Building
Permit Authorization
LO C AT IO N: 14605 Glazier Ave
PET IT IO N ER: N VS Properties 32, LLC, Applicant on behalf of Kilber
Investments, LLC, Property owner
B.Hersi Window Well Variance - PC 23-19-V
C onsider variance to reduce side yard setback from five feet (5') to three
feet (3') to install two egress window wells.
LO C AT IO N: 181 150th Street West (Co Rd 42)
PET IT IO N ER: Saed Hersi
6.Other Business
A.Review of Upcoming Schedule and Other Updates
Planning Commission - Wednesday, J uly 19, 2023 - 7:00 p.m.
Planning Commission - Wednesday, August 2, 2023 - 7:00 p.m.
C ity Council - T hursday, J uly 13, 2023 - 7:00 p.m.
C ity Council - T hursday, J uly 27, 2023 - 7:00 p.m.
7.Adjourn
Regular meetings are broadcast, live, on C harter C ommunications C able C hannel
180 and on the C ity's website at www.applevalleymn.gov
I T E M: 3.A.
P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :J une 21, 2023
S E C T I O N:Consent A genda
Description:
A pprove Minutes of J une 7, 2023 Regular Meeting
S taff Contact:
B reanna Vincent, Department Assistant
Department / Division:
Community Development Department
AC T I O N RE Q UE S T E D:
Approve minutes of regular meeting of J une 7, 2023.
S UM M ARY:
T he minutes of the last regular Planning Commission meeting is attached for your review and
approval.
B AC K G RO UND:
State statute requires the creation and preservation of meeting minutes which document the
official actions and proceedings of public governing bodies.
B UD G E T I M PAC T:
N/A
AT TAC HM E NT S :
Minutes
CITY OF APPLE VALLEY
PLANNING COMMISSION MINUTES
June 7, 2023
1. CALL TO ORDER
The City of Apple Valley Planning Commission Meeting was called to order by Chair Kurtz
at 7:00 p.m.
Members Present: Jodi Kurtz, Paul Scanlan, David Schindler, Phil Mahowald, Becky
Sandahl and Jeff Prewitt
Member(s) Absent: Keith Diekmann
City staff members attending: City Planner Kathy Bodmer, Planner Alex Sharpe, Community
Development Director Tim Benetti, Assistant City Engineer Evan
Acosta, City Attorney Sharon Hills, and Department Assistant
Breanna Vincent.
2. APPROVAL OF AGENDA
Chair Kurtz asked if there were any changes to the agenda. – None.
MOTION: Commissioner Schindler moved, seconded by Commissioner Scanlan,
approving the agenda. Roll call vote: Ayes - 6 – Nays – 0.
3. CONSENT ITEMS
A. Approval of Minutes of May 17, 2023
B. Eagle Pointe Model Home Permit
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler,
approving the minutes of May 17, 2023 and the request to construct model
home at 13684, 13688, 13692, and 13696 Hollybrook Drive. Roll call vote:
Ayes - 6 – Nays – 0.
4. PUBLIC HEARING
A. Apple Valley High School Turf Field Accessory Storage Building
Planner Kathy Bodmer gave a brief presentation.
Commissioner Scanlan asked if there were requirements regarding the materials used on
the building.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 2 of 7
Planner Bodmer stated that it must be architecturally compatible.
Chair Kurtz asked if there were any questions or comments from the public. – None.
With no further comments, Chair Kurtz closed the public hearing.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to
recommend approval of a conditional use permit to allow construction of a 1,500
sq. ft. accessory storage building at Apple Valley High School, subject to
conditions. Roll call vote: Ayes – 6 – Nays – 0.
MOTION: Commissioner Mahowald moved, seconded by Commissioner Sandahl, to
recommend approval of a variance to increase the size of the accessory building
from 1,400 sq. ft. to 1,500 sq. ft. with findings and conditions as noted in the
attached draft resolution. Roll call vote: Ayes – 6 – Nays – 0.
MOTION: Commissioner Mahowald moved, seconded by Commissioner Scanlan, to
recommend approval of a variance to increase the number of allowed detached
accessory buildings from two to six with findings and subject to conditions as
noted in the attached draft resolution. Roll call vote: Ayes – 6 – Nays – 0.
B. Eastview High School Turf Field Accessory Storage Building
Planner Kathy Bodmer gave a brief presentation.
Chair Kurtz asked if there were any comments from the public. – None.
With no questions or comments, Chair Kurtz closed the public hearing.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to
recommend approval of a conditional use permit to allow construction of a 1,500
sq. ft. accessory storage building at Eastview High School, subject to conditions.
Roll call vote: Ayes – 6 – Nays – 0.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to
recommend approval of a variance to increase the size of the accessory building
from 1,400 sq. ft. to 1,500 sq. ft. based on findings and subject to conditions
noted in the attached draft resolution. Roll call vote: Ayes – 6 – Nays – 0.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 3 of 7
C. Ordinance Amending Chapter 155, Appendix F, Article 24, Planned
Development No. 646, Zone 2, Adding Drive-Through Window Service in
Conjunction with a Class-III Restaurant
Planner Alex Sharpe provided a brief presentation.
Petitioner, Liza Robson, also gave a brief presentation.
Chair Kurtz stated that it was a great idea and shared that her niece in Michigan is
disabled and works at a business similar to what is being proposed.
Chair Kurtz asked if the courtesy window will be ADA compliant and perhaps have the
ability to come out and then lower for those who may not have the mobility to reach.
Mrs. Robson stated that there are three drive-through lanes and some of the parking lot
needs to be reconfigured. She stated that they would definitely be looking into options for
making the window more accessible.
Commissioner Sandahl voiced her appreciation for the idea.
Commissioner Scanlan was impressed with the background work that the petitioner had
done. Commissioner Scanlan asked what the timetable is for the project.
Mrs. Robson stated that Fall 2023 would be preferred depending on lead times for
materials.
Resident, Natalie Burgett (14342 Genessee Ave.) thanked Liza for her wonderful idea.
Mrs. Burgett stated that she works with younger individuals with disabilities, and she
often sees families affected by developmental disabilities struggling to teach their teens
and young adults skills that often don’t get to be used. This could allow them to
contribute to the community.
MOTION: Commissioner Scanlan moved, seconded by Chair Kurtz, to recommend
approval of an ordinance amending Chapter 155, Appendix F, Article 24,
Planned Development No. 646, Zone 2, adding drive-through window service in
conjunction with a Class-III Restaurant as an accessory use.
Roll call vote: Ayes – 6 – Nays – 0.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 4 of 7
D. Higher Ground Daycare CUP and Site Plan Building Permit Authorization
Planner Sharpe provided a brief presentation.
Petitioner, Chris Horney (Murphy Real Estate Services), also gave a brief presentation.
Chair Kurtz asked if there were any questions or comments from the public.
The director of Jardin Spanish Immersion Daycare, Arlette Gaona (14615 Glazier Ave.),
voiced concerns for the increase in traffic that this may cause. Mrs. Gaona stated that some
parents have said that it can take 5 minutes to turn from 145th to get onto Glazier Ave. and
with doubling the families by adding a second daycare, will it take double the time to get to
Glazier Ave or are there plans to mitigate the traffic. Mrs. Gaona also wondered why a
daycare would want to move next door to an existing daycare.
Assistant City Engineer Evan Acosta requested additional information from Higher Ground
and would like time to complete their study and gather the necessary information regarding
traffic.
Commissioner Mahowald asked what the capacity was of Jardin.
Mrs. Gaona stated the capacity of children is 150.
Resident, Paul Burgett (14342 Genessee Ave.) agreed with Mrs. Gaona’s statement regarding
the traffic being an issue at that intersection and is often backed up. The left turn does not get
a lot of right-of-way and it may be something to consider.
With no further comments, Chair Kurtz closed the public hearing.
5. LAND USE
A. Burgett Backyard Shed Variance
Planner Bodmer provided a brief presentation.
Commissioner Mahowald asked if the height of the building is the height from the top of
the building to the slab or is it built into the incline.
Planner Bodmer stated that the definition of grade is an average. The slope of the rear
yard goes down and then comes back up so there isn’t an easy way to tuck the building
into the hill.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 5 of 7
Commissioner Mahowald stated that the design was interesting with the skylights.
Commissioner Schindler asked if any trees would need to be removed.
Planner Bodmer stated that she did not believe so but would defer to the petitioner.
Petitioners Paul and Natalie Burgett (14342 Genessee Ave.) provided a brief
presentation.
Commissioner Prewitt asked if the basement will be useable once the mold mitigation
and drain tile system is installed.
Mr. Burgett stated that it would be unlikely due to Mrs. Burgett’s mold sensitivity and the
basement also does not have a lot of space.
Commissioner Prewitt asked if there was a survey completed or a report that gives
credence to the elevation differences between neighboring properties.
Mr. Burgett stated that they did have a survey done but that it does not take any
elevations into consideration.
Commissioner Scanlan stated that these types of decisions are often difficult and while he
understands the perspectives of the homeowners, they are limited as a Planning
Commission with how they can make their decisions. Commissioner Scanlan stated that
while the building design is nice, there could be some changes made to bring the height
to 16’. Commissioner Scanlan asked what options there are to bring the building within
Code.
Mr. Burgett stated that the platform could be moved to the middle and there would be a
larger headroom. The reason this option does not work is due to some lockers that need to
be stored in the building and need the heigh clearance.
Commissioner Scanlan said that the building seemed to be designed around a specific
storage element and asked what other options there would be to have the building below
the 16’ limit. Typically, the Commission will work to find other options that will work
for the applicant and within code without needing a variance. Commissioner Scanlan
asked if this item could be tabled to a future meeting after more options are researched.
Mrs. Burgett stated that with the points they have made, what aspects seem unreasonable
to the Commission? They are planning to match the siding of the shed to their house, all
their neighbors are in favor of it, and it would add value to the neighborhood. Mr. Burgett
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 6 of 7
is a skilled builder and it would be very aesthetically pleasing. She stated that Mr. Burgett
has exhausted all other options for keeping within the Code.
Planner Bodmer stated that from a staff standpoint, the petitioners have their mind set on
a specific design and the request is above what the Code allows for. She stated that this
would be equivalent to a three-stall garage plus additional space in the second story.
There is a concern that this structure will be towering and impact the neighborhood.
Planner Bodmer stated that the mold information provided is brand new this evening, so
there is an opportunity to come back after further research. Planner Bodmer asked what
the ceiling height is for the first floor.
Mr. Burgett asked what the considering factors would be and stated that he did not know
that mold would be a factor for the Commission.
Chair Kurtz stated that the mold would likely not have made a difference in her opinion.
A shortage of storage does not prove the fact that a variance should be granted.
Commissioner Sandahl said she sympathized with the petitioners, but they do need to
remain consistent with other variance requests.
Commissioner Mahowald mentioned there is a lot of sympathy for the situation but they
are bound by the ordinances and namely the “practical difficulties” requirement. Needing
dry storage due to mold does not necessitate an 18’ building height. Commissioner
Mahowald asked if there was an option to satisfy the need for storage while keeping
within 16’.
Chair Kurtz asked if a second storage building could be placed on the property.
Mr. Burgett stated that this was offered as an option by City staff, but that he would say
the ordinance is left to interpretation. Mr. Burgett reads it as 750 sq. ft. in area as opposed
to footprint. He believes that the lack of storage is unique to their situation and caused by
the property.
Chair Kurtz asked how much more square footage will they gain by going to 18’ high.
Mr. Burgett stated that they would be able to use 260 sq. ft.
Chair Kurtz asked if that would allow them to fit all their belongings that are currently in
storage.
Commissioner Scanlan asked if the Burgett’s would like a vote to be taken this evening
or if they would like to table it for further discussion.
CITY OF APPLE VALLEY
Dakota County, Minnesota
Planning Commission Minutes
June 7, 2023
Page 7 of 7
Chair Kurtz stated that she would prefer to not table the item as her decision would likely
not change.
Mr. Burgett agreed that he would not want to table the item.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to
recommend denial of a variance to increase the maximum height of an accessory
storage building from 16’ to 18’, finding that the request does not meet the Code
requirements for a practical difficulty. Roll call vote: Ayes – 6 – Nays – 0.
6. OTHER BUSINESS
A. Review of Upcoming Schedule and Other Updates
The next Planning Commission meeting is scheduled for Wednesday, June 21, 2023,
7:00 p.m. The next City Council meeting is Thursday, June 8, 2023, 7:00 p.m.
7. ADJOURNMENT
Chair Kurtz asked for a motion to adjourn.
MOTION: Commissioner Scanlan moved, seconded by Commissioner Schindler, to
adjourn the meeting at 9:02 p.m. Roll call vote: Ayes – 6 – Nays – 0.
Respectfully submitted,
______________________________________
Breanna Vincent, Planning Department Assistant
Approved by the Apple Valley Planning Commission
on 6/21/2023 . Jodi Kurtz, Chair
I T E M: 5.A.
P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :J une 21, 2023
S E C T I O N:L and Use / Action I tems
Description:
Higher Ground Daycare Conditional Use P ermit and Site P lan Building P ermit A uthorization
S taff Contact:
A lex Sharpe, A I C P, Planning and Economic Dev. S pec.
Department / Division:
Community Development Department
Applicant:
NV S Properties 32, L L C, Applicant on behalf of K ilber
I nvestments, L L C, Property owner
P roject Number:
P C23-16-B C
Applicant Date: 5/10/2023 60 Days: 7/9/2023 120 Days: 9/7/2023
AC T I O N RE Q UE S T E D:
1. Recommend approval of a C onditional Use Permit for a daycare facility at 14605
Glazier Ave, subject to conditions in the draft resolution.
2. Recommend approval of a Site Plan and Building Permit Authorization for a 755 sq. ft.
addition to 14605 Glazier Ave, subject to conditions in the draft resolution.
S UM M ARY:
N VS Properties, LLC , (Higher Ground Daycare) has applied for a conditional use permit
(C UP) for a daycare and site plan building permit authorization to reutilize an existing
building at 14605 Glazier Ave.
T he site was a former orthodontist office and is a two-story brick structure. T he site is
accessed from Glazier Ave, which also serves several single-family residential homes. T he
.95 acre site was subdivided in 2019 creating a new lot to the south for J ardin Daycare.
T he site is zoned "LB" (Limited Business) which allows daycare facilities as a conditional
use. A site plan and building permit authorization was submitted as a first floor addition
proposed on the property. T he scope of this addition is minimal, at 755 sq. ft. but the
addition would significantly affect the façade appearance of the structure from the
neighboring residential properties.
T he public hearing was held on J une 7, 2023, a summary of comments and staff's response is
included in the background of the report.
B AC K G RO UND:
P ublic Hearing Comments and Staff Response
Hearing Comment: A resident noted concern over traffic due to a daycare facility next door.
An additional comment seconded this concern, particularly when taking a left turn onto C edar
Ave from 145th St. W.
Staff Response: In 2019, a traf fic study (J ardin C enter Traf f ic Study by S RF dated J une
14, 2019) was completed which included J ardin Daycare, Hope C hurch redevelopment
(Caribou Coff ee) and this site combined. Westbound right-turning queues at the Cedar
Avenue and 145th Street intersection are still expected to be accommodated within the
existing turn-lane storage with the proposed changes near this intersection. No additional
mitigation is required at this time.
Hearing C omment: Why is a daycare use being proposed next door to another daycare?
Staff Response: The City has zoned both properties "LB" (Limited Business). A daycare use
is a conditional use within this zoning district. The zoning ordinance allows f or permitted,
conditional, and accessory uses on a site within that zone, but unless otherwise specified,
does not limit the total number of a particular use within the zone. If the use is permitted
within the zone the City cannot restrict the use on a site.
Zoning and Comprehensiv e Guiding
T he site is guided for commercial uses and as stated is zoned "LB" (Limited Business). A
conditional use is a use allowed in a zoning district by conditional use permit upon which the
City C ouncil may place reasonable conditions to offset potential impacts caused by the use.
Site P lan
T he applicants are proposing to add three playground areas to the site, with the two smaller
play areas to the west of the structure where the building will act as screening for the
neighboring residential. T he plan also shows a larger playground area at 6,750 sq. ft. to the
north of the structure. T his area is currently a paved patio area and greenspace. A large
transformer is existing on the site west of the playground area. T he applicant is proposing to
fence this area off to prevent children from being in contact with the transformer.
A 6' tall aluminum fence is proposed circling the building. Fence details have been provided
and the fence will be of a rod iron style. No comments from the Planning Commission or the
public expressed concern about child noise, and as such staff is not recommending any
opaque or solid fence sections.
T he applicant has updated their plans to include the specifications for the trash enclosure.
T he enclosure is proposed to be constructed of the same brick as the building addition and
meets code requirements. Upon further review, the applicant is proposing to add two sheds to
the property. Two sheds are permitted on the property, however, they must be of the same
building materials as the existing building. A condition has been added to the draft resolution
to this affect.
A condition that a wayfinding signage plan be approved by the C ity is proposed. T he site
design sets itself up naturally for parents dropping off or picking up children to enter through
the north entrance off Glazier and exit through the south site access. T he C ity is not requiring
that the site be altered to make it one-way traffic. Drop off and pickups however should
follow this rule as it reduces conflicts with children crossing and interior site traffic. T he plan
should include a combination of pavement markings and directional signs to assist site users
with finding the desired route.
Grading, Drainage, and Utilities
T he site grading will not be significantly affected as part of this development. T he site is
relatively flat and already served with basic utilities. T he Fire Marshal, Building Official,
and C ity Engineer have stated that this change in use will require that the building be
sprinkled. Water service to the site is currently from the west which should be able to
accommodate the increased demand required. Additional conditions/notations are noted in the
City Engineer memo attached to this report. A rain garden has been added to the site plan on
the east side of the site to address site drainage. T he final design of the rain garden is pending
and may require the removal of parking spaces to function correctly. A dditional stormwater
study is required in order to determine the size and scope of the rain gardens. Prior to City
Council review, the stormwater and landscaping plans will require updating.
P hotometric P lan
A photometric plan was submitted which demonstrates that the site meets the requirement of
.5 foot-candles at the property line. T his diagram shall also be submitted with the building
permit.
Landscape P lan
T he landscape plan intends to retain much of the existing vegetation. T he applicant has stated
that the existing vegetation has been evaluated and and is in good health, however upon a site
visit several trees are in poor condition, are invasive, or are scrub trees. Per staff comments,
the applicant has updated the landscape plan to meet species diversity requirements and have
included native species where possible. As the rain garden's final design is still pending, the
garden is not shown on the landscape plan. Prior to C ity C ouncil approval, the landscape
plan shall be updated to include the rain garden on the east side of the site and identify where
trees are being planted vs. existing. Additionally, dead, dying or diseased trees shall be
removed.
Site P arking
Code requires that a daycare have 10 parking stalls minimum, plus one for every 500 sq. ft.
T he total required parking on the site for this use is 22 stalls. T he site currently provides 51
stalls. T he applicant is proposing to reduce the site parking by 7 stalls, for a total of 44,
double the code requirement. T his analysis was complete without "netting out" spaces such
as elevators, utility rooms, or storage areas where people are not generally occupying the
space. If additional parking spaces are removed for the rain garden, the site has ample to
spare for the proposed use.
Traffic
T he applicant has provided additional trip generation and total child counts to the City
Engineer. A traffic study was completed at the time of the J ardin lot split development in
2019. T he public hearing comments response section provides additional details on this
study.
Env ironmental Considerations
T he reuse of an existing building is an environmental benefit and is significantly better than
demolition and reconstruction of the building. T he addition of a rain garden will also have
significant improvement to stormwater quality on the site as currently all of the parking lot
drains to the street. Utilization of native plantings was encouraged, and the applicant has
updated their plans to use several native species. T he applicant has also stated that the
building will have LED lighting, and high efficiency furnaces.
B UD G E T I M PAC T:
T he site is platted and has paid park dedication. A building permit will be required with the
building addition.
AT TAC HM E NT S :
Area Map
Resolution
Resolution
Applicant L etter
Memo
Memo
Memo
Plan S et
L andscaping Plan
Elevations
147TH ST W CEDAR AVEGLENDA DRGLAZIER AVE145TH ST W
146TH WAY W
146TH ST W
U P P E R 1 4 5 T H S T W
UPPER 146TH ST WCEDAR AVESITE
Higher Ground DaycareZoned "LB"Limited Business
¯
^
0 200 400 Feet
CITY OF APPLE VALLEY
RESOLUTION NO. 2023 - ___
A RESOLUTION APPROVING A CONDITIONAL USE PERMIT
FOR DAYCARE CENTER USE IN “LB” (LIMITED BUSINESS) ZONE
AND ATTACHING CONDITIONS THERETO
WHEREAS, pursuant to Minnesota Statutes 462.357 the City of Apple Valley has adopted,
as Title XV of the City Code of Ordinances, zoning regulations to control land uses throughout the
City; and
WHEREAS, said regulations provide that daycare center uses may be allowed within the
confines of an “LB” (Limited Business) zoning district and in accordance with specific
performance standards, as a conditional use; and
WHEREAS, the subject property is addresses 14605 Glazier Ave and legally described as
Lot 1, Block 1, Biewald Second Addition; and
WHEREAS, approval of a Conditional Use Permit for NVS Properties, (Higher Ground), a
daycare center, has been requested by the operator of the business, and the property owner, Kilber
Investments, LLC; and
WHEREAS, review of such Conditional Use Permit request to determine its conformance
with the applicable regulations and performance standards has occurred at a public hearing held on
June 7, 2023; and
WHEREAS, the Apple Valley Planning Commission recommended approval of such
Conditional Use Permit subject to certain conditions on DATE.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Apple
Valley, Dakota County, Minnesota, that a Conditional Use Permit for a daycare center use within
an “LB” (Limited Business) zone be approved subject to compliance with the City Code and the
following conditions:
1. If the use allowed by the Conditional Use Permit is not completed or utilized
within one (1) year of the date of approval, the permit shall become null and
void.
2. Such operations shall be conducted in conformance with the site plan dated
DATE.
3. Such operations shall be constructed in conformance with the landscape plan
revised DATE.
4. The hours of operation for the daycare shall be 6:30 a.m. to 8:00 p.m.
5. Subject to all comments and conditions noted in the City Engineer’s memo
dated DATE.
6. A wayfinding signage plan shall be reviewed and approved by the City to
ensure pedestrian traffic does not conflict with vehicular traffic on the site.
7. All accessory structures must meet code requirements, including setbacks.
Construction materials for the sheds shall match building materials.
8. The Conditional Use Permit may be revoked for cause if the terms of (1)
through (7) preceding are not adhered to.
ADOPTED this DATE, 2023.
_________________________________
Clint Hooppaw, Mayor
ATTEST:
___________________________________
Pamela J. Gackstetter, City Clerk
CERTIFICATE
I, Pamela Gackstetter, Apple Valley City Clerk, hereby certify that the forgoing is a true
and correct copy of a resolution adopted by the City Council on ___________ ___, 20____, the
original of which is in my possession, dated this _____day of ______________________, 20__ .
____________________________________
Pamela J. Gackstetter, City Clerk
CITY OF APPLE VALLEY
RESOLUTION NO. 2023-___
A RESOLUTION AUTHORIZING ISSUANCE OF A BUILDING PERMIT
FOR A 755 SQ FT ADDITON TO AN EXISTING BUILDING FOR A DAYCARE
AND ATTACHING CONDITIONS THERETO
WHEREAS, pursuant to Minnesota Statutes 462.357 the City of Apple Valley has adopted,
as Title XV of the City Code of Ordinances, zoning regulations to control land uses throughout the
City; and
WHEREAS, said regulations provide that issuance of a building permit for commercial,
industrial, and multiple residential uses require the specific review and approval of development
plans by the Apple Valley Planning Commission and City Council; and
WHEREAS, the subject property is addresses 14605 Glazier Ave and legally described as
Lot 1, Block 1, Biewald Second Addition; and
WHEREAS, approval of such a building permit issuance has been requested for the above
referenced project; and
WHEREAS, the Apple Valley Planning Commission has reviewed the development plans
and made a recommendation as to their approval at a public meeting held on DATE.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Apple Valley,
Dakota County, Minnesota, that the issuance of a building permit for Higher Ground Dacare is
hereby authorized, subject to all applicable City Codes and standards, and the following conditions:
1. If the Building Permit is not paid for and issued within one (1) year of the date of
approval, the approval shall lapse.
2. Construction shall occur in conformance with the site plan dated DATE, on file with
the City, including parking lot paving and a non-surmountable concrete curb and
gutter.
3. Construction shall occur in conformance with the landscape plan dated DATE on
file with the City, (including sodded/seeded public boulevard area up to each street
curbline); subject to submission of a detailed landscape planting price list for
verification of the City’s 2.5% landscaping requirement at the time of building
permit application. The landscape plan shall be updated to reflect which site
plantings are existing, and which are existing.
2
4. Additional study by the applicant is required to determine the health and species of
existing trees/shrubs. Some of the existing vegetation is in poor condition or are
undesirable species.
5. The plant schedule shall be updated to remove species which may be invasive.
6. Construction shall occur in conformance with the utility plan dated DATE, on file
with the City.
7. Construction shall occur in conformance with the elevation plan dated June 9, 2023,
on file with the City.
8. A bike rack shall be installed in close proximity to the primary entrance which does
not impede pedestrian flow of the proposed sidewalks.
9. Subject to all conditions noted in the City Engineer's memo dated DATE.
10. Wayfinding signage shall be installed to direct vehicular and pedestrian traffic. A
wayfinding signage plan shall be approved by the City Engineer.
11. Trash enclosures shall be screened in conformance with City Code.
12. All necessary mechanical protrusions visible to the exterior shall be screened or
handled in accordance with Section 155.346 (3) (a) (b) of the City Code. If the
current parapet wall is found to not be a sufficient screen other code compliance
screening shall be installed.
13. Issuance of a Building Permit and a final certificate of occupancy is contingent upon
the project being constructed in conformance with all the preceding conditions as
well as all applicable performance standards of the current zoning regulations. In
the event that a certificate of occupancy is requested prior to completion of all
required site improvements, a suitable financial guarantee in the amount of 125% of
the estimated cost of the unfinished improvements shall be required along with an
agreement authorizing the City or its agents to enter the premises and complete the
required improvements if they are not completed by a reasonably stipulated
deadline, with the cost of such City completion to be charged against the financial
guarantee.
14. A separate application and signage plan in conformance with the sign regulations
must be submitted to the City for review and approval prior to the erection of any
signs.
3
15. Construction and earthmoving activities shall be limited to the hours of 7:00 a.m. to
7:00 p.m. Monday through Friday. Weekend construction hours shall be limited to
the hours of 8:00 a.m. to 5:00 p.m.
16. The ongoing use and occupancy of the premises is predicated on the ongoing
maintenance of the structure and all required site improvements as listed in the
preceding. No alteration, removal, or change to the preceding building plans or
required site improvements shall occur without the express authorization of the City.
Site improvements which have deteriorated due to age or wear shall be repaired or
replaced in a timely fashion.
BE IT FURTHER RESOLVED that such issuance is subject to a finding of compliance of
the construction plans with the Minnesota State Building Code, as determined by the Apple Valley
Building Official, and with the Minnesota State Uniform Fire Code, as determined by the Apple
Valley Fire Marshal.
ADOPTED this th day of MONTH, 2023.
______________________________________
Clint Hooppaw, Mayor
ATTEST:
___________________________________
Pamela J. Gackstetter, City Clerk
5/10/23
Apple Valley
Dept. of Planning and Economic Development
7100 147th Street W.
Apple Valley, MN 55124
RE: 14605 Glazier Ave, Site Plan and Building Permit Authorization, Conditional Use Permit for
a “Day-Care center” in the “LB” (Limited Business) zone
Dear Community Development Department,
Thank you for taking the time to review this application related to our Site Plan
Approval. As a developer for the daycare operator Guidepost Montessori, we believe this site
is a great use for daycare and believe our plan works well within the site. As the City of Apple
Valley continues to grow and the major employers nearby do as well, we believe that the City
of Apple Valley and its constituents would benefit from a high-quality daycare facility nearby
a main thoroughfare. Guidepost would be signing a 20-year lease assuming we get approval,
showing their commitment to Apple Valley and being a good long-term neighbor.
The site under contract is currently an existing building. Our team plans to renovate the
existing space and add a single-story addition to the front of the building of ~900SF. The
building elevations and general design will remain unchanged (masonry and siding), height
(two stories), and lot coverage (~9,325 SF vs a site area of 41,435SF). While there would be
traffic with the parents picking up and dropping off, this traffic would be occurring during
rush hour time periods in the morning and afternoon and would not interfere with the
daytime or evening hours. Furthermore, the location would be closed on the weekends,
except for an occasional special event, again further lessening the impact on the surrounding
neighbors. Therefore, I would ask that the Plan Commission consider approving the Site Plan
Approval.
While there would be traffic with the parents picking up and dropping off, there are
multiple points of entry to Glazier Ave, and we have a two-lane lot with two driveways, both
of which will consist of an entrance and exit. With 44 parking spaces on site, this is more than
enough to handle the pick-up and drop-off periods, which are typically from 7-9 am in the
morning and from 3-6 in the evening.
Some useful statistics and metrics about the proposed development are as follows:
Site Size – 41,435 SF
Building Size – ~9,325 SF
Daycare Operator – Guidepost Montessori
Parking Spaces – 44
Number of Employees – 17 at a steady state on site at one time, ~24 total
Number of Students – 131
Peak Number of Drop-offs per Avg 7 minute interval – 9.78 (average from school data)
Kids per class – 8-29 depending on age (8 per Nido, 12-13 per toddler, and 28-29 per 3-
6 child)
Hours of Operation – 7-6
% of students that are half-day vs. full-day – 100% full time
I look forward to having a conversation about the development in the near future and
addressing any concerns the Commission may have about the project at that time.
Sincerely,
Chris Horney
Murphy Real Estate Services
Managing Director
Apple Valley
Fire Department
MEMO
City of Apple Valley
TO: Alex Sharpe- City Planner
FROM: Brian Kilmartin- Fire Marshal
DATE: 1st June 1, 2023
SUBJECT: Higher Ground Childcare
- The building is currently not protected by a Fire Suppression System. The City of Apple
Valley adopted chapter 1306 of the building/fire code, which requires all new
construction to install Fire Suppression.
- The building currently does have a Fire Alarm system. The current Fire Alarm System
will need to be evaluated for continued service and functionality.
- Carbon Monoxide detection will need to be installed where applicable, additionally any
detection will need to be connected to the Fire Alarm Syatem
Brian Kilmartin
Fire Marshal
952-953-2680
brian.kilmartin@applevalleyfire.org
City of
MEMO
Building Inspections
TO: Alex Sharpe, Planning and Economic Development Specialist
FROM: George Dorn, Building Official
DATE: May 15, 2023
SUBJECT: 14605 Glazier Ave Higher-Ground Day Care
• SAC determination is required from Met Council prior to permit issuance from the city.
• Submit plans to Minnesota Department of Labor, Plumbing Division for review of any
proposed plumbing work.
• Separate sign permits are required. Signed structural drawings will be required for review
with the Building Permit application.
• Separate plumbing, mechanical, electrical, and building permits are required.
• The City of Apple Valley has adopted the 2020 MSBC 1306, subpart 3 Special Fire
Protection systems. Due to the change of occupancy classification from a B to E with 2,000
or more gross square feet and two stories, this building and the new 900 square foot front
addition is required to have an automatic sprinkler system installed based on occupancy type
and square footage.
• Approval must be granted for work in the high-pressure gas pipeline easement.
• Accessible parking will be reviewed with the permit application.
• Day care license information will be required to be provided on the code analysis page
showing the age and quantity of children to be cared for.
• Architectural, and or Structural plans are required to be signed with the permit application.
• Existing accessibility will need to be reviewed.
• Department of Health review required prior to permit issuance.
CITY OF
MEMO
Public Works
TO: Alex Sharpe, AICP, Planner
FROM: Brandon Anderson, City Engineer (Evan Acosta, Asst City Engineer)
DATE: June 14, 2023
SUBJECT: Higher Ground Daycare Site Plan Review per plans dated 6/12/2023
Alex,
The following are comments regarding the Higher Ground Daycare Site Development Plans dated
6/12/2023. Please include these items as conditions to approval.
General
1. All work and infrastructure within public easements or right of way shall be to City
standards.
2. No construction work shall begin prior to a preconstruction meeting conference with a
Public works and a Building Inspections representative.
3. Public Work Department (952-953-2400) shall be notified a minimum of 48 hours for
any required water main shut downs and/or connections.
4. Plans should include reference to all used City of Apple Valley standard detail plates. All
Standard detail plates should be shown in the details section of the plans.
5. No trees will be permitted in public easements.
6. The proposed use of the building constitutes a Change of Use, and the building will need
to be retrofitted with a fire suppression system (sprinkler).
Permits
7. Provide a copy of the executed Minnesota Department of Health, Minnesota Pollution
Control Agency, Met Council, Department of Labor and any other required permits prior
to construction.
8. Department of Labor and Industry (DOLI) shall review private utilities.
9. A right of way permit will be required for all work within public easements or right of
way.
10. A Natural Resource Management Permit (NRMP) will be required prior to any land
disturbing activity. The permit application requires a sediment and erosion control plan,
drainage map, and a tree replacement plan for trees removed.
Site
11. In 2019 a traffic study (Jardin Center Traffic Study by SRF dated June 14, 2019) was completed
which included Jardin daycare, Hope Church redevelopment (Caribou coffee) and this site
combined. Westbound right-turning queues at the Cedar Avenue and 145th Street
intersection are still expected to be accommodated within the existing turn-lane storage with
the proposed changes near this intersection. No additional mitigation is required at this time.
12. Show the location of manholes and gate valves and hydrants on the site plan.
13. Signage Plan and details should be included on site plan (i.e. pedestrian crossing signage,
ADA, directional signs, no parking, buffer/storm water signs, no snow storage in storm
water basins, etc…) for review
• It’s recommended that the North entrance be signed as “entrance” or similar and the
South entrance be signed as “exit” or similar. Note that this would not make the
entrances “one way” but would rather assist with drop off and pickup traffic pattern.
Grading & Drainage Plan
14. Final Grading Plans shall be reviewed and approved by City Engineer.
15. Label the EOF’s on the grading plan.
16. Infiltration area should be minimized from the drainage and utility easement area
• Curb cuts should be shown if being used to capture parking lot drainage and directing
to infiltration areas
• The use of the observation well in the detail should be clarified – additional
calculations need to be provided for infiltration basin
• EOF and drainage arrows with spot elevations should be shown on the grading plans.
• Spot elevations and contours are required to show design of infiltration areas
17. Additional spot elevations are required in the proposed playground area, picnic area, shed,
etc… to ensure that drainage changes will not adversely affect neighboring properties.
18. In accordance with 2018 Surface Water Management Plan (SWMP), several storm water
policies would need to be addressed for new or redevelopment of the site:
• Policy 1.5 The City requires that new development and redevelopment activities do
not increase peak runoff rates relative to pre-project runoff rates for the 1-year, 2-
year, 10-year, and 100-year critical storm event. The City may impose more
stringent rate control requirements if the capacity of the downstream system is
limited.
• Policy 6.2 The City requires that all new, redeveloped, or expanded commercial,
industrial, multiple residential, or institutional development provide infiltration for a
volume equivalent to 0.5 inches of runoff over the area of the development.
• Soil borings will be required in areas of proposed infiltration
• Policy 6.3 The City requires that new and redevelopment activity of 0.2 acres or
more shall be required to achieve no-net-increase in average annual total
suspended solids (TSS) and total phosphorus (TP) loading compared to the pre-
development condition of the site.
• Policy 6.5 of SWMP: New and Redevelopment activity of 0.2 acres or more shall be
required to achieve no-net increase in average annual runoff volume compared to
the pre-development condition; linear projects that do not increase the amount of
impervious surface are exempt from this policy.
19. Provide stormwater management calculations included in Stormwater management report or
memo.
20. Applicant shall provide soil borings in the location of any stormwater management features,
raingarden, etc.
21. Applicant shall provide pre-treatment and a stabilized overflow for any stormwater
management feature
22. Applicant shall execute a maintenance agreement to be recorded on the property for any
onsite stormwater management features.
23. Applicant shall not store snow within the infiltration areas to prevent clogging of the basin.
24. Provide detailed planting plan with quantities and labels to ensure selected plants can survive
per infiltration area depths.
25. Submit a Storm water Management Checklist. The checklist can be found on the City’s
website at https://www.cityofapplevalley.org/DocumentCenter/View/16258/Project-
Submittal-Checklist_Fillable
Sanitary Sewer and Water main
26. Domestic water and fire service shall be split outside the existing building and the valves shall
be located 1.5 times the height of the building away from the building or placed in location
readily accessible per City of Apple Valley standard detail plate SER-6.
• The valves as shown for the domestic/fire suppression line are NOT accessible in the
location shown. The split and valves should be located outside proposed fenced area
(a restoration plan is recommended for placement in cedar avenue ROW for
decorative concrete replacement)
• Traffic control plan and Dakota County ROW permit will be required for water
connection as shown
27. Final locations and sizes of Sanitary Sewer and Water main shall be reviewed with the final
construction plans and approved by City Engineer.
• Existing hydrant spacing will be analyzed to determine if improvements will be
required to meet fire code.
28. All water mains located within right of way and public easements for purposes of connection
to public infrastructure shall be ductile iron pipe and meet all City standards.
29. All watermain shall be a min depth of 8.0’.
30. Watermain connection in Cedar Avenue cannot be placed under existing storm catch basin as
shown and will need to be relocated. Size of pipe and material should be indicated on utility
plans.
31. Any unused sanitary and/or water service connections are required to be removed back to
the main.
32. Identify Irrigation service location(s) if applicable per SER-4.
Landscape and Natural Resources
33. Tree varieties have been revised to reflect diversity rules. Please provide labels on the plan of
what is proposed to stay vs. be removed, and where each replacement tree will be located.
34. Existing vegetation notes:
• On northern property edge the current landscaping contains a dead ash tree,
buckthorn – tree and shrub sizes, red cedars, large Siberian elm, boxelder, more
buckthorn and small ash trees. Staff recommends only saving the red cedars if utility
work is out of the way. The parking lot bump out on the northwest corner contains
one healthy blue spruce that can be saved if no utility work is occurring nearby.
• On the southern parking lot edge there are two healthy linden trees that can remain if
utility work is out of the way. There are also currently two stumps (lindens) that can
be ground out to place additional trees on the southern edge if needed.
• Near the proposed new concrete sidewalk there are three excellent small
serviceberry trees that could be spaded elsewhere on the property.
35. Three existing public trees along Cedar are actually in very poor condition (dead). If the
applicant wishes they can replace three trees here to be counted towards landscape budget
on site.
36. Miscanthus species on the proposed landscape plan requires a special not from the University
of Minnesota resource
here: https://miscanthus.cfans.umn.edu/sites/miscanthus.cfans.umn.edu/files/2021-
07/miscanthusmanagementfactsheet.pdf Miscanthus sinensis is a bunch or caespitose grass,
it does not have invasive rhizomes and forms a large clump. Many ornamental forms or
cultivars of this species are grown in gardens and used for landscaping. These ornamental
forms when grown individually are usually not invasive in most garden settings. However, this
is the form of miscanthus that has invaded much of the Middle Atlantic states and sets seed
when grown with other miscanthus cultivars. See the management link for further
information. Miscanthus sinensis should only be planted where it can be managed and any
seedlings can be removed.
Now or Formerly:
Now or Formerly:
Now or Formerly:
LEGEND
8
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
DESCRIPTIONDATENOSUBMITTAL RECORD3000 Little Hills Expressway · Suite 102 · St. Charles, MO 63301314-656-4566 · 866-250-3679www.cecinc.comREFERENCE 0106/12/2023CITY COMMENTSDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:DRAWING NO.:
SHEET OF 331-50005/08/2023JGMDRAFTDRAFT03HIGHER GROUND EDUCATION14605 GLAZIER AVEAPPLE VALLEY, MN 55124ENGINEER OF RECORD
(PE# XXXXXXXXXX)
*HAND SIGNATURE ON FILE
811 or 1-800-252-1166
https://www.gopherstateonecall.org/
NORTH
14605 GLAZIER AVE, APPLE VALLEY, MINNESOTA
HIGHER GROUND EDUCATION
DEVELOPMENT NOTES:
SITE
NORTH
SITE PLANS FOR
DEMOLITION PLAN
SANITARY & STORM SEWER
WATER SERVICE
ELECTRIC SERVICE
GAS SERVICE
UTILITY COMPANIES
CIVIL ENGINEER
CIVIL & ENVIRONMENTAL CONSULTANTS, INC.
3000 LITTLE HILLS EXPRESSWAY; SUITE 102
ST. CHARLES, MO 63301
PH: (314) 656-4566
FX: (314) 656-4595
CONTACT: PATRICK BENNETT, PE
ARCHITECT
ALLEDN+PEPPA ARCHITECTS, INC.
215 FULTON STREET
GENEVA, IL 60134
PH: (630) 578-1105
EMAIL: akerner@allenpepa.com
CONTACT: AMANDA KERNER
GENERAL CONTRACTOR
GLOBAL POWER & CONSTRUCTION, INC.
7S 882 CAMP DEAN ROAD;
BIG ROCK, IL
OWNER/ DEVELOPER
NVS PROPERTIES, LLC.
227 W. MONROE, SUITE 5040
CHICAGO, IL 60606
FIRE SERVICE
BENCHMARK
1"=20'C000
01COVER / DEMO PLANUSE CODE
REQUIREMENT SQ.FT.PARKING
REQUIRED
DAY
NURSERIES
10 + 1 PER 500
SQ.FT. OF BLDG.5,504 21
EXISTING PARKING 51
PROPOSED PARKING 44
KEY NOTES
GENERAL NOTES:
06/12/23
Now or Formerly:
Now or Formerly:
Now or Formerly:
NIDO / TODDLER PLAYGROUND
3,000 SQ.FT. REQUIRED
3,050 SQ.FT.± PROVIDED
(INCLUDING SIDEWALK)
PROPOSED BUILDING
5,500 S.F.±
CHILDREN'S PLAYGROUND
6,750 SQ.FT. REQUIRED
6,750 SQ.FT.± PROVIDED
(INCLUDING SIDEWALK)
PROPOSED BUILDING
5,500 S.F.±
FF = 955.75±
DISTURBANCE AREA.
TOTAL = 15,900 SF (0.37 AC)
DISTURBANCE AREA
DISTURBANCE AREA
LEGEND
8
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
DESCRIPTIONDATENOSUBMITTAL RECORD3000 Little Hills Expressway · Suite 102 · St. Charles, MO 63301314-656-4566 · 866-250-3679www.cecinc.comREFERENCE 0106/12/2023CITY COMMENTSDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:DRAWING NO.:
SHEET OF 331-50005/08/2023JGMDRAFTDRAFT03HIGHER GROUND EDUCATION14605 GLAZIER AVEAPPLE VALLEY, MN 55124ENGINEER OF RECORD
(PE# XXXXXXXXXX)
*HAND SIGNATURE ON FILE
811 or 1-800-252-1166
https://www.gopherstateonecall.org/1"=60'C200
02SITE / GRADING PLANNORTH
KEY NOTES
8
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
DESCRIPTIONDATENOSUBMITTAL RECORD3000 Little Hills Expressway · Suite 102 · St. Charles, MO 63301314-656-4566 · 866-250-3679www.cecinc.comREFERENCE 0106/12/2023CITY COMMENTSDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:DRAWING NO.:
SHEET OF 331-50005/08/2023JGMDRAFTDRAFT03HIGHER GROUND EDUCATION14605 GLAZIER AVEAPPLE VALLEY, MN 55124ENGINEER OF RECORD
(PE# XXXXXXXXXX)
*HAND SIGNATURE ON FILE
811 or 1-800-252-1166
https://www.gopherstateonecall.org/1"=60'C800
03CONSTRUCTION DETAILS
NO. NAME DESCRIPTIONGENERAL1 G1-1 GENERAL BUILDING INFORMATIONARCHITECTURAL2 A1 DEMO PLAN W/ NEW OVERLAY3 A2 DEMO PLAN W/ NEW OVERLAY4 A5 CONCEPT EXTERIOR ELEVATIONS5 A3 1ST FLR CONCEPT PLAN6 A4 2ND FLR CONCEPT PLANALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:53 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvtGENERALBUILDINGINFORMATIONHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)G1-123-008--OF 616/9/236/9/23LIST OF DRAWINGSSITE LOCATIONHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124No. Date Description
BCDA2341135.00°135.00°672 SFTODDLER(13)673 SFTODDLER(13)600 SFTODDLER(12)544 SFNIDO (8)193 SFMECH/JAN.??52 SFND RR37 SFMACH. RM.144 SFVEST./WAITING57 SFELEV81 SFSPRINK./ELEC.62 SFEXIST.STAIR605 SFHALL48 SFSTAIR15 SFCLO.EXIST. MECH. EXIST. MECH. EXIST. MECH. EXIST. MECH. DUCTS IN DUCTS IN DUCTS IN DUCTS IN THIS AREATHIS AREATHIS AREATHIS AREA255 SFBREAKRM./ STAFFPREP86 SFHOSOFFICE82 SFTD RR74 SFTD RR74 SFTD RR55 SFPUBLIC RRREFREFREFREFREFREFREFREFDWDWDWDW67 SFHALLNOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.ALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:16 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvtDEMO PLANW/ NEWOVERLAYHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)A123-008AuthorCheckerOF 626/9/236/9/23No. Date Description1/4" = 1'-0"1DEMO 1ST FLR PLAN W/ NEW OVERLAY
BCDA234178 SFCH RR77 SFCH RR1,141 SFCHILDREN'SHOUSE (30)1,097 SFCHILDREN'SHOUSE (29)1,140 SFCHILDREN'SHOUSE (30)126 SFSTAIR28 SFLAUND.57 SFELEV108 SFHALLNEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOW81 SFCH RR48 SFPUBLIC RRALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:26 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvtDEMO PLANW/ NEWOVERLAYHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)A223-008AuthorCheckerOF 636/9/236/9/23No. Date Description1/4" = 1'-0"1DEMO 2ND FLR PLAN W/ NEW OVERLAY
135.00°135.00°672 SFTODDLER(13)673 SFTODDLER(13)600 SFTODDLER(12)544 SFNIDO (8)193 SFMECH/JAN.116 SFKITCHENETTE52 SFND RR37 SFMACH. RM.14' - 6 5/8"14' - 6 5/8"14' - 6 5/8"14' - 6 5/8"144 SFVEST./WAITING57 SFELEV8' - 5 3/4"8' - 5 3/4"8' - 5 3/4"8' - 5 3/4"5' - 2"5' - 2"5' - 2"5' - 2"14' - 6 5/8"14' - 6 5/8"14' - 6 5/8"14' - 6 5/8"34' - 11 7/8"34' - 11 7/8"34' - 11 7/8"34' - 11 7/8"9' - 11 7/8"9' - 11 7/8"9' - 11 7/8"9' - 11 7/8"81 SFSPRINK./ELEC.62 SFEXIST.STAIR605 SFHALL48 SFSTAIR5' - 2"5' - 2"5' - 2"5' - 2"15 SFCLO.7' - 6"7' - 6"7' - 6"7' - 6"5' - 0"5' - 0"5' - 0"5' - 0"EXIST. MECH. EXIST. MECH. EXIST. MECH. EXIST. MECH. DUCTS IN DUCTS IN DUCTS IN DUCTS IN THIS AREATHIS AREATHIS AREATHIS AREA255 SFBREAKRM./ STAFFPREP4' - 8 3/8"4' - 8 3/8"4' - 8 3/8"4' - 8 3/8"20' - 3 3/4"20' - 3 3/4"20' - 3 3/4"20' - 3 3/4"11' - 0 3/4"11' - 0 3/4"11' - 0 3/4"11' - 0 3/4"41' - 1 1/4"41' - 1 1/4"41' - 1 1/4"41' - 1 1/4"3' - 4"3' - 4"3' - 4"3' - 4"86 SFHOSOFFICE5' - 9 3/4"5' - 9 3/4"5' - 9 3/4"5' - 9 3/4"82 SFTD RR10' - 7"10' - 7"10' - 7"10' - 7"8' - 0"8' - 0"8' - 0"8' - 0"74 SFTD RR6' - 3"6' - 3"6' - 3"6' - 3"74 SFTD RR8' - 2"8' - 2"8' - 2"8' - 2"15' - 4 1/2"15' - 4 1/2"15' - 4 1/2"15' - 4 1/2"10' - 7"10' - 7"10' - 7"10' - 7"7' - 11 7/8"7' - 11 7/8"7' - 11 7/8"7' - 11 7/8"6' - 10"6' - 10"6' - 10"6' - 10"5' - 0"5' - 0"5' - 0"5' - 0"4' - 0"4' - 0"4' - 0"4' - 0"7' - 7"7' - 7"7' - 7"7' - 7"4' - 10"4' - 10"4' - 10"4' - 10"55 SFPUBLIC RR4' - 5 7/8"4' - 5 7/8"4' - 5 7/8"4' - 5 7/8"5' - 2"5' - 2"5' - 2"5' - 2"DWDWDWDW13' - 6"13' - 6"13' - 6"13' - 6"7' - 2"7' - 2"7' - 2"7' - 2"67 SFHALL8' - 0 1/8"8' - 0 1/8"8' - 0 1/8"8' - 0 1/8"5' - 0 1/2"5' - 0 1/2"5' - 0 1/2"5' - 0 1/2"15' - 2 1/2"15' - 2 1/2"15' - 2 1/2"15' - 2 1/2"26' - 1 1/8"26' - 1 1/8"26' - 1 1/8"26' - 1 1/8"7' - 11 1/8"7' - 11 1/8"7' - 11 1/8"7' - 11 1/8"13' - 4 1/8"13' - 4 1/8"13' - 4 1/8"13' - 4 1/8"TRAVEL DISTANCE: 39' -7"'22223333115A1122234B4C4C777891011111112BCDA234120' - 9 1/4"20' - 9 1/4"20' - 9 1/4"20' - 9 1/4"29' - 10 3/4"29' - 10 3/4"29' - 10 3/4"29' - 10 3/4"21' - 1 5/8"21' - 1 5/8"21' - 1 5/8"21' - 1 5/8"34C1415164DNOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON NOTE: COLUMN LOCATIONS ARE ESTIMATED BASED ON BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER BEST INFORMATION AVAILABLE. STRUCTURAL ENGINEER TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.TO VERIFY EXACT LOCATIONS IN FIELD.7' - 2"7' - 2"7' - 2"7' - 2"171717429' - 0 3/4"29' - 0 3/4"29' - 0 3/4"29' - 0 3/4"19' - 1 3/4"19' - 1 3/4"19' - 1 3/4"19' - 1 3/4"54' - 11 5/8"4' - 11 5/8"4' - 11 5/8"4' - 11 5/8"5' - 0"5' - 0"5' - 0"5' - 0"531 SFCLO.REFREFREFREFREFREFREFREF3' - 0 1/2"3' - 0 1/2"3' - 0 1/2"3' - 0 1/2"1837 SFCLO.193A34B10' - 3 3/4"10' - 3 3/4"10' - 3 3/4"10' - 3 3/4"ALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:36 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvt1ST FLRCONCEPTPLANHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)A323-008AuthorCheckerOF 656/9/236/9/23No. Date Description01 - CLASSROOM OCCUPANCYNAME NO.OCCUPANTLOADFACTORACTUALALLOWABLEOCCUPANTREQUIREDAREAHG MINSFHG REQ'DAREACommentsAREA# STUDENTS(ENROLLMENT)TODDLER (13) 141 35 672 SF 13 19.2 455 SF 48 624 SFTODDLER (13) 142 35 673 SF 13 19.2 455 SF 48 624 SFTODDLER (12) 143 35 600 SF 12 17.1 420 SF 48 576 SFNIDO (8) 144 55 544 SF 8 9.9 440 SF 68 544 SFCHILDREN'S HOUSE (30) 153 35 1,141 SF 30 32.6 1,050 SF 38 1,140 SFCHILDREN'S HOUSE (29) 154 35 1,097 SF 29 31.3 1,015 SF 38 1,102 SFCHILDREN'S HOUSE (30) 155 35 1,140 SF 30 32.6 1,050 SF 38 1,140 SFTOTAL5,866 SF 1351/4" = 1'-0"1FIRST FLOOR PLAN01 - Keynotes - FLOOR PLANNOTEDESCRIPTION1 EXIST. DOOR TO REMAIN2 FULL HEIGHT, HALF LITE DOOR3 FULL HEIGHT, FULL LITE DOOR3A FULL HEIGHT, FULL LITE DOOR, FROSTED GLASS4 NEW STOREFRONT4B MODIFY/REPLACE EXIST. STOREFRONT4C REPLACE EXIST. SLIDING DOOR WITH NEW STOREFRONT4D HALF WALL W/ STOREFRONT5 FULL HEIGHT SOLID DOOR(S)5A FULL HEIGHT SOLID DOOR(S) - APPROX. 6'-0" TALL6 HALF HEIGHT DOOR7 CHILD HEIGHT SINK, TYP.8 EXIST. ELECT. PANELS TO REMAIN9 EXIST. WATER METER. TO REMAIN10 REPLACE EXIST. WATER HEATERS11 REPLACE EXIST. WATER FURNACES AS REQ'D.12 EXIST. ELEV. EQUIP. TO REMAIN13 EXIST. MECH. CHASE14 2ND FLR ABOVE15 EXIST. MECHANICAL EQUIPMENT16 EXIST. GAS & ELECT. METER17 4 FT. HIGH WALL18 CARTS19 DIAPER CHANGING TABLE20 SLIDING DOOR
78 SFCH RR77 SFCH RR1,141 SFCHILDREN'SHOUSE (30)1,097 SFCHILDREN'SHOUSE (29)1,140 SFCHILDREN'SHOUSE (30)126 SFSTAIR28 SFLAUND.57 SFELEV24' - 6"24' - 6"24' - 6"24' - 6"24' - 2 3/8"24' - 2 3/8"24' - 2 3/8"24' - 2 3/8"25' - 4 3/8"25' - 4 3/8"25' - 4 3/8"25' - 4 3/8"10' - 7 1/4"10' - 7 1/4"10' - 7 1/4"10' - 7 1/4"10' - 6"10' - 6"10' - 6"10' - 6"44' - 2"44' - 2"44' - 2"44' - 2"108 SFHALL5' - 6"5' - 6"5' - 6"5' - 6"8' - 2"8' - 2"8' - 2"8' - 2"6' - 9"6' - 9"6' - 9"6' - 9"4' - 4 3/4"4' - 4 3/4"4' - 4 3/4"4' - 4 3/4"77665513BCDA2341NEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOWNEW ADDITION/ROOF BELOW81 SFCH RR65' - 3"5' - 3"5' - 3"5' - 3"8' - 1"8' - 1"8' - 1"8' - 1"8' - 5"8' - 5"8' - 5"8' - 5"548 SFPUBLIC RR43' - 2"3' - 2"3' - 2"3' - 2"55' - 1 1/2"55' - 1 1/2"55' - 1 1/2"55' - 1 1/2"185' - 1 5/8"5' - 1 5/8"5' - 1 5/8"5' - 1 5/8"203' - 2"3' - 2"3' - 2"3' - 2"3' - 0"3' - 0"3' - 0"3' - 0"22' - 2"22' - 2"22' - 2"22' - 2"3' - 0"3' - 0"3' - 0"3' - 0"12' - 10"12' - 10"12' - 10"12' - 10"3' - 2"3' - 2"3' - 2"3' - 2"3' - 0"3' - 0"3' - 0"3' - 0"21' - 5"21' - 5"21' - 5"21' - 5"ALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:43 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvt2ND FLRCONCEPTPLANHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)A423-008AuthorCheckerOF 666/9/236/9/23No. Date Description1/4" = 1'-0"1SECOND FLOOR PLAN01 - CLASSROOM OCCUPANCYNAME NO.OCCUPANTLOADFACTORACTUALALLOWABLEOCCUPANTREQUIREDAREAHG MINSFHG REQ'DAREACommentsAREA# STUDENTS(ENROLLMENT)TODDLER (13) 141 35 672 SF 13 19.2 455 SF 48 624 SFTODDLER (13) 142 35 673 SF 13 19.2 455 SF 48 624 SFTODDLER (12) 143 35 600 SF 12 17.1 420 SF 48 576 SFNIDO (8) 144 55 544 SF 8 9.9 440 SF 68 544 SFCHILDREN'S HOUSE (30) 153 35 1,141 SF 30 32.6 1,050 SF 38 1,140 SFCHILDREN'S HOUSE (29) 154 35 1,097 SF 29 31.3 1,015 SF 38 1,102 SFCHILDREN'S HOUSE (30) 155 35 1,140 SF 30 32.6 1,050 SF 38 1,140 SFTOTAL5,866 SF 13501 - Keynotes - FLOOR PLANNOTEDESCRIPTION1 EXIST. DOOR TO REMAIN2 FULL HEIGHT, HALF LITE DOOR3 FULL HEIGHT, FULL LITE DOOR3A FULL HEIGHT, FULL LITE DOOR, FROSTED GLASS4 NEW STOREFRONT4B MODIFY/REPLACE EXIST. STOREFRONT4C REPLACE EXIST. SLIDING DOOR WITH NEW STOREFRONT4D HALF WALL W/ STOREFRONT5 FULL HEIGHT SOLID DOOR(S)5A FULL HEIGHT SOLID DOOR(S) - APPROX. 6'-0" TALL6 HALF HEIGHT DOOR7 CHILD HEIGHT SINK, TYP.8 EXIST. ELECT. PANELS TO REMAIN9 EXIST. WATER METER. TO REMAIN10 REPLACE EXIST. WATER HEATERS11 REPLACE EXIST. WATER FURNACES AS REQ'D.12 EXIST. ELEV. EQUIP. TO REMAIN13 EXIST. MECH. CHASE14 2ND FLR ABOVE15 EXIST. MECHANICAL EQUIPMENT16 EXIST. GAS & ELECT. METER17 4 FT. HIGH WALL18 CARTS19 DIAPER CHANGING TABLE20 SLIDING DOOR
01 FIRST FLOOR0"02 SECOND FLOOR11' -0"03 2ND FLOOR PLATE20' -2"10' - 2 1/2"10' - 2 1/2"10' - 2 1/2"10' - 2 1/2"2341NEW STOREFRONT W/ NEW STOREFRONT W/ NEW STOREFRONT W/ NEW STOREFRONT W/ DOOR, MATCH EXIST.DOOR, MATCH EXIST.DOOR, MATCH EXIST.DOOR, MATCH EXIST.EXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT SHINGLE ROOFSHINGLE ROOFSHINGLE ROOFSHINGLE ROOFEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.NEW DOOR W/ FULL LITE NEW DOOR W/ FULL LITE NEW DOOR W/ FULL LITE NEW DOOR W/ FULL LITE TO MATCH EXIST.TO MATCH EXIST.TO MATCH EXIST.TO MATCH EXIST.NEW ADDITION FACADE NEW ADDITION FACADE NEW ADDITION FACADE NEW ADDITION FACADE TO MATCH EXIST. TO MATCH EXIST. TO MATCH EXIST. TO MATCH EXIST. BRICK FACADEBRICK FACADEBRICK FACADEBRICK FACADEEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.EXISTINGEXISTINGEXISTINGEXISTINGNEW ADDITIONNEW ADDITIONNEW ADDITIONNEW ADDITIONEXISTINGEXISTINGEXISTINGEXISTING01 FIRST FLOOR0"ROOF32' -0"02 SECOND FLOOR11' -0"03 2ND FLOOR PLATE20' -2"BCDANEW STOREFRONT W/ NEW STOREFRONT W/ NEW STOREFRONT W/ NEW STOREFRONT W/ DOOR, MATCH EXIST.DOOR, MATCH EXIST.DOOR, MATCH EXIST.DOOR, MATCH EXIST.EXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT SHINGLE ROOFSHINGLE ROOFSHINGLE ROOFSHINGLE ROOFEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.01 FIRST FLOOR0"02 SECOND FLOOR11' -0"03 2ND FLOOR PLATE20' -2"2341EXIST. EXIST. EXIST. EXIST. BRICK BRICK BRICK BRICK FACADEFACADEFACADEFACADEEXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT SHINGLE ROOFSHINGLE ROOFSHINGLE ROOFSHINGLE ROOFEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.01 FIRST FLOOR0"ROOF32' -0"02 SECOND FLOOR11' -0"03 2ND FLOOR PLATE20' -2"BCDANEW STOREFRONT, NEW STOREFRONT, NEW STOREFRONT, NEW STOREFRONT, MATCH EXIST.MATCH EXIST.MATCH EXIST.MATCH EXIST.EXIST. BRICK EXIST. BRICK EXIST. BRICK EXIST. BRICK FACADEFACADEFACADEFACADEEXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT EXIST. ASPHALT SHINGLE ROOFSHINGLE ROOFSHINGLE ROOFSHINGLE ROOFEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.ADDITION TO MATCH ADDITION TO MATCH ADDITION TO MATCH ADDITION TO MATCH EXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADEEXIST. BRICK FACADENEW STANDING SEAM NEW STANDING SEAM NEW STANDING SEAM NEW STANDING SEAM METAL ROOF COLOR TO METAL ROOF COLOR TO METAL ROOF COLOR TO METAL ROOF COLOR TO MATCH EXISTINGMATCH EXISTINGMATCH EXISTINGMATCH EXISTINGEXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT EXIST. STOREFRONT WINDOWS TO WINDOWS TO WINDOWS TO WINDOWS TO REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.REMAIN, U.N.O.NEW ADDITIONNEW ADDITIONNEW ADDITIONNEW ADDITIONEXISTINGEXISTINGEXISTINGEXISTING+/- 35' - 4 3/8"+/- 35' - 4 3/8"+/- 35' - 4 3/8"+/- 35' - 4 3/8"6' - 0" O.C. TYP.3" MAX4' - 0" OR 6'-0"2" MAXCLCL3"x3" ALUM. 3"x3" ALUM. 3"x3" ALUM. 3"x3" ALUM. POST., TYP.POST., TYP.POST., TYP.POST., TYP.3/4"x3/4" ALUM. 3/4"x3/4" ALUM. 3/4"x3/4" ALUM. 3/4"x3/4" ALUM. PICKET, TYP.PICKET, TYP.PICKET, TYP.PICKET, TYP.NOTE:NOTE:NOTE:NOTE:1. 1. 1. 1. CONCRETE FOOTINGS SHOULD BE 24" DEEP, CONCRETE FOOTINGS SHOULD BE 24" DEEP, CONCRETE FOOTINGS SHOULD BE 24" DEEP, CONCRETE FOOTINGS SHOULD BE 24" DEEP, 6" DIA. OR AS REQ'D BY CODE.6" DIA. OR AS REQ'D BY CODE.6" DIA. OR AS REQ'D BY CODE.6" DIA. OR AS REQ'D BY CODE.2. 2. 2. 2. ALL PERIMETER FENCING SHALL BE 6'ALL PERIMETER FENCING SHALL BE 6'ALL PERIMETER FENCING SHALL BE 6'ALL PERIMETER FENCING SHALL BE 6'----0" 0" 0" 0" HIGH, TYP. ALL INTEIROR FENCING SHALL BE HIGH, TYP. ALL INTEIROR FENCING SHALL BE HIGH, TYP. ALL INTEIROR FENCING SHALL BE HIGH, TYP. ALL INTEIROR FENCING SHALL BE 4'4'4'4'----0" HIGH, TYP.0" HIGH, TYP.0" HIGH, TYP.0" HIGH, TYP.CEDAR DBL. CEDAR DBL. CEDAR DBL. CEDAR DBL. DOORDOORDOORDOORNEW BRICK TO NEW BRICK TO NEW BRICK TO NEW BRICK TO MATCH EXIST. MATCH EXIST. MATCH EXIST. MATCH EXIST. BUILDING FACADEBUILDING FACADEBUILDING FACADEBUILDING FACADECAST STONE CAPCAST STONE CAPCAST STONE CAPCAST STONE CAP7' - 0"7' - 0"7' - 0"7' - 0"CEDAR CEDAR CEDAR CEDAR SINGLE SINGLE SINGLE SINGLE DOORDOORDOORDOOR7' - 0"7' - 0"7' - 0"7' - 0"NEW BRICK TO NEW BRICK TO NEW BRICK TO NEW BRICK TO MATCH EXIST. MATCH EXIST. MATCH EXIST. MATCH EXIST. BUILDING FACADEBUILDING FACADEBUILDING FACADEBUILDING FACADECAST STONE CAPCAST STONE CAPCAST STONE CAPCAST STONE CAPALLENPEPAA R C H I T E C T SINFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134ENGINEERS-PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHT6/9/2023 11:55:52 AMC:\Users\Amanda Kerner\Documents\23-008 HG Apple Valley - Central_akernerK6S8R.rvtCONCEPTEXTERIORELEVATIONSHIGHER GROUND APPLE VALLEY14605 GLAZIER AVEAPPLE VALLEY, MN 55124SCHEMATIC DESIGN 6/9/23 (NFC)A523-008--OF 646/9/236/9/231/8" = 1'-0"4NORTH ELEVATION1/8" = 1'-0"1WEST ELEVATION1/8" = 1'-0"3SOUTH ELEVATION1/8" = 1'-0"2EAST ELEVATIONNo. Date Description3/8" = 1'-0"5ALUMINUM FENCE1/4" = 1'-0"6DUMPSTER ELEV. - FRONT1/4" = 1'-0"7DUMPSTER ELEV. - SIDE
I T E M: 5.B.
P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :J une 21, 2023
S E C T I O N:L and Use / Action I tems
Description:
Hersi W indow Well Variance - P C23-19-V
S taff Contact:
K athy Bodmer, A I C P, City Planner
Department / Division:
Community Development Department
Applicant:
S aed Hersi
P roject Number:
P C23-19-V
Applicant Date: 6/7/2023 60 Days: 8/6/2023 120 Days: 10/5/2023
AC T I O N RE Q UE S T E D:
Recommend approval of the variance to reduce the side yard setback from five feet (5')
to three feet (3') (2' variance) to install two egress window wells on the east side of the
subject home based upon the findings listed below (1-3) and subject to the conditions
listed below (1-2).
Findings:
1. T he Hersi home was constructed in 1963 and met the setback and building requirements
of Ordinance #2 of the Town of Lebanon at that time. T he home is currently located six
feet (6') from the side property line.
2. Two basement windows are currently located on the east side of the home.
3. T he two bedrooms exist in the basement today. T he variance will allow the new
homeowner to place the home in a safe condition.
Conditions:
1. T he homeowner shall obtain all required building permits prior to construction.
2. T he homeowner shall obtain a Natural Resources Management Permit (N RMP) if
required for land disturbing activity.
S UM M ARY:
Saed Hersi owns the residential property at 181 150th Street West (C o Rd 42). He wishes to
create two bedrooms in his basement that will require the installation of egress windows and
window wells. T he home is located six feet (6') from the side property line. T he minimum
setback for window wells is five feet (5') from the side property line.
T he property owner requests the variance in order to encroach two feet (2') into the east side
yard setback. T he installation of the windows should have minimal impact on neighboring
properties.
B AC K G RO UND:
T he staff reviews variance applications based strictly upon the requirements of the State
statutes and the City Code which require the applicant to establish that there are practical
difficulties present in order for a variance to be granted, and that logical alternatives are not
available.
Definition of “Practical difficulties”:
T he applicant proposes to use the property in a reasonable manner not permitted by the
zoning provisions of the code;
T he plight of the applicant is due to circumstances unique to the property not created by
the applicant; and
T he variance, if granted, will not alter the essential character of the locality.
Economic considerations alone do not constitute practical dif ficulties.
Factors to Determine Practical Difficulty:
In order to grant a variance, the C ity considers the following factors to determine whether the
applicant established that there are practical difficulties in complying with the provision(s) of
this C hapter:
1. Special conditions apply to the structure or land in question that are particular to the
property and do not apply generally to other land or structures in the district or vicinity
in which the land is located;
2. T he granting of the proposed variance will not be contrary to the intent of this chapter;
3. T he special conditions or circumstances do not result from the actions of the
owner/applicant;
4. T he granting of the variance will not merely serve as a convenience to the applicant, but
is necessary to alleviate practical difficulties in complying with the zoning provisions of
this C ode; and
5. T he variance requested is the minimum variance necessary to alleviate the practical
difficulty.
Findings:
T he home was constructed in 1963 and met the side yard setback at the time; it is located six
feet (6') from the side property line. No side yard drainage and utility easements are located
along the side property line.
Two reasonable alternatives have been discussed. First, no bedrooms could be placed in the
basement. T he bedrooms exist today and appear to have been constructed in the home many
years ago. T he variance would help the new property owner to improve the safety and
livability of the home.
A second alternative would be to construct the windows on the front (south) and rear (north)
sides of the home. T he home's two side yards are narrow and reaching the rear yard with
equipment will be difficult. Installing the new windows at the front and the back of the home
would require cutting new openings into the side of the stucco home. T he existing windows
on the side of the home are already notched out of the stucco siding.
T he requested window well variances would improve the safety and livability of the home
and are consistent with other window well variances granted in the last few years in the
original Apple Valley subdivisions.
B UD G E T I M PAC T:
N/A
AT TAC HM E NT S :
Background Material
SITE
150TH ST W
ORIOLE DR
FRONTAGE RD
WALNUT LN
GARDEN VIEW DRCOUNTY ROAD 42 HAYES RDSTRESE LNCORTLAND DRKENT LNREDWELL LNDUCHESS LNELM DR
OAKWOOD RDWALNUT CIRBEACONLNFRONTAGE RD
150TH ST WCOUNTY ROAD 42
HERSI WINDOWWELL VARIANCE
µ
LOCATION MAP
^
SITE
P
R-5
R-5
NCC
NCC
R-5R-3
NCC
NCC R-5 R-3
R-3
R-3
R-3
R-3 R-3
150TH ST W
STRESE LN
FRONTAGE RD
ORIOLE DR HAYES RDWALNUT LN
GARDEN VIEW DRCOUNTY ROAD 42
ELM DR HA
V
E
N DROAKWOOD RDKENT LNLINDEN DRREDWELLLNDUCHESSLNSTRESE CIRFRONTAG E R D
150TH ST W COUNTY ROAD 42
µ
HERSI WINDOWWELL VARIANCE
ZONING MAP
^
/J t
"'ft',,, 1)1_ �rJ_,'l L/tJD J � ,;� .J
C a.i..e. n,n�n � : {_;U1 ;-!-
�
i7:-e__2 1 L/ �,," W )l, 3''-/ 1>{,r, 1" H
•n,t,-f-elear Of¥"'·� o-Fwtn elo� 5."7-��.
"rl.l'\ls/.e�4[ ✓ill W"u, /p1r
,, g� l�i�l'&l we! I S�Li»rl.
Area Map
Site Plan Sketch
Area Map with Aerial Photo
Street View Front of Home
East Elevation
Existing
Basement
Windows
Existing basement windows and window wells
I T E M: 6.A.
P L A NNI NG C O MMI S S I O N ME E T I NG D AT E :J une 21, 2023
S E C T I O N:Other Business
Description:
Review of Upcoming S chedule and Other Updates
S taff Contact:
B reanna Vincent, Department Assistant
Department / Division:
Community Development Department
AC T I O N RE Q UE S T E D:
N/A
S UM M ARY:
Next P lanning Commission Meetings:
Wednesday, J uly 19, 2023 - 7:00 p.m.
Public hearing applications due by 9:00 a.m. on Wednesday, J une 21, 2023.
Site plan, variance applications due by 9:00 a.m. on Wednesday, J uly 5, 2023.
Wednesday, August 2, 2023 - 7:00 p.m.
Public hearing applications due by 9:00 a.m. on Wednesday, J uly 5, 2023.
Site plan, variance applications due by 9:00 a.m. on Wednesday, J uly 19, 2023.
Next City Council Meetings:
T hursday, J uly 13, 2023 - 7:00 p.m.
T hursday, J uly 27, 2023 - 7:00 p.m.
B AC K G RO UND:
N/A
B UD G E T I M PAC T:
N/A